New York sewage discharges, January 2016

280 records of sewage discharges and water advisories in New York dated in January 2016, newest first. Each record keeps the source's own times and wording.

Source: the agencies, sewer operators and EPA records named on each row and on the Sources page. Updated 2026-11-25 22:57 UTC.

Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system.

Records in New York, January 2016, newest first
WhenReportStatus
Orangetown SD #2 · Hudson River · Report · “10 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “1.25 hours” · notice · mapreported
Orangetown SD #2 · Hudson River · Report · “10 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “1.3 hours ended.” · notice · mapended
Marcy · Report · “25 Gallons Per Minute Estimated”, estimated · cause “Pipe Break” · duration “3.3666666666666667 hours” · noticereported
Marcy · Report · “25 Gallons Per Minute Estimated”, estimated · cause “Pipe Break” · duration “3.4 hours ended.” · noticeended
SCSD#6 Kings Park · Nissequogue River · Report · volume not reported · cause “Pipe Break” · duration “2.0 hours ongoing.” · notice · mapongoing
SCSD#6 Kings Park · Nissequogue River · Report · “1000 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2 hours” · notice · mapreported
SCSD#6 Kings Park · Nissequogue River · Report · “15000 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2 hours” · notice · mapreported
SCSD#6 Kings Park · Nissequogue River · Report · “15000 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2.0 hours ended.” · notice · mapended
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “Gallons Actual”, measured or verified · cause “Insufficient System Capacity, Weather Conditions” · duration “24.0 hours ongoing.” · notice · mapongoing
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “125000 Gallons Estimated”, estimated · cause “Insufficient System Capacity” · duration “24 hours” · notice · mapreported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “24.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “24 hours” · notice · mapreported
Lakawanna WWTP -ECSD No.6 · Smoke Creek · Bypass · “200 Gallons Estimated”, estimated · cause “Other” · duration “0.1 hours ended.” · notice · mapended
Lakawanna WWTP -ECSD No.6 · Smoke Creek · Bypass · “200 Gallons Estimated”, estimated · cause “Other” · duration “8.3333333333333329E-2” · notice · mapreported
NYCDEP Bowery Bay WWTP · East River · Bypass · “6.9999999999999999E-4 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “0.5 hours ended.” · notice · mapended
NYCDEP Bowery Bay WWTP · East River · Bypass · “.0007 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “0.5 hours” · notice · mapreported
Unnamed facility (NY DEC Sewage Pollution Right to Know) · Report · volume not reported · noticereported
St Armand (T) Saranac Lake sewers · Saranac River · Report · “50 Gallons Estimated”, estimated · cause “Blockage” · duration “0.5 hours ended.” · notice · mapended
St Armand (T) Saranac Lake sewers · Saranac River · Report · “50 Gallons Estimated”, estimated · cause “Blockage” · duration “0.5 hours” · notice · mapreported
Fort Ann WWTP · Report · “4000 Gallons Estimated”, estimated · cause “Root Intrusion” · duration “14.5 hours” · noticereported
Mariaville Lake Sewer District #2 · Bypass · “500 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “1.0 hours ended.” · noticeended
Mariaville Lake Sewer District #2 · Bypass (earlier version) · “500 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “1 hours” · noticereported
Rensselaer County Sewer District · Hudson River · SSO · “10 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.1 hours ended.” · notice · mapended
Rensselaer County Sewer District · Hudson River · SSO · “10 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “8.3333333333333329E-2” · notice · mapreported
Cedar Creek Water Pollution Control Plant · Bypass · “25 Gallons Estimated”, estimated · cause “Other” · duration “0.5 hours ended.” · noticeended
Cedar Creek Water Pollution Control Plant · Bypass · “25 Gallons Estimated”, estimated · cause “Other” · duration “0.5 hours” · noticereported
Fleishmanns · “Bush-Kill Stream” · Report · “1 Gallons Estimated”, estimated · cause “Unknown At This Time” · noticereported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “5.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Scajaquada Creek · SSO · “1000000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “6.0 hours ongoing.” · notice · mapongoing
Newburgh WWTP · Hudson River · Bypass · “20 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “1 hours” · notice · mapreported
