City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems)
Sewer utility with combined sewers · Oregon · Portland
Zoom in to see waters with no current status.
Map sources
Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Solid dots mark combined sewer outfalls. Ringed dots mark treatment plant outfalls. A yellow ring with a dashed edge means discharge likely or possible: heavy rain, no report received. Square boat markers mark boat launches listed by OpenBoatLaunch.
- Federal wastewater discharge permit (NPDES)
- OR0026905, OR0026891
- Wastewater outlets
- 36 combined sewer outfalls and 1 treatment plant outfall listed by EPA or state agencies (the state's combined sewer records list 37) · List
- Waters listed as receiving wastewater
- Willamette River; Columbia Slough
- Tracked waters
- Columbia Slough, OR, Willamette River, OR
- Discharge records counted
- 10 records · latest
- Total reported volume in these records
- 14,905 gallons (56,400 litres) across the 7 records that give a volume (3 without one)
These totals reflect the records we track. Missing volumes and gaps in reporting limit comparisons between operators.
Sources: EPA ECHO and the operator and state sources linked below. Counts use the discharge records on this page. Updated 2026-11-25 22:57 UTC.
Public notices and alerts
Its public-notice channels
- Data feed · Required by a permit (OR0026905)
Read as a feed
DEQ permit general conditions (NPDES Schedule F; WPCF domestic general conditions): "If effluent limitations specified in this permit are exceeded or an overflow occurs that threatens public health, the permittee must take such steps as are necessary to alert the public, health agencies and other affected entities (e.g., public water systems) about the extent and nature of the discharge in accordance with the notification procedures specified in this permit or as specified in its Emergency Response and Public Notification Plan" (no deadline, no channel set)
- Operator's notice page · Voluntary (OR0026905)
Publishes a current status · last checked 2026-11-25 22:36 UTC · last changed Nov 25, 2026
- Email list · Voluntary (OR0026905)
Email list; not read
Source: City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems)'s public notice and alert pages and the state's notification records; DirtyWaterWatch register of public-notice channels and its page monitor.
Report a missing notice or error
Rain and discharges
The NOAA MRMS radar-only rainfall estimate for the 24 hours to the latest hour, read every hour at each outfall from the radar grid. NOAA's radar rainfall service labels its values as inches but has been publishing millimetres; since November 7, 2026 we work out the unit from the values themselves and from nearby airport rain gauges, convert to inches, and record with each reading the unit read. We show a caution when the rain reaches the amount below and no discharge report has arrived.
- Threshold
- 0.1 inch (2.5 mm) of rain in 24 hours, where the caution starts
- Rain that set the caution
- 0.8 inch (20 mm) in the 24 hours to Nov 22, 2026, 10:00 AM PST (radar peak)
- Radar now
- 0.26 inches (6.6 mm) in the 24 hours to Nov 25, 2026, 2:00 PM PST
- Caution
- Until 48 hours after the 24-hour total falls below 0.1 inch (2.5 mm); still at or above 0.1 inch (2.5 mm)
- Forecast
- Rain expected: 0.84 inches (21 mm) forecast in the next 24 hours (NWS forecast issued Nov 25, 2026, 1:41 PM PST); discharges here have begun at 0.1 inch (2.5 mm).
- Status
- Discharge possible: heavy rain, no report received
- Basis
- Our default
City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems) has too few dated overflow reports on record to set a level from (no dated overflow report from this operator in a source we read), and neither it nor its state publishes a rain rule, so our default applies: 0.1 inch of rain in 24 hours. This is our caution, based on rainfall (not a report or finding).
Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 22, 2026, 10:00 AM PST, latest reading valid Nov 25, 2026, 2:00 PM PST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.1 inch, from our default; rule: How it works, discharge likely or possible.
Wastewater outlets
Outfall: a pipe or outlet where wastewater enters a water body.
36 combined sewer outfalls and 1 treatment plant outfall listed by EPA or state agencies. Discharge likely or possible now at some of them: see Rain and discharges above.
