South Dakota / Reports /
Treatment bypass reported — City of Aberdeen, Mar 23, 2026
Ongoing (as reported) · EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)
Source: EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators) via ECHO NPDES Sewer Overflow and Bypass Event Dataset, record SD0020702:10:1, reported Mar 2, 2026, retrieved 2026-11-26 01:22 UTC · Read the original notice
Current status from this report
Discharge or advisory reported on Moccasin Creek: Discharge reported ongoing. Current rule period ends Jun 1, 2028, 1:00 PM CDT. This is not a water-quality test.
Why this status: Discharge or advisory reported: the discharge is reported as ongoing.
Why we use this rule: A report marked ongoing stays red until an end is found or 7 days pass. After 7 days we label the end unconfirmed rather than assume the discharge continues.
A report is not a test of the water. See how we assign statuses.
Read the original notice · Report an error
1. Reported wastewater outlet
Operator named in the record: City of Aberdeen (federal wastewater discharge permit, NPDES, SD0020702). Outlet: not stated. Location: 45.42858, -98.47850; location source: given in the source record.
Outfall: a pipe or outlet where wastewater enters a water body.
2. Waters named in the notice
The notice names: “Moccasin Creek”. DirtyWaterWatch links this report to Moccasin Creek, SD. Match basis: the water named in the report.
3. Estimated stretch
No downstream estimate is available for this report.
Zoom in to see waters with no current status.
Map sources
Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
What the source reports
Event and notice times use Central Time (CST or CDT). Retrieval times use Coordinated Universal Time (UTC).
When
- Started
- Ended
- Duration, as the source gives it
- “19224.00 hours”
- Detail of the times
- Times known to the minute
What
- Type
- Treatment bypass: wastewater skips one or more treatment steps.
- Kind of record
- “Anticipated Bypass Notice”
- Status in the record
- Ongoing (as reported)
- Material
- “wastewater diverted around part of the treatment process”
- Cause
- “Equipment Upgrades at Treatment Plant”
How much
- Volume
- “2,803,820,400 gallons (Automated Remote Monitoring)”, measured or verified (10,613.61 million litres, our conversion)
- How the volume was found
- “Automated Remote Monitoring”
Advice in the source
This report includes no advice. Check current local health notices.
- Advice period
- This report does not state a period. See the rule DirtyWaterWatch applies and its source.
- Basis
- not stated
Who reported it
- Operator named
- City of Aberdeen
- Authority
- EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)
- Published by
- ECHO NPDES Sewer Overflow and Bypass Event Dataset
When it was reported and read
- Reported to the source
- Published
- Source last updated
DirtyWaterWatch observations
- Last retrieved by DirtyWaterWatch
Status history from this report
- Discharge or advisory reported Moccasin Creek: Discharge reported ongoing, Mar 23, 2026, 1:00 PM CDT to Jun 1, 2028, 1:00 PM CDT (the end is scheduled: a new report can change it)
- Caution Moccasin Creek: Within the caution period after the reported end, Jun 1, 2028, 1:00 PM CDT to Jun 4, 2028, 1:00 PM CDT (scheduled: a new report can change it)
Source: DirtyWaterWatch calculations using this report and the published status rules. Updated 2026-11-26 01:59 UTC.