Newburgh WWTP · Hudson River · Bypass · “20 Gallons Per Minute Actual”, measured or verified · cause “Blockage” · duration “1.0 hours ended.” · notice · mapended
Saratoga County Sewer District No. 1 · “Stocks Kill, small creek near Birchwood drive” · SSO · “1200 Gallons Estimated”, estimated · cause “Pipe Break” · duration “7.0 hours ongoing.” · noticeongoing
Saratoga County Sewer District No. 1 · “Stocks Kill, small creek near Birchwood drive” · SSO · “1200 Gallons Estimated”, estimated · cause “Pipe Break” · duration “10 hours” · noticereported
Saratoga County Sewer District No. 1 · “Stocks Kill, small creek near Birchwood drive” · SSO (earlier version) · “1200 Gallons Estimated”, estimated · cause “Pipe Break” · duration “7 hours” · noticereported
Saratoga County Sewer District No. 1 · “Stocks Kill, small creek near Birchwood drive” · SSO (earlier version) · “1200 Gallons Estimated”, estimated · cause “Pipe Break” · duration “10.0 hours ongoing.” · noticeongoing
Lakeville · Report · “150 Gallons Estimated”, estimated · cause “Other” · duration “0.5 hours” · noticereported
Lakeville · Report · “150 Gallons Estimated”, estimated · cause “Other” · duration “0.5 hours ended.” · noticeended
NYS · Hudson River · CSO · “9000 Gallons Estimated”, estimated · cause “Power Outage” · duration “0.5 hours ended.” · notice · mapended
Washington County SD #2 · Hudson River · CSO · “9000 Gallons Estimated”, estimated · cause “Power Outage” · duration “0.5 hours” · notice · mapreported
Washington County SD #2 · Hudson River · CSO (earlier version) · “9000 Gallons Estimated”, estimated · cause “Power Outage” · duration “0.5 hours ended.” · notice · mapended
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “25 hours” · notice · mapreported
West Seneca · Cazenovia Creek · SSO (earlier version) · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “5.25 hours” · notice · mapreported
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “25.0 hours ongoing.” · notice · mapongoing
West Seneca · Cazenovia Creek · SSO (earlier version) · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “5.3 hours ended.” · notice · mapended
Newburgh WWTP · Hudson River · CSO · “5000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “27 hours” · notice · mapreported
Newburgh WWTP · Hudson River · CSO · volume not reported · duration “27.0 hours ongoing. Reason for…” · notice · mapongoing
Dewitt · Report · “300 Gallons Estimated”, estimated · cause “Pipe Break Two inch forcemain is leaking” · duration “2.5 hours ended.” · noticeended
Town of Colonie Sewer Improvement Area · Report · “200 Gallons Estimated”, estimated · cause “Blockage Grease Blockage” · duration “0.5 hours ended.” · noticeended
Dewitt · Report · “300 Gallons Estimated”, estimated · cause “Pipe Break Two inch forcemain is leaking” · duration “2.5 hours ended.” · noticeended
Town of Colonie Sewer Improvement Area · Report · “200 Gallons Estimated”, estimated · cause “Blockage Grease Blockage” · duration “0.5 hours ended.” · noticeended
Southtowns AWTF · Lake Erie · Report · “50 Gallons Per Minute Estimated”, estimated · cause “Pipe Break” · duration “3.0 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Lake Erie · Report · “50 Gallons Per Minute Estimated”, estimated · cause “Pipe Break” · duration “3 hours” · notice · mapreported
Town of Colonie Sewer Improvement Area · Report · “200 Gallons Estimated”, estimated · cause “Blockage” · duration “0.5 hours ended.” · noticeended
Town of Colonie Sewer Improvement Area · Report · “200 Gallons Estimated”, estimated · cause “Blockage” · duration “0.5 hours” · noticereported
Dewitt · Report · “300 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2.5 hours ended.” · noticeended
Dewitt · Report · “300 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2.5 hours” · noticereported
Bay Park Sewage Treatment Plant · Jamaica Bay · Report · “4 Gallons Per Minute Estimated”, estimated · cause “Rags and Paper” · duration “0.3 hours ended.” · notice · mapended
Onondaga County (Syracuse Metro) · Report · “1000 Gallons Estimated”, estimated · cause “Blockage Grease” · duration “1.9 hours ended.” · noticeended
Bay Park Sewage Treatment Plant · Jamaica Bay · Report · “4 Gallons Per Minute Estimated”, estimated · cause “Rags and Paper” · duration “0.3 hours ended.” · notice · mapended
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “121.3 hours ended.” · noticeended
Onondaga County (Syracuse Metro) · Report · “1000 Gallons Estimated”, estimated · cause “Blockage Grease” · duration “1.9 hours ended.” · noticeended