Combined sewer outfalls
36 outfalls · discharge possible now at 36
Discharge possible: heavy rain, no report received Radar measured 0.80 inch (20 mm) of rain in the 24 hours to 10:00 a.m. on November 22 at this operator's combined sewer outfalls, the highest reading since this caution began (NOAA MRMS). Now: 0.26 inch (6.6 mm) in the 24 hours to 2:00 p.m. on November 25. The 24-hour total is still at or above 0.1 inch; the caution stays until 48 hours after it falls below. City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems) has too few dated overflow reports on record to set a level from (no dated overflow report from this operator in a source we read), and neither it nor its state publishes a rain rule, so our default applies: 0.1 inch of rain in 24 hours. This is our caution, based on rainfall (not a report or finding).
Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 22, 2026, 10:00 AM PST, latest reading valid Nov 25, 2026, 2:00 PM PST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.1 inch, from our default; rule: How it works, discharge likely or possible.
- Outfall 004 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 005 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 006 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 007 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 008 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 009 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 010 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 011 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 012 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 013 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 014 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
- Outfall 015 · receiving water in the permit: Willamette River · Willamette River, OR · open · now: discharge possible: heavy rain, no report received (basis: our default)
Showing 12 of 36.
Source: U.S. Environmental Protection Agency (EPA) national combined sewer outfall inventory (ECHO) and state outfall layers. Open or closed as EPA's inventory lists it. DirtyWaterWatch links outlets to waters using permit numbers, locations and names.
Treatment plant outfalls
1 outfall
- Plant outfall · receiving water in the permit: WILLAMETTE RIVER · Willamette River, OR · status not published · shown at the treatment plant (the outlet's own location is not published)
Source: U.S. Environmental Protection Agency (EPA) permit records (ICIS-NPDES permitted features): where a treatment plant’s permitted discharge leaves. No national source says whether a plant outfall is open or closed.
Reports and advisories
Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system.
| When | Report | Status |
|---|---|---|
| Water not mapped · SSO · 500 gal, estimated report · notice | reported | |
| to 11:00 AM PDT | Willamette River · SSO · 60 gal, estimated report · notice · map | ended |
| to Mar 14, 3:34 AM PDT | Willamette River · CSO · volume not reported report · notice · map | ended |
| Water not mapped · SSO · 600 gal, estimated report · notice | reported | |
| to 9:03 AM PST | Willamette River · SSO · 1,995 gal, estimated report · notice · map | ended |
| to Dec 19 ’25, 2:00 AM PST | Willamette River · CSO · volume not reported report · notice · map | ended |
| to 3:00 PM PST | Willamette River · CSO · volume not reported report · notice · map | ended |
| Water not mapped · SSO · 4,000 gal, estimated report · notice | ongoing | |
| to Dec 5 ’25, 12:53 PM PST | Water not mapped · SSO · 2,750 gal, estimated report · notice | ended |
| to 1:15 AM PST | Columbia Slough, Willamette River · CSO · 5,000 gal, estimated report · notice · map | ended |
Sources: City of Portland Environmental Services news RSS: CSO Advisories and Sewage Advisories, retrieved 2026-11-25 22:38 UTC. A report's record id and times show when you hover or focus its "report" link.
All reports in Oregon by year: 2026 (5 from City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems)) · 2025 (5 from City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems))
Other sewer operators on these waters
- Willamette River, OR: Brooks Sewage Treatment Plant, City of Albany (Albany-Millersburg water reclamation facility), City of Canby (Canby STP), City of Corvallis (wastewater reclamation plant and combined sewer outfalls), City of Cottage Grove (Cottage Grove STP), City of Dundee (Dundee STP), City of Harrisburg (Harrisburg Lagoon Treatment Plant), City of Independence (Independence STP), City of Newberg (Newberg - Wynooski Road STP), City of Oakridge (Oakridge STP), City of Salem (Willow Lake water pollution control facility), City of Westfir (Westfir STP), City of Wilsonville (Wilsonville STP), Metropolitan Wastewater Management Commission (Eugene-Springfield), Oak Lodge Water Services (water reclamation facility, Milwaukie), Water Environment Services (Clackamas County: Kellogg Creek, Tri-City, Hoodland and Boring plants)
The last 90 days
No discharge, advisory or caution periods are shown for the waters this sewer operator's reports were placed on in this time span. Check downstream stretches and source coverage.