Source
- Source
- ECHO NPDES Sewer Overflow and Bypass Event Dataset
- Source record number
- SD0020702:10:1
- Original notice
- Read the original notice
Record details
| Record identifier | echo-sewer-overflow:SD0020702:10:1 |
|---|---|
| Source identifier | echo-sewer-overflow |
| Source record number | SD0020702:10:1 |
| Earlier version | Not provided |
| Type | Treatment bypass |
| Status in the report | Ongoing (as reported) |
| Sewer operator identifier | sd-aberdeen |
| Sewer operator | City of Aberdeen |
| Federal wastewater discharge permit (NPDES) | SD0020702 |
| Outlet number | Not provided |
| Outlet name | Not provided |
| Water named in the report | Moccasin Creek |
| Linked waters | moccasin-creek-sd |
| How this report was linked to the water | the water named in the report |
| Latitude | 45.429 |
| Longitude | -98.479 |
| Location source | given in the source record |
| Location accuracy | Not provided |
| Started | Mar 23, 2026, 1:00 PM CDT (2026-03-23T13:00:00-05:00) |
| Ended | Jun 1, 2028, 1:00 PM CDT (2028-06-01T13:00:00-05:00) |
| Detail provided by the source | to the minute |
| Reported to the source | Mar 2, 2026, 12:00 AM CST (2026-03-02) |
| Published | Nov 25, 2026, 12:00 AM CST (2026-11-25) |
| Source last updated | Nov 25, 2026, 6:17 AM CST (2026-11-25T12:17:14Z) |
| Last retrieved by DirtyWaterWatch | Nov 25, 2026, 7:22 PM CST (2026-11-26T01:22:11Z) |
| Material | wastewater diverted around part of the treatment process |
| Volume | 2,803.82 million gallons (10,600 million litres) |
| Volume as reported | 2,803,820,400 gallons (Automated Remote Monitoring) |
| How volume was determined | measured or verified |
| Authority | EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators) |
| Advice | Not provided |
| Advice period, in hours | Not provided |
| Basis of the advice period | Not provided |
| Original notice | https://echo.epa.gov/detailed-facility-report?fid=SD0020702&sys=ICP |
Original source data
{
"sewer_overflow_bypass_event_key": "6447",
"permit_identifier": "SD0020702",
"program_report_form_set_id": "10",
"program_report_form_id": "1",
"sewer_overflow_bypass_event_id_ext": "1",
"program_report_received_date": "2026-03-02",
"program_report_start_date": "2026-03-23",
"program_report_end_date": "2028-06-01",
"electronic_submission_type_code": "ES1",
"electr_submission_type_desc": "EPA electronic reporting system",
"program_report_npdes_data_group_number_code": "G9C",
"program_report_npdes_data_group_desc": "Anticipated Bypass Notice",
"payload_id": "303383871",
"transaction_type": "N",
"sewer_overflow_bypass_description_text": "Water Reclamation Facility upgrades project ",
"sewer_overflow_bypass_reporting_requirement_code": "4",
"sewer_overflow_reporting_requirement_desc": "Anticipated bypass notice",
"latitude_measure": "45.428583",
"longitude_measure": "-98.478504",
"sewer_overflow_bypass_duration_hours": "19224.00",
"sewer_overflow_bypass_start_datetime": "2026-03-23 13:00:00",
"sewer_overflow_bypass_end_datetime": "2028-06-01 13:00:00",
"discharge_quantification_method_code": "ARM",
"discharge_quantification_method_desc": "Automated Remote Monitoring",
"sewer_overflow_bypass_discharge_volume_gallons": "2803820400.00",
"anticipated_bypass_text": "The WRF is under construction to expand hydraulic capacity. Headworks, primary and secondary treatment equipment will be bypassed at different times throughout the ongoing construction project. ",
"anticipated_bypass_expect_limit_violation": "N",
"event_transaction_type": "N",
"types": [
"Bypass Event"
],
"receiving_waters": [
"Moccasin Creek"
],
"impacts": [
{
"code": "NOI",
"desc": "No observable impacts",
"other": null
}
],
"causes": [
{
"code": "EQU",
"desc": "Equipment Upgrades at Treatment Plant",
"other": null
}
],
"corrective_actions": [
{
"code": "UWC",
"desc": "Upgrade WWTP Capacity",
"other": null
}
],
"treatment": [
{
"code": null,
"desc": null,
"bypassed_equipment": "Primary treatment equipment"
}
],
"collection_system_name": null,
"percent_collection_system_css": null,
"reached_water_rule": "receiving water named",
"timezone_note": "ECHO gives event times without a timezone; read as America/Chicago, the event's point lies outside the fifteen Mountain-time counties and Stanley County (49 CFR 71.7(b)) (a fall-back hour that happens twice is read as the first)",
"report_version": "1",
"end_is_planned": true,
"planned_end_note": "the operator's planned end of an anticipated bypass (reporting requirement 'Anticipated bypass notice', or the anticipated-bypass text filled); the bypass runs to it unless a later report changes it"
} Staff names, email addresses and phone numbers are removed from source data before it is stored.