Connecticut / Reports /
Sanitary sewer overflow (SSO) reported — TORRINGTON WPCF, Jul 8, 2026
Ended (as reported) · TORRINGTON WPCF (CT DEEP Performance Dashboard)
Source: TORRINGTON WPCF (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10940, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice
Current status from this report
This report does not set a map status as of Nov 2, 2026, 11:21 AM EST. Check its dates and the status rules.
A report is not a test of the water. See how we assign statuses.
Read the original notice · Report an error
1. Reported wastewater outlet
Operator named in the record: TORRINGTON WPCF. Outlet: “Sewer Main, 814 New Litchfield St, Torrington, CT”. Location: not given in the report or in the outlet records.
Outfall: a pipe or outlet where wastewater enters a water body.
2. Waters named in the notice
The notice names: “Gulf Stream”. Not linked to a mapped water.
3. Estimated downstream stretch
We estimate routes only on rivers before they become tidal. We do not estimate routes through tidal water or lakes.
When it happened and when it was reported
Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).
- Started
- Ended
- Detail provided by the source
- Times known to the minute
- Reported to the source
- not given
- Published
- not given
- Source last updated
- not given
- Last retrieved by DirtyWaterWatch
What and how much
- Type
- Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater.
- Status in the record
- Ended (as reported)
- Material
- “Raw Sewage”
- Volume
- 30 gallons (not stated whether estimated or measured)
- Volume as reported
- “unknown 30 gal”
Advice from TORRINGTON WPCF (CT DEEP Performance Dashboard)
This report includes no advice. Check current local health notices.
- Advice period
- This report does not state a period. See the rule DirtyWaterWatch applies and its source.
- Basis
- not stated
Source and versions
- Source
- CT DEEP CSO/SSO Performance Dashboard (QScend)
- Source record number
- 10940
- Original notice
- Read the original notice
- Earlier version
- None: this is the first record
- Later versions
- None
Record details
| Record identifier | ct-deep:10940 |
|---|---|
| Source identifier | ct-deep |
| Source record number | 10940 |
| Earlier version | Not provided |
| Type | Sanitary sewer overflow (SSO) |
| Status in the report | Ended (as reported) |
| Sewer operator identifier | ct-torrington |
| Sewer operator | TORRINGTON WPCF |
| Federal wastewater discharge permit (NPDES) | Not provided |
| Outlet number | Not provided |
| Outlet name | Sewer Main, 814 New Litchfield St, Torrington, CT |
| Water named in the report | Gulf Stream |
| Linked waters | Not provided |
| How this report was linked to the water | not linked to a mapped water |
| Latitude | Not provided |
| Longitude | Not provided |
| Location source | Not provided |
| Location accuracy, in metres | Not provided |
| Started | Jul 8, 2026, 12:00 AM EDT (2026-07-08T00:00:00-04:00) |
| Ended | Jul 8, 2026, 5:30 AM EDT (2026-07-08T05:30:00-04:00) |
| Detail provided by the source | to the minute |
| Reported to the source | Not provided |
| Published | Not provided |
| Source last updated | Not provided |
| Last retrieved by DirtyWaterWatch | Nov 2, 2026, 6:20 AM EST (2026-11-02T11:20:59Z) |
| Material | Raw Sewage |
| Volume, in gallons | 30 |
| Volume as reported | unknown 30 gal |
| How volume was determined | not stated whether estimated or measured |
| Authority | TORRINGTON WPCF (CT DEEP Performance Dashboard) |
| Advice | Not provided |
| Advice period, in hours | Not provided |
| Basis of the advice period | Not provided |
| Original notice | https://deepct.qscend.mygovcenter.com/cms/cms?id=1 |
Original source data
{
"Reporting Utility": "TORRINGTON WPCF",
"Status": "Closed",
"Incident Type": "Sewage Bypass",
"Weather Conditions": "Dry",
"Date Bypass Began or was Discovered": "07/08/2026",
"Event Start Time": "00:00 AM",
"Location of Bypass": "Sewer Main",
"Type of Bypass": "Raw Sewage",
"Cause of Bypass": "Sewage Line Break, Crack or Failure",
"Cause of Bypass Other Explanation": "Discovered sewage following an 8-inch sanitary sewer through the bridge abutment.",
"How was Incident Discovered": "Water company employee",
"Estimated Quantity or Rate of Discharge": "10 gph",
"How was estimated Quantity or Rate Determined": "estimated",
"Reach Waterbody": "Yes",
"Request ID": "10940",
"Waterbody Name": "Gulf Stream",
"Date Bypass Ended": "07/08/2026",
"Event End Time": "05:30 AM",
"Final Quantity": "unknown 30 gal",
"How was Final Volume Determined": null,
"How incident was resolved": "repair was completed by contractor",
"Municipality": "Torrington",
"Address": "814 New Litchfield St, Torrington, CT",
"_view": "SSO DATA VIEW",
"_dww_note": [
"receiving water 'Gulf Stream' has no matching water record"
]
} Source: TORRINGTON WPCF (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10940, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice
Staff names, email addresses and phone numbers are removed from source data before it is stored.