Sanitary sewer overflow (SSO) reported — FARMINGTON, Aug 25, 2026

Ended (as reported) · FARMINGTON (CT DEEP Performance Dashboard)

Source: FARMINGTON (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11317, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 2, 2026, 11:21 AM EST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: FARMINGTON. Outlet: “Pump Station, 7 Leibinger Wy, Farmington, CT”. Location: not given in the report or in the outlet records.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names no water. Not linked to a mapped water.

3. Estimated downstream stretch

We estimate routes only on rivers before they become tidal. We do not estimate routes through tidal water or lakes.

When it happened and when it was reported

Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).

Started
Ended
not reported
Detail provided by the source
Times known to the minute
Reported to the source
not given
Published
not given
Source last updated
not given
Last retrieved by DirtyWaterWatch

What and how much

Type
Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater.
Status in the record
Ended (as reported)
Material
“None - for Construction Bypass”
Volume
volume not reported (not stated whether estimated or measured)
Volume as reported
none

Advice from FARMINGTON (CT DEEP Performance Dashboard)

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Source and versions

Source
CT DEEP CSO/SSO Performance Dashboard (QScend)
Source record number
11317
Original notice
Read the original notice
Earlier version
None: this is the first record
Later versions
None

Record details

Record details
Record identifierct-deep:11317
Source identifierct-deep
Source record number11317
Earlier versionNot provided
TypeSanitary sewer overflow (SSO)
Status in the reportEnded (as reported)
Sewer operator identifierct-farmington
Sewer operatorFARMINGTON
Federal wastewater discharge permit (NPDES)Not provided
Outlet numberNot provided
Outlet namePump Station, 7 Leibinger Wy, Farmington, CT
Water named in the reportNot provided
Linked watersNot provided
How this report was linked to the waternot linked to a mapped water
LatitudeNot provided
LongitudeNot provided
Location sourceNot provided
Location accuracy, in metresNot provided
StartedAug 25, 2026, 9:00 AM EDT (2026-08-25T09:00:00-04:00)
EndedNot provided
Detail provided by the sourceto the minute
Reported to the sourceNot provided
PublishedNot provided
Source last updatedNot provided
Last retrieved by DirtyWaterWatchNov 2, 2026, 6:20 AM EST (2026-11-02T11:20:59Z)
MaterialNone - for Construction Bypass
Volume, in gallonsNot provided
Volume as reportedNot provided
How volume was determinednot stated whether estimated or measured
AuthorityFARMINGTON (CT DEEP Performance Dashboard)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://deepct.qscend.mygovcenter.com/cms/cms?id=1

Original source data

{
  "Reporting Utility": "FARMINGTON",
  "Status": "Closed",
  "Incident Type": "Sewage Bypass",
  "Weather Conditions": "Dry",
  "Date Bypass Began or was Discovered": "08/25/2026",
  "Event Start Time": "09:00 AM",
  "Location of Bypass": "Pump Station",
  "Type of Bypass": "None - for Construction Bypass",
  "Cause of Bypass": "Other",
  "Cause of Bypass Other Explanation": "Upgrading I & C controls at the Hyde Road Pump Station (7 Leibinger Way, Farmington CT).  Full bypass pumping set up and running, expecting 48 hours for work. Estimated completion Friday Aug 28th, 2026.",
  "How was Incident Discovered": "N/A",
  "Estimated Quantity or Rate of Discharge": "N/A",
  "How was estimated Quantity or Rate Determined": "N/A",
  "Reach Waterbody": "No",
  "Request ID": "11317",
  "Waterbody Name": "N/A",
  "Date Bypass Ended": null,
  "Event End Time": null,
  "Final Quantity": null,
  "How was Final Volume Determined": null,
  "How incident was resolved": null,
  "Municipality": "Farmington",
  "Address": "7 Leibinger Wy, Farmington, CT",
  "_view": "SSO DATA VIEW"
}

Source: FARMINGTON (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11317, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice

Staff names, email addresses and phone numbers are removed from source data before it is stored.