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “121.3 hours ended.” · noticeended
Ticonderoga · La Chute River · Report · “25 Gallons Per Minute Estimated”, estimated · cause “Blockage root” · duration “1.0 hours ended.” · notice · mapended
Ticonderoga · La Chute River · Report · “25 Gallons Per Minute Estimated”, estimated · cause “Blockage root” · duration “1.0 hours ended.” · notice · mapended
Bay Park Sewage Treatment Plant · Jamaica Bay · Report · “4 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “0.3 hours ended.” · notice · mapended
Bay Park Sewage Treatment Plant · Jamaica Bay · Report (earlier version) · “4 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “0.25 hours” · notice · mapreported
Onondaga County (Syracuse Metro) · Report · “1000 Gallons Estimated”, estimated · cause “Blockage” · duration “1.9 hours ended.” · noticeended
Onondaga County (Syracuse Metro) · Report · “1000 Gallons Estimated”, estimated · cause “Blockage” · duration “1.9166666666666663 hours” · noticereported
Ticonderoga · La Chute River · Report · “25 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “1 hours” · notice · mapreported
Ticonderoga · La Chute River · Report (earlier version) · “25 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “1.0 hours ended.” · notice · mapended
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “131.3 hours ongoing.” · noticeongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “131.3 hours ongoing.” · noticeongoing
Farmington · Mud Creek · Report · “550 Gallons Estimated”, estimated · cause “Pipe Break Contractor hit the force main…” · duration “2.5 hours ended.” · notice · mapended
Farmington · Mud Creek · Report · “550 Gallons Estimated”, estimated · cause “Pipe Break Contractor hit the force main…” · duration “2.5 hours ended.” · notice · mapended
Bay Park Sewage Treatment Plant · Report · “1 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage of roots and grease in 8"…” · duration “0.3 hours ended.” · noticeended
Bay Park Sewage Treatment Plant · Report · “1 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage of roots and grease in 8"…” · duration “0.3 hours ended.” · noticeended
Farmington · Mud Creek · Report · “550 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2.5 hours” · notice · mapreported
Farmington · Mud Creek · Report · “550 Gallons Estimated”, estimated · cause “Pipe Break” · duration “2.5 hours ended.” · notice · mapended
Bay Park Sewage Treatment Plant · Report · “1 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.3 hours ended.” · noticeended
Bay Park Sewage Treatment Plant · Report · “1 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.25 hours” · noticereported
Glen Cove Wastewater Treatment Facility · Glen Cove Creek · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage of paper and rags” · duration “0.8 hours ended.” · notice · mapended
Glen Cove Wastewater Treatment Facility · Glen Cove Creek · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage of paper and rags” · duration “0.8 hours ended.” · notice · mapended
NYCDEP City Wide CSO · “The discharge was from a Man made structure, please see DEP's website below” · CSO · “0 Gallons Per Minute” · cause “Weather Conditions Rain Event” · noticereported
Newburgh WWTP · Hudson River · Report · volume not reported · duration “41.0 hours ongoing.” · notice · mapongoing
Newburgh WWTP · Hudson River · CSO · “5000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “41.033333333333331 hours” · notice · mapreported
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
Bay Park Sewage Treatment Plant · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage in sanitary sewer due to…” · duration “0.4 hours ended.” · noticeended
NYCDEP City Wide CSO · “The discharge was from a Man made structure, please see DEP's website below” · CSO · “0 Gallons Per Minute” · cause “Weather Conditions Rain Event” · noticereported
Glen Cove Wastewater Treatment Facility · Glen Cove Creek · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.8 hours ended.” · notice · mapended
Glen Cove Wastewater Treatment Facility · Glen Cove Creek · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.83333333333333326 hours” · notice · mapreported
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “131.3 hours ongoing.” · noticeongoing
Bay Park Sewage Treatment Plant · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage Blockage in sanitary sewer due to…” · duration “0.4 hours ended.” · noticeended
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “131.3 hours ongoing.” · noticeongoing
