DirtyWaterWatch

Vermont / Dischargers /

Burlington Main WWTF combined sewer system (City of Burlington DPW Water Resources)

CSO · Vermont · Burlington

NPDES permit
VT0100153
Outfalls
6 with coordinates in the registry (the state's layer lists 3)
Receiving waters
Lake Champlain via Pine Street Barge Canal (CSO #3, S/N 005 Pine St); Wetlands contiguous to Winooski River / Intervale (CSO #1 S/N 003 Manhattan Dr/Park St; CSO #2 S/N 004 Manhattan Dr/North Champlain St)
Tracked waters
Lake Champlain, VT, Winooski River, VT
Events tracked
107 discharges · latest Aug 10, 2026, 9:06 PM EDT
Volume reported
17,475,231 gallons across the 47 discharges that give a volume (60 without one)

Source: discharger record from the project's research and EPA ECHO (dischargers.json); counts from the 107 event records below, as of 2026-11-02 11:56 UTC.

How it tells the public

Per 2025 CSO annual report: 'The City utilizes several platforms to issue required notifications, including VT Alert, social media (i.e. Facebook & Twitter), and Front Porch Forum.' Plant discharges that close beaches go out as News Flash posts (https://www.burlingtonvt.gov/m/newsflash?cat=8). Beach status: https://www.burlingtonvt.gov/1219/Beach-Closure-Tracker. Recreation areas within 1 mile are posted with physical signs. Also the state ANR system. | Statewide: every VT permittee must post a public alert at https://anrweb.vt.gov/DEC/WWInventory/SewageOverflows.aspx within 1 hour of discovery (10 V.S.A. § 1295(b)).

Sign up for its notices

Source: the project's research on each operator's notification channel (research/<state>/dischargers.json), checked by fetching the operator's pages.

Outfalls

Source: water outlines from OpenBoatLaunch and OpenStreetMap contributors (ODbL); outfalls from EPA ECHO and the state outfall layers; modeled reaches computed by DirtyWaterWatch from USGS NLDI, NHDPlus and the nearest USGS gauge (Jobson 1996); basemap OpenFreeMap and OpenMapTiles.

6 outfalls in the registry
  • 002 · TCS · LAKE CHAMPLAIN
  • 003 · CSO · Wetland contiguous with Winooski River
  • 004 · CSO · Wetland contiguous with Winooski River
  • 005 Gazo Avenue · CLS · Winooski River
  • 006 Colchester Avenue · CLS · Winooski River
  • 007 Pine Street · CLS · Lake Chmaplain

Source: EPA ECHO CSO outfall inventory matched to waters (data/outfalls-ne.json).

