DirtyWaterWatch Public waters. Public record.

Connecticut / Reports /

Treatment plant bypass reported, Aug 24, 2026

Ended (as reported) · New Haven (CT DEEP Performance Dashboard)

Source: New Haven (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11310, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 2, 2026, 11:21 AM EST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: not named. Outlet: “Treatment Plant, 345 E Shore Pkwy, New Haven, CT”. Location: not given in the report or in the outlet records.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names: “NEW HAVEN HARBOR”. DirtyWaterWatch links this report to New Haven Harbor, CT. Match basis: the water named in the report.

3. Estimated downstream stretch

We estimate routes only on rivers before they become tidal. We do not estimate routes through tidal water or lakes.

Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Open on the main map

When it happened and when it was reported

Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).

Started
Ended
Detail provided by the source
Times known to the minute
Reported to the source
not given
Published
not given
Source last updated
not given
Last retrieved by DirtyWaterWatch

What and how much

Type
Treatment bypass: wastewater skips one or more treatment steps.
Status in the record
Ended (as reported)
Material
“Disinfected Partially Treated Raw Sewage”
Volume
530,300 gallons (estimated)
Volume as reported
“0.5303 MG”

Advice from New Haven (CT DEEP Performance Dashboard)

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Status history from this report

Source: DirtyWaterWatch calculations using this report and the published status rules. Updated 2026-11-02 16:21 UTC.

Source and versions

Source
CT DEEP CSO/SSO Performance Dashboard (QScend)
Source record number
11310
Original notice
Read the original notice
Earlier version
None: this is the first record
Later versions
None

Record details

Record details
Record identifierct-deep:11310
Source identifierct-deep
Source record number11310
Earlier versionNot provided
TypeTreatment plant bypass
Status in the reportEnded (as reported)
Sewer operator identifierNot provided
Sewer operatorNot provided
Federal wastewater discharge permit (NPDES)Not provided
Outlet numberNot provided
Outlet nameTreatment Plant, 345 E Shore Pkwy, New Haven, CT
Water named in the reportNEW HAVEN HARBOR
Linked watersnew-haven-harbor-ct
How this report was linked to the waterthe water named in the report
LatitudeNot provided
LongitudeNot provided
Location sourceNot provided
Location accuracy, in metresNot provided
StartedAug 24, 2026, 8:15 PM EDT (2026-08-24T20:15:00-04:00)
EndedAug 24, 2026, 9:30 PM EDT (2026-08-24T21:30:00-04:00)
Detail provided by the sourceto the minute
Reported to the sourceNot provided
PublishedNot provided
Source last updatedNot provided
Last retrieved by DirtyWaterWatchNov 2, 2026, 6:20 AM EST (2026-11-02T11:20:59Z)
MaterialDisinfected Partially Treated Raw Sewage
Volume, in gallons530,300
Volume as reported0.5303 MG
How volume was determinedestimated
AuthorityNew Haven (CT DEEP Performance Dashboard)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://deepct.qscend.mygovcenter.com/cms/cms?id=1

Original source data

{
  "Reporting Utility": null,
  "Status": "Closed",
  "Incident Type": "Sewage Bypass",
  "Weather Conditions": "Rain 1-2\" per hour",
  "Date Bypass Began or was Discovered": "08/24/2026",
  "Event Start Time": "08:15 PM",
  "Location of Bypass": "Treatment Plant",
  "Type of Bypass": "Disinfected Partially Treated Raw Sewage",
  "Cause of Bypass": "Excessive Flows - Storm Event",
  "Cause of Bypass Other Explanation": ".",
  "How was Incident Discovered": "SCADA",
  "Estimated Quantity or Rate of Discharge": "ONGOING",
  "How was estimated Quantity or Rate Determined": "ONGOING",
  "Reach Waterbody": "Yes",
  "Request ID": "11310",
  "Waterbody Name": "NEW HAVEN HARBOR",
  "Date Bypass Ended": "08/24/2026",
  "Event End Time": "09:30 PM",
  "Final Quantity": "0.5303 MG",
  "How was Final Volume Determined": null,
  "How incident was resolved": "Rain event ended",
  "Municipality": "New Haven",
  "Address": "345 E Shore Pkwy, New Haven, CT",
  "_view": "SSO DATA VIEW",
  "_dww_note": [
    "receiving water 'NEW HAVEN HARBOR' has no matching water record"
  ]
}

Source: New Haven (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11310, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice

Staff names, email addresses and phone numbers are removed from source data before it is stored.