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute” · cause “Weather Conditions Rain Event” · notice · mapreported
NYCDEP City Wide CSO · “The discharge was from a Man made structure, please see DEP's website below” · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1 hours” · noticereported
NYCDEP City Wide CSO · “The discharge was from a Man made structure, please see DEP's website below” · CSO · “Gallons Actual”, measured or verified · cause “Weather Conditions” · noticereported
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute” · cause “Weather Conditions Rain Event” · notice · mapreported
Bay Park Sewage Treatment Plant · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.4 hours ended.” · noticeended
Bay Park Sewage Treatment Plant · Report · “2 Gallons Per Minute Estimated”, estimated · cause “Blockage” · duration “0.41666666666666663 hours” · noticereported
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1 hours” · notice · mapreported
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Actual”, measured or verified · cause “Weather Conditions” · notice · mapreported
City of Glens Falls WWTP · Hudson River · Bypass · volume not reported · cause “Weather Conditions” · duration “0.8 hours ended.” · notice · mapended
City of Glens Falls WWTP · Hudson River · Bypass · volume not reported · cause “Weather Conditions” · duration “0.8 hours ended.” · notice · mapended
Oneida County WPCP · “Mohawk River” · Report · volume not reported · cause “Insufficient System Capacity Capacity of…” · duration “18.4 hours ongoing.” · noticeongoing
Cheektowaga · Scajaquada Creek · SSO · “1000000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “24.0 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.1 hours ongoing.” · notice · mapongoing
Oneida County WPCP · “Mohawk River” · Report · volume not reported · cause “Insufficient System Capacity Capacity of…” · duration “18.4 hours ongoing.” · noticeongoing
Cheektowaga · Scajaquada Creek · SSO · “1000000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “24.0 hours ongoing.” · notice · mapongoing
Cheektowaga · “Cayuga Creek” · SSO · “110 Gallons Per Minute Estimated”, estimated · noticereported
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “600 Gallons Per Minute Actual”, measured or verified · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “125000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Town of Tonawanda Wastewater Treatment Plant · “Two Mile Creek” · Report · “110 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · noticereported
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Rain / Melting Snow” · duration “20.0 hours ongoing.” · notice · mapongoing
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “3.0 hours ongoing.” · notice · mapongoing
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.5 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.1 hours ongoing.” · notice · mapongoing
Newburgh WWTP · Hudson River · Report · volume not reported · duration “31.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Ellicott Creek · SSO · “1800 Gallons Per Minute Estimated”, estimated · notice · mapreported
Cheektowaga · “Cayuga Creek” · SSO · “110 Gallons Per Minute Estimated”, estimated · noticereported
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “600 Gallons Per Minute Actual”, measured or verified · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “125000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Town of Tonawanda Wastewater Treatment Plant · “Two Mile Creek” · Report · “110 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · noticereported
Cheektowaga · Scajaquada Creek · SSO · “2450 Gallons Per Minute Estimated”, estimated · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “8100 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions heavy thunderstorms” · notice · mapreported
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Rain / Melting Snow” · duration “20.0 hours ongoing.” · notice · mapongoing
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “3.0 hours ongoing.” · notice · mapongoing
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · notice · mapreported
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.5 hours ongoing.” · notice · mapongoing
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · notice · mapreported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Scajaquada Creek · SSO · “1350 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rain” · notice · mapreported
City of Plattsburgh · Saranac River · CSO · “50 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1 hours” · notice · mapreported
