Massachusetts / Events /
Combined sewer overflow: CITY OF FITCHBURG, May 14, 2026
Ended (as reported) · CITY OF FITCHBURG (MassDEP sewage notification portal)
Source: CITY OF FITCHBURG (MassDEP sewage notification portal) via MassDEP CSO API behind the portal (eeaonline.eea.state.ma.us/dep/CSOAPI/api/), record 5aa82bde-c654-41c7-b7c8-cda2a9e370f1, published May 26, 2026, 7:39 AM EDT, retrieved 2026-11-02 10:58 UTC · notice
Colours no water as of Nov 2, 2026, 6:56 AM EST: the windows on the methods page have passed, or the record has no time to count from.
A report is not a test of the water. See how statuses are worked out.
1. The reported outfall
Outfall reported by CITY OF FITCHBURG (MA0100986 outfall FIT045B): “MAIN ST @ PUTNAM ST (B)”. Location: 42.58182, -71.79839, from the state's or EPA's outfall layer.
2. Waters named in the notice
The notice names: “PUNCH BROOK CULVERT@BOULDER ST VIA MAIN ST”. Not placed on a tracked water.
3. Modeled downstream reach
Not modeled: the reach model runs on rivers above the head of tide only.
Source: water outlines from OpenBoatLaunch and OpenStreetMap contributors (ODbL); outfalls from EPA ECHO and the state outfall layers; modeled reaches computed by DirtyWaterWatch from USGS NLDI, NHDPlus and the nearest USGS gauge (Jobson 1996); basemap OpenFreeMap and OpenMapTiles.
When: three different times
The time of the event, the time the source reported, published or updated it, and the time we fetched it are kept apart. Times are shown in New England time; the record keeps the original offsets.
- Started
- Ended
- not reported
- Precision
- Known to the minute
- Reported to the source
- not given
- Published
- Source last updated
- not given
- We fetched it
What and how much
- Type
- Combined sewer overflow
- Status in the record
- Ended (as reported)
- Material
- “CSO – UnTreated”
- Volume
- not reported (not stated whether estimated or measured)
- Volume in the source's words
- none
Advice
“Avoid contact with these water bodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. See website for more information on whether specific resource areas, such as bathing beaches, are affected.”
- Advice window
- 48 hours
- Basis
- 314 CMR 16.04(10)(g)
Source and revisions
- Source
- MassDEP CSO API behind the portal (eeaonline.eea.state.ma.us/dep/CSOAPI/api/)
- Record id at the source
- 5aa82bde-c654-41c7-b7c8-cda2a9e370f1
- Original notice
- https://eeaonline.eea.state.ma.us/portal/dep/cso-data-portal/detail…
- Revision of
- none (first record)
- Revised by
- no later revision
Every field of the record
event_id | ma-massdep:5aa82bde-c654-41c7-b7c8-cda2a9e370f1 |
|---|---|
source_id | ma-massdep |
source_record_id | 5aa82bde-c654-41c7-b7c8-cda2a9e370f1 |
parent_event_id | null |
event_type | cso |
status | ended |
discharger_id | ma-fitchburg |
discharger_name | CITY OF FITCHBURG |
npdes_permit | MA0100986 |
outfall_id | FIT045B |
outfall_name | MAIN ST @ PUTNAM ST (B) |
waterbody_text | PUNCH BROOK CULVERT@BOULDER ST VIA MAIN ST |
water_slugs | [] |
water_match | none |
lat | 42.581822 |
lon | -71.798389 |
coord_source | outfall_layer |
coord_precision_m | null |
started_at | 2026-05-14T15:25:00-04:00 |
ended_at | null |
time_precision | minute |
reported_at | null |
published_at | 2026-05-26T07:39:59-04:00 |
source_updated_at | null |
fetched_at | 2026-11-02T10:58:11Z |
material | CSO – UnTreated |
volume_gal | null |
volume_text | null |
estimate_flag | unknown |
authority | CITY OF FITCHBURG (MassDEP sewage notification portal) |
advice_text | Avoid contact with these water bodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. See website for more information on whether specific resource areas, such as bathing beaches, are affected. |
advice_window_hours | 48 |
advice_window_basis | 314 CMR 16.04(10)(g) |
source_url | https://eeaonline.eea.state.ma.us/portal/dep/cso-data-portal/details/5aa82bde-c654-41c7-b7c8-cda2a9e370f1 |
parse_error | null |
fixture | false |
file | events/ma-massdep~3A5aa82bde-c654-41c7-b7c8-cda2a9e370f1.json |
duplicate_of | null |
placement_note | null |
unplaced_reason | null |
set_aside | null |
superseded | null |
reach | null |
reach_band | null |
The source's record (raw)
{
"incidentId": "5aa82bde-c654-41c7-b7c8-cda2a9e370f1",
"incidentNumber": "26016193",
"incidentDate": "2026-05-14T00:00:00",
"incidentTime": "15:25",
"amPm": null,
"reporterClass": "Public Notification Report",
"eventType": "CSO – UnTreated",
"permiteeClass": "CSO",
"permiteeName": "CITY OF FITCHBURG",
"permiteeId": "MA0100986",
"outfallId": "FIT045B",
"municipality": "FITCHBURG",
"reportingType": "Initial-Ceased",
"location": "MAIN ST @ PUTNAM ST (B)",
"latitude": null,
"longitude": null,
"waterBody": "PUNCH BROOK CULVERT@BOULDER ST VIA MAIN ST",
"waterBodyDescription": null,
"volumnOfEvent": "",
"rainfallData": "",
"hours": "",
"minutes": "",
"month": null,
"year": null,
"additionalInformation": null,
"submittedDate": "2026-05-26T07:39:59.767",
"parentIncidentId": null,
"_report_class": "Public Notification Report",
"_tz_assumed": "America/New_York (portal gives local clock time without zone)",
"_ended_note": "reported ceased; the portal gives no cessation time",
"_coords": "MassDEP CSOs layer DEP_OUTFL_ FIT045B (locations are estimates)",
"_water": {
"name_candidates": [
"nashua-river-ma"
]
},
"_advice_source": "required wording of 314 CMR 16.04(10)(g); the permittee's own advisory is only in an attachment the portal will not serve"
} Source: CITY OF FITCHBURG (MassDEP sewage notification portal) via MassDEP CSO API behind the portal (eeaonline.eea.state.ma.us/dep/CSOAPI/api/), record 5aa82bde-c654-41c7-b7c8-cda2a9e370f1, published May 26, 2026, 7:39 AM EDT, retrieved 2026-11-02 10:58 UTC · notice
Personal fields (names, emails, phone numbers of staff) are removed from raw records before they are stored.