New Hampshire / Events /
Treatment plant bypass: Town of Exeter WWTP, Sep 17, 2026
Ended (as reported) · Town of Exeter DPW (Combined Sewer & Sanitary Sewer Overflows page)
Source: Town of Exeter DPW (Combined Sewer & Sanitary Sewer Overflows page) via nh-permittees, record exeter:bypass:2026-09-17:1, the source gives no report time, retrieved 2026-11-02 11:55 UTC · notice
Colours no water as of Nov 2, 2026, 6:56 AM EST: the windows on the methods page have passed, or the record has no time to count from.
A report is not a test of the water. See how statuses are worked out.
1. The reported outfall
Outfall reported by Town of Exeter WWTP (NH0100871): “Wastewater Treatment Plant”. Location: no coordinates in the record or the outfall registry.
2. Waters named in the notice
The notice names: “Squamscott River”. We place it on Squamscott River, NH. Matched by the name of the water in the source record.
3. Modeled downstream reach
No modeled reach for this record in this build.
Source: water outlines from OpenBoatLaunch and OpenStreetMap contributors (ODbL); outfalls from EPA ECHO and the state outfall layers; modeled reaches computed by DirtyWaterWatch from USGS NLDI, NHDPlus and the nearest USGS gauge (Jobson 1996); basemap OpenFreeMap and OpenMapTiles.
When: three different times
The time of the event, the time the source reported, published or updated it, and the time we fetched it are kept apart. Times are shown in New England time; the record keeps the original offsets.
- Started
- Ended
- Precision
- Known to the minute
- Reported to the source
- not given
- Published
- not given
- Source last updated
- not given
- We fetched it
What and how much
- Type
- Treatment plant bypass
- Status in the record
- Ended (as reported)
- Material
- “non-disinfected treated effluent”
- Volume
- 488 gal (not stated whether estimated or measured)
- Volume in the source's words
- “488 gallons”
Advice
The record carries no advice text from Town of Exeter DPW (Combined Sewer & Sanitary Sewer Overflows page).
- Advice window
- not stated in the record; the state's window on the methods page applies
- Basis
- not stated
What it does to the map, over time
- Advisory in effect Squamscott River: Discharge in progress, Sep 17, 2026, 11:46 PM EDT to Sep 17, 2026, 11:48 PM EDT
- Advisory in effect Squamscott River: Within the authority's advice window after the discharge ended, Sep 17, 2026, 11:48 PM EDT to Sep 20, 2026, 11:48 PM EDT
Source: intervals computed by DirtyWaterWatch (build/status.py) from this record and the rules on the methods page, as of 2026-11-02 11:56 UTC.
Source and revisions
- Source
- nh-permittees
- Record id at the source
- exeter:bypass:2026-09-17:1
- Original notice
- https://www.exeternh.gov/publicworks/combined-sewer-sanitary-sewer-…
- Revision of
- none (first record)
- Revised by
- no later revision
Every field of the record
event_id | nh-permittees:exeter:bypass:2026-09-17:1 |
|---|---|
source_id | nh-permittees |
source_record_id | exeter:bypass:2026-09-17:1 |
parent_event_id | null |
event_type | plant_bypass |
status | ended |
discharger_id | nh-exeter-wwtp-bypass |
discharger_name | Town of Exeter WWTP |
npdes_permit | NH0100871 |
outfall_id | null |
outfall_name | Wastewater Treatment Plant |
waterbody_text | Squamscott River |
water_slugs | ["squamscott-river-nh"] |
water_match | name |
lat | null |
lon | null |
coord_source | null |
coord_precision_m | null |
started_at | 2026-09-17T23:46:00-04:00 |
ended_at | 2026-09-17T23:48:00-04:00 |
time_precision | minute |
reported_at | null |
published_at | null |
source_updated_at | null |
fetched_at | 2026-11-02T11:55:02Z |
material | non-disinfected treated effluent |
volume_gal | 488 |
volume_text | 488 gallons |
estimate_flag | unknown |
authority | Town of Exeter DPW (Combined Sewer & Sanitary Sewer Overflows page) |
advice_text | null |
advice_window_hours | null |
advice_window_basis | null |
source_url | https://www.exeternh.gov/publicworks/combined-sewer-sanitary-sewer-overflows |
parse_error | null |
fixture | false |
file | events/nh-permittees~3Aexeter~3Abypass~3A2026-09-17~3A1.json |
duplicate_of | null |
placement_note | null |
unplaced_reason | null |
set_aside | null |
superseded | null |
reach | null |
reach_band | null |
The source's record (raw)
{
"section": "Non-disinfected Discharge",
"text": "September 17, 2026 - Due to an unexpected power outage at 11:46 p.m. for 2 minutes, a non-disinfected discharge of 488 gallons occurred into the Squamscott river from the Wastewater Treatment Plant."
} Source: Town of Exeter DPW (Combined Sewer & Sanitary Sewer Overflows page) via nh-permittees, record exeter:bypass:2026-09-17:1, the source gives no report time, retrieved 2026-11-02 11:55 UTC · notice
Personal fields (names, emails, phone numbers of staff) are removed from raw records before they are stored.