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
City of Plattsburgh · Saranac River · CSO · volume not reported · duration “1.0 hours ended.” · notice · mapended
City of Plattsburgh · Saranac River · CSO · “50 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1 hours” · notice · mapreported
Newburgh WWTP · Hudson River · Report · volume not reported · duration “31.0 hours ongoing.” · notice · mapongoing
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Rain Event” · notice · mapreported
City of Glens Falls WWTP · Hudson River · Bypass · “100000 Gallons Actual”, measured or verified · cause “Weather Conditions” · duration “0.75 hours” · notice · mapreported
City of Glens Falls WWTP · Hudson River · Bypass · volume not reported · cause “Weather Conditions” · duration “0.8 hours ended.” · notice · mapended
Cheektowaga · Ellicott Creek · SSO · “1800 Gallons Per Minute Estimated”, estimated · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “2450 Gallons Per Minute Estimated”, estimated · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “8100 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions heavy thunderstorms” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rainfall” · notice · mapreported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions heavy rain” · duration “14.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Scajaquada Creek · SSO · “1350 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Heavy Rain” · notice · mapreported
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Rain Event” · notice · mapreported
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.083333333333333 hours” · notice · mapreported
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.1 hours ongoing.” · notice · mapongoing
Oneida County WPCP · “Mohawk River” · Report · volume not reported · cause “Insufficient System Capacity, Weather Conditions” · duration “18.4 hours ongoing.” · noticeongoing
Oneida County WPCP · “Mohawk River” · Bypass · “2431 Gallons Per Minute Actual”, measured or verified · cause “Insufficient System Capacity” · duration “18.416666666666664 hours” · noticereported
Town of Tonawanda Wastewater Treatment Plant · “Two Mile Creek” · Report · “110 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · noticereported
Town of Tonawanda Wastewater Treatment Plant · “Two Mile Creek” · Report · “110 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours” · noticereported
Cheektowaga · “Cayuga Creek” · SSO · “110 Gallons Per Minute Estimated”, estimated · noticereported
Cheektowaga · “Cayuga Creek” · SSO · “110 Gallons Per Minute Estimated”, estimated · duration “9.5 hours” · noticereported
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “3 hours” · notice · mapreported
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “3.0 hours ongoing.” · notice · mapongoing
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours” · notice · mapreported
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours ongoing.” · notice · mapongoing
Cheektowaga · Ellicott Creek · SSO · “1800 Gallons Per Minute Estimated”, estimated · duration “12 hours” · notice · mapreported
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “20 hours” · notice · mapreported
Cheektowaga · Ellicott Creek · SSO · “1800 Gallons Per Minute Estimated”, estimated · notice · mapreported
West Seneca · Cazenovia Creek · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “20.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Scajaquada Creek · SSO · “8100 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “12 hours” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “2450 Gallons Per Minute Estimated”, estimated · duration “12 hours” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “8100 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “2450 Gallons Per Minute Estimated”, estimated · notice · mapreported
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “600 Gallons Per Minute Actual”, measured or verified · cause “Weather Conditions” · duration “14.0 hours ongoing.” · notice · mapongoing
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “125000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “14 hours” · notice · mapreported
Town of Grand Island Wastwater Treatment… · Niagara River · Report (earlier version) · “600 Gallons Per Minute Actual”, measured or verified · cause “Weather Conditions” · duration “14 hours” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2 hours” · notice · mapreported
