DirtyWaterWatch Public waters. Public record.

Arkansas / Reports /

Treatment plant bypass reported — City of Palestine, Sep 18, 2026

Not stated by the source · Arkansas Division of Environmental Quality (Reported Noncompliance Incident Data)

Source: Arkansas Division of Environmental Quality (Reported Noncompliance Incident Data) via Arkansas DEQ Reported Noncompliance Incident Data, record 87512cd9-d283-4af6-814e-419cb5a653c7, reported Sep 28, 2026, 12:00 AM CDT, retrieved 2026-11-26 01:19 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 25, 2026, 7:59 PM CST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: City of Palestine (federal wastewater discharge permit, NPDES, AR0039365). Outlet: “Pumps went down at the WWTP, had to turn the water out into the old effluent line to avoid pond and curtain damage, pumps will be pulled on Monday September 28th, repairs will be requested to be as quick as possible, we were advised to sample the effluent”. Location: not given in the report or in the outlet records.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names no water. Not linked to a mapped water. The report names no water; its source gives no location, so it is listed with its county and placed on no water (never on its permit's outfalls' water).

3. Estimated stretch

We estimate routes only on rivers, including their tidal stretches. We do not estimate routes through estuaries, the sea or lakes.

What the source reports

Event and notice times use Central Time (CST or CDT). Retrieval times use Coordinated Universal Time (UTC).

When

Started
Ended
The source gives no end.
Detail of the times
Times known to the day only

What

Type
Treatment bypass: wastewater skips one or more treatment steps.
Status in the record
Not stated by the source
Material
not stated
Cause
“Equipment Failure;”

How much

Volume
15,000 gallons, estimated (56,781 litres, our conversion)

Advice in the source

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Who reported it

Operator named
City of Palestine
Authority
Arkansas Division of Environmental Quality (Reported Noncompliance Incident Data)
Published by
Arkansas DEQ Reported Noncompliance Incident Data

When it was reported and read

Reported to the source
Published
not given
Source last updated
not given

DirtyWaterWatch observations

Last retrieved by DirtyWaterWatch

Source

Source
Arkansas DEQ Reported Noncompliance Incident Data
Source record number
87512cd9-d283-4af6-814e-419cb5a653c7
Original notice
Read the original notice

Record details

Record details
Record identifierar-deq-overflow-incidents:87512cd9-d283-4af6-814e-419cb5a653c7
Source identifierar-deq-overflow-incidents
Source record number87512cd9-d283-4af6-814e-419cb5a653c7
Earlier versionNot provided
TypeTreatment plant bypass
Status in the reportNot stated by the source
Sewer operator identifierar-city-of-palestine
Sewer operatorCity of Palestine
Federal wastewater discharge permit (NPDES)AR0039365
Outlet numberNot provided
Outlet namePumps went down at the WWTP, had to turn the water out into the old effluent line to avoid pond and curtain damage, pumps will be pulled on Monday September 28th, repairs will be requested to be as quick as possible, we were advised to sample the effluent
Water named in the reportNot provided
Linked watersNot provided
How this report was linked to the waternot linked to a mapped water
LatitudeNot provided
LongitudeNot provided
Location sourceNot provided
Location accuracyNot provided
StartedSep 18, 2026 (2026-09-18T00:00:00-05:00)
EndedNot provided
Detail provided by the sourceto the day only
Reported to the sourceSep 28, 2026 (2026-09-28T00:00:00-05:00)
PublishedNot provided
Source last updatedNot provided
Last retrieved by DirtyWaterWatchNov 25, 2026, 7:19 PM CST (2026-11-26T01:19:36Z)
MaterialNot provided
Volume15,000 gallons (56,800 litres)
Volume as reported15000
How volume was determinedestimated
AuthorityArkansas Division of Environmental Quality (Reported Noncompliance Incident Data)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://adeq.state.ar.us/water/enforcement/sso/data.aspx

Original source data

{
  "row": {
    "permit_no": "AR0039365",
    "facility_name": "PALESTINE, CITY OF",
    "location": "Pumps went down at the WWTP, had to turn the water out into the old effluent line to avoid pond and curtain damage, pumps will be pulled on Monday September 28th, repairs will be requested to be as quick as possible, we were advised to sample the effluent",
    "date_started": "09/18/2026",
    "date_stopped": "",
    "date_reported": "09/28/2026",
    "volume_gal": "15000",
    "impact": "SSO Occurred at Treatment Plant",
    "incident_type": "Bypass;",
    "environmental_damage": "No Evidence of Adverse Health/Environmental Impact;",
    "confirmation_no": "87512cd9-d283-4af6-814e-419cb5a653c7",
    "cause": "Equipment Failure;",
    "action_taken": "Disinfected and Deodorized;",
    "overflow_type": "",
    "location_withheld": ""
  },
  "state": "AR",
  "time_zone": "America/Chicago",
  "timezone_note": "Central time (Arkansas is wholly in the Central zone, 49 CFR part 71, the Central zone); dates only",
  "county": "St. Francis County",
  "county_basis": "the county of the permit's treatment plant (EPA ICIS-NPDES point); DEQ's report gives no county"
}

Staff names, email addresses and phone numbers are removed from source data before it is stored.