Connecticut / Reports /
Sanitary sewer overflow (SSO) reported — FARMINGTON, Aug 25, 2026
Ended (as reported) · FARMINGTON (CT DEEP Performance Dashboard)
Source: FARMINGTON (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11318, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice
Current status from this report
This report does not set a map status as of Nov 2, 2026, 11:21 AM EST. Check its dates and the status rules.
A report is not a test of the water. See how we assign statuses.
Read the original notice · Report an error
1. Reported wastewater outlet
Operator named in the record: FARMINGTON. Outlet: “Pump Station, 7 Leibinger Wy, Farmington, CT”. Location: not given in the report or in the outlet records.
Outfall: a pipe or outlet where wastewater enters a water body.
2. Waters named in the notice
The notice names no water. Not linked to a mapped water.
3. Estimated downstream stretch
We estimate routes only on rivers before they become tidal. We do not estimate routes through tidal water or lakes.
When it happened and when it was reported
Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).
- Started
- Ended
- not reported
- Detail provided by the source
- Times known to the minute
- Reported to the source
- not given
- Published
- not given
- Source last updated
- not given
- Last retrieved by DirtyWaterWatch
What and how much
- Type
- Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater.
- Status in the record
- Ended (as reported)
- Material
- “None - for Construction Bypass”
- Volume
- volume not reported (not stated whether estimated or measured)
- Volume as reported
- none
Advice from FARMINGTON (CT DEEP Performance Dashboard)
This report includes no advice. Check current local health notices.
- Advice period
- This report does not state a period. See the rule DirtyWaterWatch applies and its source.
- Basis
- not stated
Source and versions
- Source
- CT DEEP CSO/SSO Performance Dashboard (QScend)
- Source record number
- 11318
- Original notice
- Read the original notice
- Earlier version
- None: this is the first record
- Later versions
- None
Record details
| Record identifier | ct-deep:11318 |
|---|---|
| Source identifier | ct-deep |
| Source record number | 11318 |
| Earlier version | Not provided |
| Type | Sanitary sewer overflow (SSO) |
| Status in the report | Ended (as reported) |
| Sewer operator identifier | ct-farmington |
| Sewer operator | FARMINGTON |
| Federal wastewater discharge permit (NPDES) | Not provided |
| Outlet number | Not provided |
| Outlet name | Pump Station, 7 Leibinger Wy, Farmington, CT |
| Water named in the report | Not provided |
| Linked waters | Not provided |
| How this report was linked to the water | not linked to a mapped water |
| Latitude | Not provided |
| Longitude | Not provided |
| Location source | Not provided |
| Location accuracy, in metres | Not provided |
| Started | Aug 25, 2026, 9:00 AM EDT (2026-08-25T09:00:00-04:00) |
| Ended | Not provided |
| Detail provided by the source | to the minute |
| Reported to the source | Not provided |
| Published | Not provided |
| Source last updated | Not provided |
| Last retrieved by DirtyWaterWatch | Nov 2, 2026, 6:20 AM EST (2026-11-02T11:20:59Z) |
| Material | None - for Construction Bypass |
| Volume, in gallons | Not provided |
| Volume as reported | Not provided |
| How volume was determined | not stated whether estimated or measured |
| Authority | FARMINGTON (CT DEEP Performance Dashboard) |
| Advice | Not provided |
| Advice period, in hours | Not provided |
| Basis of the advice period | Not provided |
| Original notice | https://deepct.qscend.mygovcenter.com/cms/cms?id=1 |
Original source data
{
"Reporting Utility": "FARMINGTON",
"Status": "Closed",
"Incident Type": "Sewage Bypass",
"Weather Conditions": "Dry",
"Date Bypass Began or was Discovered": "08/25/2026",
"Event Start Time": "09:00 AM",
"Location of Bypass": "Pump Station",
"Type of Bypass": "None - for Construction Bypass",
"Cause of Bypass": "Other",
"Cause of Bypass Other Explanation": "Upgrading I & C controls at the Hyde Road Pump Station (7 Leibinger Way, Farmington CT). Full bypass pumping set up and running, expecting 48 hours for work. Estimated completion Friday Aug 28th, 2026.",
"How was Incident Discovered": "N/A",
"Estimated Quantity or Rate of Discharge": "N/A",
"How was estimated Quantity or Rate Determined": "N/A",
"Reach Waterbody": "No",
"Request ID": "11318",
"Waterbody Name": "N/A",
"Date Bypass Ended": null,
"Event End Time": null,
"Final Quantity": null,
"How was Final Volume Determined": null,
"How incident was resolved": null,
"Municipality": "Farmington",
"Address": "7 Leibinger Wy, Farmington, CT",
"_view": "SSO DATA VIEW"
} Source: FARMINGTON (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11318, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice
Staff names, email addresses and phone numbers are removed from source data before it is stored.