Town of Grand Island Wastwater Treatment… · Niagara River · Report · “125000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “14.0 hours ongoing.” · notice · mapongoing
Cheektowaga · Scajaquada Creek · SSO · “1350 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “12 hours” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “1350 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · notice · mapreported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “14 hours” · notice · mapreported
Town of Tonawanda Wastewater Treatment Plant · Ellicott Creek · Report · “80 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “3 hours” · notice · mapreported
Cheektowaga · Buffalo River · SSO · “500000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “14.0 hours ongoing.” · notice · mapongoing
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2 hours” · notice · mapreported
NYCDEP City Wide CSO · East River, Hudson River, Harlem River, Bronx River, Westchester Creek, Hutchinson River, Eastchester Bay, Long Island Sound, Flushing Bay, Alley Creek, Little Neck Bay, Newtown Creek, Gowanus Canal, Upper New York Bay, Kill Van Kull, Newark Bay, Jamaica Bay, Coney Island Creek · CSO · “0 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · notice · mapreported
Newburgh WWTP · Hudson River · CSO · volume not reported · duration “31.0 hours ongoing.” · notice · mapongoing
Newburgh WWTP · Hudson River · Report · volume not reported · duration “31.0 hours ongoing.” · notice · mapongoing
Newburgh WWTP · Hudson River · CSO · “5000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “30.966666666666665 hours” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “1000000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “24 hours” · notice · mapreported
Cheektowaga · Scajaquada Creek · SSO · “1000000 Gallons Estimated”, estimated · cause “Weather Conditions” · duration “24.0 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Foster Brook · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “1.8 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Rush Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.5 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Foster Brook · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “1.8 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Rush Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.5 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.0 hours ongoing.” · notice · mapongoing
West Seneca · “Cazenovia” · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Snow Melt / Rain” · duration “2.5 hours ongoing.” · noticeongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.0 hours ongoing.” · notice · mapongoing
St Armand (T) Saranac Lake sewers · Saranac River · Report · “100 Gallons Estimated”, estimated · cause “Blockage UNKNOWN” · duration “1.0 hours ended.” · notice · mapended
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.3 hours ongoing.” · notice · mapongoing
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.9 hours ongoing.” · notice · mapongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
West Seneca · “Cazenovia” · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Snow Melt / Rain” · duration “2.5 hours ongoing.” · noticeongoing
Southtowns AWTF · Foster Brook · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1.8333333333333333 hours” · notice · mapreported
Southtowns AWTF · Foster Brook · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “1.8 hours ongoing.” · notice · mapongoing
St Armand (T) Saranac Lake sewers · Saranac River · Report · “100 Gallons Estimated”, estimated · cause “Blockage UNKNOWN” · duration “1.0 hours ended.” · notice · mapended
Southtowns AWTF · Rush Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours” · notice · mapreported
Southtowns AWTF · Rush Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours ongoing.” · notice · mapongoing
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.3 hours ongoing.” · notice · mapongoing
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions Warm temperatures causing…” · duration “2.9 hours ongoing.” · notice · mapongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.0 hours ongoing.” · notice · mapongoing
Southtowns AWTF · Smoke Creek · Report · “1000 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2 hours” · notice · mapreported
West Seneca · “Cazenovia” · SSO · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.4833333333333334 hours” · noticereported
NYS · “Cazenovia” · Report · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours ongoing.” · noticeongoing
West Seneca · “Cazenovia” · SSO (earlier version) · “1400 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.5 hours ongoing.” · noticeongoing
