DirtyWaterWatch Public waters. Public record.

Arizona / Reports /

Treatment bypass reported, Mar 10, 2026

Ongoing (as reported) · EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)

Source: EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators) via ECHO NPDES Sewer Overflow and Bypass Event Dataset, record NN0020281:13:1, reported Feb 27, 2026, retrieved 2026-11-26 01:22 UTC · Read the original notice

Current status from this report

Discharge or advisory reported on Laguna Creek: Discharge reported ongoing. Current rule period ends Jan 1, 2027, 4:59 AM MST. This is not a water-quality test.

Why this status: Discharge or advisory reported: the discharge is reported as ongoing.

Why we use this rule: A report marked ongoing stays red until an end is found or 7 days pass. After 7 days we label the end unconfirmed rather than assume the discharge continues.

This rule on the methods page, with its source

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: Navajo Tribal Utility Authority (Chinle, Kayenta, Tuba City, Window Rock, Ganado and Twin Arrows plants) (federal wastewater discharge permit, NPDES, NN0020281). Outlet: not stated. Location: 36.73311, -110.23061; location source: given in the source record.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names: “Laguna Creek”. DirtyWaterWatch links this report to Laguna Creek, AZ. Match basis: the water named in the report.

3. Estimated stretch

No downstream estimate is available for this report.

Map sources

Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Open on the main map

What the source reports

Event and notice times use Mountain Time (MST or MDT). Retrieval times use Coordinated Universal Time (UTC).

When

Started
Ended
Duration, as the source gives it
“7119.98 hours”
Detail of the times
Times known to the minute

What

Type
Treatment bypass: wastewater skips one or more treatment steps.
Kind of record
“Anticipated Bypass Notice”
Status in the record
Ongoing (as reported)
Material
“wastewater diverted around part of the treatment process”
Cause
“Equipment Upgrades at Treatment Plant”

How much

Volume
“92,572,783 gallons (Other)” (350.43 million litres, our conversion)
How the volume was found
“Other”

Advice in the source

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Who reported it

Operator named
Navajo Tribal Utility Authority (Chinle, Kayenta, Tuba City, Window Rock, Ganado and Twin Arrows plants)
Authority
EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)
Published by
ECHO NPDES Sewer Overflow and Bypass Event Dataset

When it was reported and read

Reported to the source
Published
Source last updated

DirtyWaterWatch observations

Last retrieved by DirtyWaterWatch

Status history from this report

Source: DirtyWaterWatch calculations using this report and the published status rules. Updated 2026-11-26 01:59 UTC.

Source

Source
ECHO NPDES Sewer Overflow and Bypass Event Dataset
Source record number
NN0020281:13:1
Original notice
Read the original notice

Record details

Record details
Record identifierecho-sewer-overflow:NN0020281:13:1
Source identifierecho-sewer-overflow
Source record numberNN0020281:13:1
Earlier versionNot provided
TypeTreatment bypass
Status in the reportOngoing (as reported)
Sewer operator identifierNot provided
Sewer operatorNot provided
Federal wastewater discharge permit (NPDES)NN0020281
Outlet numberNot provided
Outlet nameNot provided
Water named in the reportLaguna Creek
Linked waterslaguna-creek-az
How this report was linked to the waterthe water named in the report
Latitude36.733
Longitude-110.231
Location sourcegiven in the source record
Location accuracyNot provided
StartedMar 10, 2026, 1:00 PM MDT (2026-03-10T13:00:00-06:00)
EndedJan 1, 2027, 4:59 AM MST (2027-01-01T04:59:00-07:00)
Detail provided by the sourceto the minute
Reported to the sourceFeb 27, 2026, 12:00 AM MST (2026-02-27)
PublishedNov 25, 2026, 12:00 AM MST (2026-11-25)
Source last updatedNov 25, 2026, 5:17 AM MST (2026-11-25T12:17:14Z)
Last retrieved by DirtyWaterWatchNov 25, 2026, 6:22 PM MST (2026-11-26T01:22:11Z)
Materialwastewater diverted around part of the treatment process
Volume92.57 million gallons (350 million litres)
Volume as reported92,572,783 gallons (Other)
How volume was determinednot stated whether estimated or measured
AuthorityEPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://echo.epa.gov/detailed-facility-report?fid=NN0020281&sys=ICP

Original source data

{
  "sewer_overflow_bypass_event_key": "6444",
  "permit_identifier": "NN0020281",
  "program_report_form_set_id": "13",
  "program_report_form_id": "1",
  "sewer_overflow_bypass_event_id_ext": "1",
  "program_report_received_date": "2026-02-27",
  "program_report_start_date": "2026-03-10",
  "program_report_end_date": "2026-12-31",
  "electronic_submission_type_code": "ES1",
  "electr_submission_type_desc": "EPA electronic reporting system",
  "program_report_npdes_data_group_number_code": "G9C",
  "program_report_npdes_data_group_desc": "Anticipated Bypass Notice",
  "payload_id": "303247680",
  "transaction_type": "N",
  "sewer_overflow_bypass_description_text": "Aeromod Treatment Discharge",
  "sewer_overflow_bypass_reporting_requirement_code": "4",
  "sewer_overflow_reporting_requirement_desc": "Anticipated bypass notice",
  "latitude_measure": "36.733111",
  "longitude_measure": "-110.230611",
  "sewer_overflow_bypass_duration_hours": "7119.98",
  "sewer_overflow_bypass_start_datetime": "2026-03-10 13:00:00",
  "sewer_overflow_bypass_end_datetime": "2027-01-01 04:59:00",
  "discharge_quantification_method_code": "OTH",
  "discharge_quantification_method_desc": "Other",
  "sewer_overflow_bypass_discharge_volume_gallons": "92572783.30",
  "anticipated_bypass_text": "The Kayenta WWTP has completed the Aeromod System and has met all permit required sampling limits. The facility will be discharging from the Aeromod system after uv treament, which is bypassing the existing lagoon treatment cells. ",
  "anticipated_bypass_expect_limit_violation": "N",
  "event_transaction_type": "N",
  "types": [
    "Bypass Event"
  ],
  "receiving_waters": [
    "Laguna Creek"
  ],
  "impacts": [
    {
      "code": "NOI",
      "desc": "No observable impacts",
      "other": null
    }
  ],
  "causes": [
    {
      "code": "EQU",
      "desc": "Equipment Upgrades at Treatment Plant",
      "other": null
    }
  ],
  "corrective_actions": [
    {
      "code": "OTH",
      "desc": "Other",
      "other": "Utilize new treatment facility"
    }
  ],
  "treatment": [
    {
      "code": null,
      "desc": null,
      "bypassed_equipment": "Primary treatment equipment"
    }
  ],
  "collection_system_name": null,
  "percent_collection_system_css": null,
  "reached_water_rule": "receiving water named",
  "timezone_note": "ECHO gives event times without a timezone; read as America/Denver, the Navajo Nation's clock (it keeps daylight saving time, unlike the rest of Arizona; tz database link Navajo -> America/Denver)",
  "report_version": "1",
  "state": "AZ",
  "state_basis": "a Navajo Nation permit (NN...), which spans Arizona, New Mexico and Utah: the state is the one the event's own point lies in, west of the Arizona-New Mexico line (109.045 W) and south of the Arizona-Utah line (37 N) being Arizona (the Four Corners boundaries)",
  "end_is_planned": true,
  "planned_end_note": "the operator's planned end of an anticipated bypass (reporting requirement 'Anticipated bypass notice', or the anticipated-bypass text filled); the bypass runs to it unless a later report changes it"
}

Staff names, email addresses and phone numbers are removed from source data before it is stored.