Event history

Events reported for Burlington Main WWTF combined sewer system (City of Burlington DPW Water Resources), newest first
StartEnd Water OutfallTypeVolumeSourceLinks
not reported (reported Aug 10, 2026, 9:26 PM EDT) not reported “Intervals wetlands” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4290, reported Aug 10, 2026, 9:26 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Aug 10, 2026, 9:06 PM EDT Aug 10, 2026, 10:41 PM EDT “Intervale Wetlands” (not placed) Park CSO Combined sewer overflow 12,155 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7095, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Aug 8, 2026, 6:13 PM EDT) not reported “Pine Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4287, reported Aug 8, 2026, 6:13 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Aug 8, 2026, 6:12 PM EDT) not reported “Intervale wetlands” (not placed) Manhatten Drive CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4286, reported Aug 8, 2026, 6:12 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Aug 8, 2026, 6:11 PM EDT) not reported “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4285, reported Aug 8, 2026, 6:11 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Aug 8, 2026, 5:09 PM EDT Aug 8, 2026, 5:24 PM EDT “Intervale Wetlands” (not placed) Manhatten Drive CSO Combined sewer overflow 23,000 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7092, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Aug 8, 2026, 5:07 PM EDT Aug 8, 2026, 5:40 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 47,529 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7093, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Aug 8, 2026, 5:02 PM EDT Aug 8, 2026, 5:37 PM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow 42,600 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7091, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Aug 6, 2026, 5:48 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pinestreet CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4283, reported Aug 6, 2026, 5:48 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Aug 6, 2026, 5:04 PM EDT Aug 6, 2026, 5:48 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 12,104 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7089, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Jul 28, 2026, 6:31 PM EDT) not reported Lake Champlain, VT Burlington Main Plant Unclassified recordrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4277, reported Jul 28, 2026, 6:31 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Jul 28, 2026, 4:28 PM EDT Jul 28, 2026, 5:30 PM EDT Lake Champlain, VT Burlington Main Wastewater Treatment Facility Unclassified record 857,200 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7086, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
not reported (reported Oct 8, 2025, 12:16 AM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4178, reported Oct 8, 2025, 12:16 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Oct 8, 2025, 12:05 AM EDT Oct 8, 2025, 1:15 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 51,221 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6909, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 14, 2025, 10:55 AM EDT Jul 14, 2025, 11:50 AM EDT Lake Champlain, VT Burlington Main WWTF Treatment plant bypass 103,500 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6874, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 7, 2025, 6:09 PM EDT) not reported “Pine Street Barge Canal.” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4151, reported Jul 7, 2025, 6:09 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 7, 2025, 5:45 PM EDT Jul 7, 2025, 6:20 PM EDT “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflow 535 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6863, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 19, 2024, 4:01 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4062, reported Aug 19, 2024, 4:01 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 19, 2024, 2:50 PM EDT Aug 19, 2024, 3:30 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 64,450 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6682, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 9, 2024, 10:42 AM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4053, reported Aug 9, 2024, 10:42 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 9, 2024, 10:30 AM EDT Aug 9, 2024, 10:55 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 2,000 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6665, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 4, 2024, 6:46 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4046, reported Aug 4, 2024, 6:46 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 4, 2024, 6:30 PM EDT Aug 4, 2024, 7:00 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 5,000 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6630, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 16, 2024, 12:16 AM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4034, reported Jul 16, 2024, 12:16 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 16, 2024, 12:01 AM EDT Jul 16, 2024, 12:36 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 1,634 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6596, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 10, 2024, 11:25 PM EDT Jul 10, 2024, 11:45 PM EDT “Pine Street Barge Canal” (not placed) Pine Street Barge Canal Combined sewer overflow 1,021 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6552, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 10, 2024, 9:40 PM EDT Jul 10, 2024, 9:55 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 934 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6559, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 10, 2024, 9:32 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4020, reported Jul 10, 2024, 9:32 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jun 20, 2024, 4:20 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4009, reported Jun 20, 2024, 4:20 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jun 20, 2024, 3:30 PM EDT Jun 20, 2024, 4:35 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 40,688 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6531, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jan 29, 2024, 1:56 PM EST) not reported Lake Champlain, VT CORRECTION: sewer line blockage Austin Dr. Area, draining to Blanchard Beach area. Sanitary sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3973, reported Jan 29, 2024, 1:56 PM EST, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jan 29, 2024, 1:19 PM EST) not reported Lake Champlain, VT Privately owned and operated pump station near Blanchard Beach area. Sanitary sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3972, reported Jan 29, 2024, 1:19 PM EST, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jan 26, 2024, 4:30 PM EST Jan 29, 2024, 12:40 PM EST Lake Champlain, VT Ledgewood Circle Sanitary sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6470, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Oct 7, 2023, 2:50 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3936, reported Oct 7, 2023, 2:50 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Oct 7, 2023, 2:35 PM EDT Oct 7, 2023, 4:45 PM EDT “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflow “>100,000 to 500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6411, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Sep 7, 2023, 3:48 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3930, reported Sep 7, 2023, 3:48 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Sep 7, 2023, 3:45 PM EDT Sep 7, 2023, 4:27 PM EDT “Pine Street Barge Canal” (not placed) Pine St. CSO Combined sewer overflow “>100,000 to 500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6398, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 8, 2023, 3:56 AM EDT) not reported “Pine st Barge Canal” (not placed) Pine St cso Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3918, reported Aug 8, 2023, 3:56 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 8, 2023, 3:50 AM EDT Aug 8, 2023, 4:25 AM EDT “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflow 11,028 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6366, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 16, 2023, 7:27 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:3905, reported Jul 16, 2023, 7:27 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 16, 2023, 7:24 PM EDT Jul 16, 2023, 8:32 PM EDT “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6311, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Apr 17, 2023, 10:28 AM EDT) not reported Lake Champlain, VT If the overflow reached thw lake, it would be near Burlington’s Boat House. This is unlikely, but out of an abundance of caution, we are reporting just in case. Sanitary sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2857, reported Apr 17, 2023, 10:28 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Apr 16, 2023, 3:57 PM EDT Apr 16, 2023, 4:09 PM EDT Lake Champlain, VT Lake St Sanitary sewer overflow “Under 100 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6273, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Feb 13, 2023, 7:40 PM EST Feb 13, 2023, 9:30 PM EST “Pot Ash Brook” (not placed) 1138 Pine Street Sanitary sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6267, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Nov 12, 2022, 6:12 AM EST) not reported “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2832, reported Nov 12, 2022, 6:12 AM EST, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Nov 12, 2022, 5:42 AM EST Nov 12, 2022, 6:37 AM EST “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6238, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Nov 6, 2022, 10:41 PM EST) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2831, reported Nov 6, 2022, 10:41 PM EST, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Nov 6, 2022, 10:28 PM EST Nov 6, 2022, 11:04 PM EST “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 3,116 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6234, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Sep 13, 2022, 3:55 PM EDT) not reported “Intervale Wetlands” (not placed) Park St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2777, reported Sep 13, 2022, 3:55 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Sep 13, 2022, 3:29 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2776, reported Sep 13, 2022, 3:29 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Sep 13, 2022, 3:20 PM EDT Sep 13, 2022, 4:35 PM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow 60,258 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6213, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Sep 13, 2022, 3:15 PM EDT Sep 13, 2022, 5:20 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 147,467 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6214, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 26, 2022, 4:05 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2771, reported Aug 26, 2022, 4:05 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 26, 2022, 4:04 PM EDT) not reported “Interval wetlands” (not placed) Park St CS0 Manhattan Dr CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2770, reported Aug 26, 2022, 4:04 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 26, 2022, 3:45 PM EDT Aug 26, 2022, 4:02 PM EDT “Intervale Wetlands” (not placed) Manhattan Dr CSO Combined sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6205, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 26, 2022, 3:40 PM EDT Aug 26, 2022, 4:05 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 25,437 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6207, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 26, 2022, 3:35 PM EDT Aug 26, 2022, 4:20 PM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow 50,235 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6206, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 28, 2022, 6:50 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2766, reported Jul 28, 2022, 6:50 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 28, 2022, 6:50 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2765, reported Jul 28, 2022, 6:50 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 28, 2022, 5:48 PM EDT Jul 28, 2022, 6:43 PM EDT “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6192, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jun 27, 2022, 8:43 AM EDT) not reported Lake Champlain, VT Pine Street CSO Park Street CSO City of Burlington Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2761, reported Jun 27, 2022, 8:43 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jun 27, 2022, 8:10 AM EDT Jun 27, 2022, 8:50 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 15,713 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6182, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jun 27, 2022, 8:00 AM EDT Jun 27, 2022, 8:25 AM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow 7,556 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6181, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jun 18, 2022, 11:56 PM EDT) not reported Lake Champlain, VT 53 Lavalley Ln, Burlington WWTF Bypassrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2759, reported Jun 18, 2022, 11:56 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jun 18, 2022, 8:40 PM EDT Jun 18, 2022, 10:25 PM EDT Lake Champlain, VT Main WWTF Treatment plant bypass 400,000 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6174, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Oct 31, 2021, 12:13 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2711, reported Oct 31, 2021, 12:13 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Oct 31, 2021, 11:59 AM EDT Oct 31, 2021, 12:32 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6088, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Sep 8, 2021, 6:28 PM EDT) not reported “Intervale Wetlands” (not placed) Park St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2698, reported