Source: DirtyWaterWatch calculations using the reports named above and the published status rules. Updated 2026-11-25 22:57 UTC.
Reported discharges over time
- Discharges reported by City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems), last 12 months9December 2025 to November 2026Verified reports where available, else notices; revisions and duplicates counted once.
- Days with a discharge reported by City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems), last 12 months11December 2025 to November 2026A day counts once however many discharges were under way on it.
- Hours with a discharge or advisory status from City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems)'s reports, last 12 months420December 2025 to November 2026Red hours by the map's rules: each discharge to its reported end plus the state's post-discharge period; overlapping hours count once.
- 2026 season with a discharge or advisory status (City of Portland Environmental Services (Columbia Boulevard and Tryon Creek plants and the combined and separate sewer systems))1.1%May to October 2026Share of May 1 to October 31 hours with red status by the map's rules, of the hours a source covered.
Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater.
Reported discharges per month
10 reported discharges, January 2022 to November 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- No tracked source for this period
- Incomplete source coverage
No tracked source covers January 2022 to September 2025.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| January 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| February 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| March 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| April 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| May 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| June 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| July 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| August 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| September 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| October 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| November 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| December 2022 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| January 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| February 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| March 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| April 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| May 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| June 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| July 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| August 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| September 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| October 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| November 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| December 2023 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| January 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| February 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| March 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| April 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| May 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| June 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| July 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| August 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| September 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| October 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| November 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| December 2024 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| January 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| February 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| March 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| April 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| May 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| June 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| July 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| August 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| September 2025 | 0 | 0 | 0 | 0 | No tracked source for this period | |
| October 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2025 | 1 | 0 | 0 | 1 | Source records | |
| December 2025 | 2 | 2 | 0 | 4 | Source records | |
| January 2026 | 0 | 1 | 0 | 1 | Source records | |
| February 2026 | 0 | 1 | 0 | 1 | Source records | |
| March 2026 | 1 | 0 | 0 | 1 | Source records | |