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.3 hours ongoing.” · notice · mapongoing
Mount Vernon Sewer District · Lake Erie · SSO · “76 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.333333333333333 hours” · notice · mapreported
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.85 hours” · notice · mapreported
Blasdell WWTP · Rush Creek · Report · “800 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.9 hours ongoing.” · notice · mapongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time leak in force main exact…” · duration “59.3 hours ongoing.” · noticeongoing
St Armand (T) Saranac Lake sewers · Saranac River · Report · “100 Gallons Estimated”, estimated · cause “Blockage” · duration “1 hours” · notice · mapreported
St Armand (T) Saranac Lake sewers · Saranac River · Report · “100 Gallons Estimated”, estimated · cause “Blockage” · duration “1.0 hours ended.” · notice · mapended
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Unknown At This Time potentially a blockage or…” · duration “5.0 hours ongoing.” · notice · mapongoing
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Unknown At This Time potentially a blockage or…” · duration “5.0 hours ongoing.” · notice · mapongoing
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “131.25 hours” · noticereported
Onondaga County (Syracuse Metro) · Report (earlier version) · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “59.25 hours” · noticereported
Onondaga County (Syracuse Metro) · Report · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “59.3 hours ongoing.” · noticeongoing
Onondaga County (Syracuse Metro) · Report (earlier version) · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “121.3 hours ended.” · noticeended
Onondaga County (Syracuse Metro) · Report (earlier version) · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “59.3 hours ongoing.” · noticeongoing
Onondaga County (Syracuse Metro) · Report (earlier version) · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “121.25 hours” · noticereported
Onondaga County (Syracuse Metro) · Report (earlier version) · “300 Gallons Per Minute Estimated”, estimated · cause “Unknown At This Time” · duration “131.3 hours ongoing.” · noticeongoing
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “5.0 hours ongoing.” · notice · mapongoing
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “5 hours” · notice · mapreported
Saratoga County Sewer District No. 1 · Hudson River · SSO · “300 Gallons Estimated”, estimated · cause “Pipe Break Pipe failed during normal operation” · duration “21.5 hours ongoing.” · notice · mapongoing
Saratoga County Sewer District No. 1 · Hudson River · SSO · “250 Gallons Estimated”, estimated · cause “Pipe Break Force main failed under normal…” · duration “6.0 hours ongoing.” · notice · mapongoing
Saratoga County Sewer District No. 1 · Hudson River · SSO · “300 Gallons Estimated”, estimated · cause “Pipe Break Pipe failed during normal operation” · duration “21.5 hours ongoing.” · notice · mapongoing
NYCDEP Red Hook WWTP · Bypass · “720 Gallons Estimated”, estimated · cause “Valve was Leaking” · duration “0.3 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time Freezing weather likely…” · duration “25.0 hours ended.” · noticeended
Saratoga County Sewer District No. 1 · Hudson River · SSO · “250 Gallons Estimated”, estimated · cause “Pipe Break Force main failed under normal…” · duration “6.0 hours ongoing.” · notice · mapongoing
Big Sister Creek WWTP · “pike creek” · Report · “700 Gallons Per Minute Estimated”, estimated · cause “Weather Conditions” · duration “2.0 hours ongoing.” · noticeongoing
NYCDEP Red Hook WWTP · Bypass · “720 Gallons Estimated”, estimated · cause “Valve was Leaking” · duration “0.3 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time Freezing weather likely…” · duration “25.0 hours ended.” · noticeended
Saratoga County Sewer District No. 1 · Hudson River · SSO · “300 Gallons Estimated”, estimated · cause “Pipe Break” · duration “21.5 hours ongoing.” · notice · mapongoing
Saratoga County Sewer District No. 1 · Hudson River · SSO · “300 Gallons Estimated”, estimated · cause “Pipe Break” · duration “21.5 hours” · notice · mapreported
Saratoga County Sewer District No. 1 · Hudson River · SSO · “250 Gallons Estimated”, estimated · cause “Pipe Break” · duration “6.0 hours ongoing.” · notice · mapongoing
Saratoga County Sewer District No. 1 · Hudson River · SSO · “250 Gallons Estimated”, estimated · cause “Pipe Break” · duration “6 hours” · notice · mapreported