Sep 8, 2021, 6:28 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Sep 8, 2021, 6:26 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2697, reported Sep 8, 2021, 6:26 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Sep 8, 2021, 6:10 PM EDT Sep 8, 2021, 6:25 PM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6068, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Sep 8, 2021, 6:06 PM EDT Sep 8, 2021, 7:34 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>100,000 to 500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6066, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 30, 2021, 9:05 AM EDT) not reported “Intervale Wetlands” (not placed) Park St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2693, reported Aug 30, 2021, 9:05 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 30, 2021, 8:33 AM EDT Aug 30, 2021, 8:49 AM EDT “Intervale Wetlands” (not placed) Park Street CSO Combined sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6063, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 14, 2021, 7:53 AM EDT) not reported “Intervale wetlands” (not placed) Manhattan Drive CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2687, reported Aug 14, 2021, 7:53 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 14, 2021, 7:48 AM EDT) not reported “Intervals Wetlands” (not placed) Park Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2686, reported Aug 14, 2021, 7:48 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 14, 2021, 7:47 AM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2685, reported Aug 14, 2021, 7:47 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 14, 2021, 7:47 AM EDT Aug 14, 2021, 8:02 AM EDT “Intervale Wetlands” (not placed) Manhattan Dr CSO Combined sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6052, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 14, 2021, 7:40 AM EDT Aug 14, 2021, 9:00 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>100,000 to 500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6051, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 14, 2021, 7:37 AM EDT Aug 14, 2021, 8:16 AM EDT “Intervale Wetlands” (not placed) Park Steet CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6050, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 20, 2021, 8:07 PM EDT Jul 20, 2021, 8:43 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6026, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 20, 2021, 7:21 PM EDT) not reported “Pine St Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2674, reported Jul 20, 2021, 7:21 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 20, 2021, 7:20 PM EDT) not reported “Interval Wetlands” (not placed) Park St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2673, reported Jul 20, 2021, 7:20 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 20, 2021, 7:14 PM EDT Jul 20, 2021, 7:50 PM EDT “Intervale wet lands” (not placed) Park Street CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6029, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 20, 2021, 7:10 PM EDT Jul 20, 2021, 7:30 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6027, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jul 18, 2021, 3:32 AM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2667, reported Jul 18, 2021, 3:32 AM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jul 18, 2021, 3:26 AM EDT Jul 18, 2021, 7:50 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>100,000 to 500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6013, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Feb 2, 2021, 12:22 PM EST) not reported Lake Champlain, VT Flynn Ave in Burlington. Unclassified recordrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2635, reported Feb 2, 2021, 12:22 PM EST, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Feb 2, 2021, 11:00 AM EST Feb 3, 2021, 12:00 PM EST Lake Champlain, VT 195 Flynn Ave Sanitary sewer overflow “>1,000 to 10,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5965, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 11, 2020, 10:55 PM EDT) not reported Lake Champlain, VT Burlington Main plant Unclassified recordrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2592, reported Aug 11, 2020, 10:55 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 11, 2020, 8:26 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St. CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2591, reported Aug 11, 2020, 8:26 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 11, 2020, 8:25 PM EDT Aug 11, 2020, 9:08 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “>10,000 to 100,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5902, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 11, 2020, 8:06 PM EDT Aug 11, 2020, 8:19 PM EDT Lake Champlain, VT Burlington Main Plant Treatment plant bypass “1,000,000 to 1,500,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5904, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 4, 2020, 8:16 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2580, reported Aug 4, 2020, 8:16 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 4, 2020, 8:08 PM EDT Aug 4, 2020, 10:08 PM EDT “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflow “150,000-200,000” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5890, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 2, 2020, 11:40 PM EDT) not reported “Intervale Wetlands” (not placed) Park St. CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2576, reported Aug 2, 2020, 11:40 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Aug 2, 2020, 11:40 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St. CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2575, reported Aug 2, 2020, 11:40 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 2, 2020, 11:24 PM EDT Aug 3, 2020, 1:07 AM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow “150,000-200,000 gallons” Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5885, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Aug 2, 2020, 11:17 PM EDT Aug 2, 2020, 11:49 AM EDT “Intervale Wet Lands” (not placed) Park Street CSO Combined sewer overflow 20,000 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5887, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

not reported (reported Jun 30, 2020, 8:34 PM EDT) not reported “Pine Street Barge Canal” (not placed) Pine St CSO Combined sewer overflowrevised not reported Burlington Main (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2565, reported Jun 30, 2020, 8:34 PM EDT, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Jun 30, 2020, 8:03 PM EDT Jun 30, 2020, 8:18 PM EDT “Pine Street Barge Canal” (not placed) Pine Street CSO Combined sewer overflow 19,375 gal Burlington Main (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:5874, the source gives no report time, retrieved 2026-11-02 10:55 UTC · notice
Full record (older than 180 days, so no page of its own)

This record in the archive list

Showing the newest 100 events of 203 events. See them all with filters.

History