| April 2026 | 0 | 0 | 0 | 0 | ||
| May 2026 | 0 | 0 | 0 | 0 | ||
| June 2026 | 0 | 0 | 0 | 0 | ||
| July 2026 | 0 | 1 | 0 | 1 | Source records | |
| August 2026 | 0 | 0 | 0 | 0 | ||
| September 2026 | 0 | 0 | 0 | 0 | ||
| October 2026 | 0 | 1 | 0 | 1 | Source records | |
| November 2026 | 0 | 0 | 0 | 0 |
Hours with a discharge or advisory status per month
Hours when a water had a discharge or advisory status from this sewer operator's reports, under DirtyWaterWatch rules.
- Discharge or advisory reported
- No tracked source for this period
- Incomplete source coverage
No tracked source covers January 2022 to September 2025. 2 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here. Official beach and cyanobacteria (harmful blue-green algae) advisories are counted on water pages only.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Month | Hours with a discharge or advisory status | Hours from post-discharge periods | Hours in the month | Coverage |
|---|---|---|---|---|
| January 2022 | 0 | 0 | 744 | No tracked source for this period |
| February 2022 | 0 | 0 | 672 | No tracked source for this period |
| March 2022 | 0 | 0 | 744 | No tracked source for this period |
| April 2022 | 0 | 0 | 720 | No tracked source for this period |
| May 2022 | 0 | 0 | 744 | No tracked source for this period |
| June 2022 | 0 | 0 | 720 | No tracked source for this period |
| July 2022 | 0 | 0 | 744 | No tracked source for this period |
| August 2022 | 0 | 0 | 744 | No tracked source for this period |
| September 2022 | 0 | 0 | 720 | No tracked source for this period |
| October 2022 | 0 | 0 | 744 | No tracked source for this period |
| November 2022 | 0 | 0 | 720 | No tracked source for this period |
| December 2022 | 0 | 0 | 744 | No tracked source for this period |
| January 2023 | 0 | 0 | 744 | No tracked source for this period |
| February 2023 | 0 | 0 | 672 | No tracked source for this period |
| March 2023 | 0 | 0 | 744 | No tracked source for this period |
| April 2023 | 0 | 0 | 720 | No tracked source for this period |
| May 2023 | 0 | 0 | 744 | No tracked source for this period |
| June 2023 | 0 | 0 | 720 | No tracked source for this period |
| July 2023 | 0 | 0 | 744 | No tracked source for this period |
| August 2023 | 0 | 0 | 744 | No tracked source for this period |
| September 2023 | 0 | 0 | 720 | No tracked source for this period |
| October 2023 | 0 | 0 | 744 | No tracked source for this period |
| November 2023 | 0 | 0 | 720 | No tracked source for this period |
| December 2023 | 0 | 0 | 744 | No tracked source for this period |
| January 2024 | 0 | 0 | 744 | No tracked source for this period |
| February 2024 | 0 | 0 | 696 | No tracked source for this period |
| March 2024 | 0 | 0 | 744 | No tracked source for this period |
| April 2024 | 0 | 0 | 720 | No tracked source for this period |
| May 2024 | 0 | 0 | 744 | No tracked source for this period |
| June 2024 | 0 | 0 | 720 | No tracked source for this period |
| July 2024 | 0 | 0 | 744 | No tracked source for this period |
| August 2024 | 0 | 0 | 744 | No tracked source for this period |
| September 2024 | 0 | 0 | 720 | No tracked source for this period |
| October 2024 | 0 | 0 | 744 | No tracked source for this period |
| November 2024 | 0 | 0 | 720 | No tracked source for this period |
| December 2024 | 0 | 0 | 744 | No tracked source for this period |
| January 2025 | 0 | 0 | 744 | No tracked source for this period |
| February 2025 | 0 | 0 | 672 | No tracked source for this period |
| March 2025 | 0 | 0 | 744 | No tracked source for this period |
| April 2025 | 0 | 0 | 720 | No tracked source for this period |
| May 2025 | 0 | 0 | 744 | No tracked source for this period |
| June 2025 | 0 | 0 | 720 | No tracked source for this period |
| July 2025 | 0 | 0 | 744 | No tracked source for this period |
| August 2025 | 0 | 0 | 744 | No tracked source for this period |
| September 2025 | 0 | 0 | 720 | No tracked source for this period |
| October 2025 | 0 | 0 | 744 | Incomplete source coverage |
| November 2025 | 49 | 49 | 720 | |
| December 2025 | 229 | 229 | 744 | |
| January 2026 | 48 | 48 | 744 | |
| February 2026 | 0 | 0 | 672 | |
| March 2026 | 93 | 93 | 744 | |
| April 2026 | 0 | 0 | 720 | |
| May 2026 | 0 | 0 | 744 | |
| June 2026 | 0 | 0 | 720 | |
| July 2026 | 49 | 49 | 744 | |
| August 2026 | 0 | 0 | 744 | |
| September 2026 | 0 | 0 | 720 | |
| October 2026 | 0 | 0 | 744 | |
| November 2026 | 0 | 0 | 595 |
Days with a reported discharge per month
A day counts when any counted discharge was under way on it, from its start to its reported end in Eastern Time; a report with no end counts its start day.