NYCDEP Red Hook WWTP · Bypass · “720 Gallons Estimated”, estimated · cause “Other” · duration “0.33305555555555555 hours” · noticereported
NYCDEP Red Hook WWTP · Bypass · “720 Gallons Estimated”, estimated · cause “Other” · duration “0.3 hours ended.” · noticeended
Village of Akron WWTF · “Ditch” · Report · “150 Gallons Estimated”, estimated · cause “Blockage grease and baby wipes” · duration “2.0 hours ended.” · noticeended
Village of Akron WWTF · “Ditch” · Report · “150 Gallons Estimated”, estimated · cause “Blockage grease and baby wipes” · duration “2.0 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time Freezing weather likely…” · duration “25.0 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time Freezing weather likely…” · duration “25.0 hours ended.” · noticeended
Village of Akron WWTF · “Ditch” · Report · “150 Gallons Estimated”, estimated · cause “Blockage” · duration “2.0 hours ended.” · noticeended
Village of Akron WWTF · “Ditch” · Report (earlier version) · “150 Gallons Estimated”, estimated · cause “Blockage” · duration “2 hours” · noticereported
Unnamed facility (NY DEC Sewage Pollution Right to Know) · Report · volume not reported · noticereported
Unnamed facility (NY DEC Sewage Pollution Right to Know) · Report · volume not reported · noticereported
Unnamed facility (NY DEC Sewage Pollution Right to Know) · Report · volume not reported · noticereported
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “25.0 hours ended.” · noticeended
Washingtonville · Moodna Creek · Report · “416 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “4.0 hours ended.” · notice · mapended
Town of Carmel SD #6 · Bypass · “15 Gallons Estimated”, estimated · cause “Air valve failure” · duration “2.0 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “25.0 hours ended.” · noticeended
City of Hudson Wastewater Treatment Facility · Report · “400 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “25 hours” · noticereported
City of Hudson Wastewater Treatment Facility · Report (earlier version) · “400 Gallons Estimated”, estimated · cause “Unknown At This Time” · duration “25 hours” · noticereported
Town of Carmel SD #6 · Bypass · “15 Gallons Estimated”, estimated · cause “Air valve failure” · duration “2.0 hours ended.” · noticeended
Town of Carmel SD #6 · Bypass · “15 Gallons Estimated”, estimated · cause “Other” · duration “2 hours” · noticereported
Town of Carmel SD #6 · Bypass · “15 Gallons Estimated”, estimated · cause “Other” · duration “2.0 hours ended.” · noticeended
Endicott · Susquehanna River · Report · “30 Gallons Estimated”, estimated · cause “Blockage plastic bags and wipes” · duration “8.3 hours ended.” · notice · mapended
NYCDEP Newtown Creek WWTP · Newtown Creek · CSO · “0.138 Gallons Per Minute Estimated”, estimated · cause “Illegal connection” · notice · mapreported
Endicott · Susquehanna River · Report · “30 Gallons Estimated”, estimated · cause “Blockage plastic bags and wipes” · duration “8.3 hours ended.” · notice · mapended
NYCDEP Newtown Creek WWTP · Newtown Creek · CSO · “0.138 Gallons Per Minute Estimated”, estimated · cause “Illegal connection” · notice · mapreported
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Blockage wipes” · duration “3.8 hours ongoing.” · notice · mapongoing
Endicott · Susquehanna River · Report · “10 Gallons Estimated”, estimated · cause “Blockage wipes” · duration “3.8 hours ongoing.” · notice · mapongoing
NYCDEP Newtown Creek WWTP · Newtown Creek · CSO · “0.13800000000000001 Gallons Per Minute Estimated”, estimated · cause “Other” · notice · mapreported
NYCDEP Newtown Creek WWTP · Newtown Creek · CSO (earlier version) · “0.138 Gallons Per Minute Estimated”, estimated · cause “Other” · duration “48 hours” · notice · mapreported
Endicott · Susquehanna River · Report · “30 Gallons Estimated”, estimated · cause “Blockage” · duration “8.25 hours” · notice · mapreported
Endicott · Susquehanna River · Report (earlier version) · “10 Gallons Estimated”, estimated · cause “Blockage” · duration “3.8 hours ongoing.” · notice · mapongoing
Endicott · Susquehanna River · Report (earlier version) · “30 Gallons Estimated”, estimated · cause “Blockage” · duration “8.3 hours ended.” · notice · mapended
Endicott · Susquehanna River · Report (earlier version) · “10 Gallons Estimated”, estimated · cause “Blockage” · duration “3.75 hours” · notice · mapreported

Sources: DEC Sewage Pollution Right to Know workbook 'Sewage_Discharge_Reports.xlsx', retrieved 2026-11-23 05:46 UTC. A report's record id and times show when you hover or focus its "report" link.