- No tracked source for this period
- Incomplete source coverage
No tracked source covers January 2022 to September 2025.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Month | Days with a reported discharge | Coverage |
|---|---|---|
| January 2022 | 0 | No tracked source for this period |
| February 2022 | 0 | No tracked source for this period |
| March 2022 | 0 | No tracked source for this period |
| April 2022 | 0 | No tracked source for this period |
| May 2022 | 0 | No tracked source for this period |
| June 2022 | 0 | No tracked source for this period |
| July 2022 | 0 | No tracked source for this period |
| August 2022 | 0 | No tracked source for this period |
| September 2022 | 0 | No tracked source for this period |
| October 2022 | 0 | No tracked source for this period |
| November 2022 | 0 | No tracked source for this period |
| December 2022 | 0 | No tracked source for this period |
| January 2023 | 0 | No tracked source for this period |
| February 2023 | 0 | No tracked source for this period |
| March 2023 | 0 | No tracked source for this period |
| April 2023 | 0 | No tracked source for this period |
| May 2023 | 0 | No tracked source for this period |
| June 2023 | 0 | No tracked source for this period |
| July 2023 | 0 | No tracked source for this period |
| August 2023 | 0 | No tracked source for this period |
| September 2023 | 0 | No tracked source for this period |
| October 2023 | 0 | No tracked source for this period |
| November 2023 | 0 | No tracked source for this period |
| December 2023 | 0 | No tracked source for this period |
| January 2024 | 0 | No tracked source for this period |
| February 2024 | 0 | No tracked source for this period |
| March 2024 | 0 | No tracked source for this period |
| April 2024 | 0 | No tracked source for this period |
| May 2024 | 0 | No tracked source for this period |
| June 2024 | 0 | No tracked source for this period |
| July 2024 | 0 | No tracked source for this period |
| August 2024 | 0 | No tracked source for this period |
| September 2024 | 0 | No tracked source for this period |
| October 2024 | 0 | No tracked source for this period |
| November 2024 | 0 | No tracked source for this period |
| December 2024 | 0 | No tracked source for this period |
| January 2025 | 0 | No tracked source for this period |
| February 2025 | 0 | No tracked source for this period |
| March 2025 | 0 | No tracked source for this period |
| April 2025 | 0 | No tracked source for this period |
| May 2025 | 0 | No tracked source for this period |
| June 2025 | 0 | No tracked source for this period |
| July 2025 | 0 | No tracked source for this period |
| August 2025 | 0 | No tracked source for this period |
| September 2025 | 0 | No tracked source for this period |
| October 2025 | 0 | Incomplete source coverage |
| November 2025 | 1 | |
| December 2025 | 4 | |
| January 2026 | 1 | |
| February 2026 | 1 | |
| March 2026 | 3 | |
| April 2026 | 0 | |
| May 2026 | 0 | |
| June 2026 | 0 | |
| July 2026 | 1 | |
| August 2026 | 0 | |
| September 2026 | 0 | |
| October 2026 | 1 | |
| November 2026 | 0 |
Reported volume per year
Gallons; 1 million gallons is 3.79 million litres (axis: K thousand, M million), summed from the 7 reports that gave a volume as a number (3 did not).
- Incomplete source coverage
3 of 10 discharge reports gave no volume as a number; only numbers are summed.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Year | Reported volume | Reports with a volume | Reports without a volume | Coverage |
|---|---|---|---|---|
| 2025 | 11,750 gallons (44,500 litres) | 3 | 2 | Incomplete source coverage |
| 2026 | 3,155 gallons (11,900 litres) | 4 | 1 |
Hours with a discharge or advisory status per year
Hours with a discharge or advisory status each year under DirtyWaterWatch rules; 2026 to date.
- Discharge or advisory reported
- Incomplete source coverage
2 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here. Official beach and cyanobacteria (harmful blue-green algae) advisories are counted on water pages only.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Year | Hours with a discharge or advisory status | Share of the year | Coverage |
|---|---|---|---|
| 2025 | 279 | 3.2% | Incomplete source coverage |
| 2026 | 190 | 2.4% |
Reported discharges by calendar month, all years
Every counted discharge report, by the calendar month it began.
Months are summed over every year a tracked source covers; the table gives the number of years behind each month.
Source: or-bes-news-rss. Records cover October 18, 2025 to November 25, 2026.
Show table
| Month | Reported discharges | Years of records |
|---|---|---|
| January | 1 | 1 |
| February | 1 | 1 |
| March | 1 | 1 |
| April | 0 | 1 |
| May | 0 | 1 |
| June | 0 | 1 |
| July | 1 | 1 |
| August | 0 | 1 |
| September | 0 | 1 |
| October | 1 | 2 |
| November | 1 | 2 |
| December | 4 | 1 |
How these charts are counted
We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow our rules. Shaded gaps mean missing coverage, not zero discharges.
- or-bes-news-rss: records from October 18, 2025 to the latest update