Massachusetts / Reports /
Combined sewer overflow (CSO) reported — BOSTON WATER & SEWER COMMISSION, Jul 21, 2026
Ended (as reported) · BOSTON WATER & SEWER COMMISSION (MassDEP sewage notification portal)
Source: BOSTON WATER & SEWER COMMISSION (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 7015858b-aa1e-4345-ad59-4aece8e5ce80, published Jul 22, 2026, 10:57 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice
Current status from this report
This report does not set a map status as of Nov 2, 2026, 10:57 AM EST. Check its dates and the status rules.
A report is not a test of the water. See how we assign statuses.
Read the original notice · Report an error
1. Reported wastewater outlet
Operator named in the record: BOSTON WATER & SEWER COMMISSION (federal wastewater discharge permit, NPDES, MA0101192). Outlet: BOS070 “CORNER OF W 4TH ST AND FRONTAGE RD”. Location: 42.34287, -71.06100; location source: from the state's or EPA's outfall layer.
Outfall: a pipe or outlet where wastewater enters a water body.
2. Waters named in the notice
The notice names: “FORT POINT CHANNEL”. DirtyWaterWatch links this report to Fort Point Channel, MA. Match basis: the water named in the report.
3. Estimated downstream stretch
We estimate routes only on rivers before they become tidal. We do not estimate routes through tidal water or lakes.
Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
When it happened and when it was reported
Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).
- Started
- Ended
- not reported
- Detail provided by the source
- Times known to the minute
- Reported to the source
- not given
- Published
- Source last updated
- not given
- Last retrieved by DirtyWaterWatch
What and how much
- Type
- Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system.
- Status in the record
- Ended (as reported)
- Material
- “CSO – Treated”
- Volume
- volume not reported (not stated whether estimated or measured)
- Volume as reported
- none
Advice from BOSTON WATER & SEWER COMMISSION (MassDEP sewage notification portal)
“Avoid contact with these water bodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. See website for more information on whether specific resource areas, such as bathing beaches, are affected.”
- Advice period
- 48 hours
- Basis
- 314 CMR 16.04(10)(g)
Status history from this report
- Caution Fort Point Channel: Discharge record with unclear status, Jul 22, 2026, 10:57 AM EDT to Aug 5, 2026, 10:57 AM EDT
- End not confirmed Fort Point Channel: End not confirmed, Aug 5, 2026, 10:57 AM EDT to Aug 21, 2026, 10:57 AM EDT
- No current status shown Fort Point Channel: End not confirmed, Aug 21, 2026, 10:57 AM EDT to Oct 20, 2026, 10:57 AM EDT
Source: DirtyWaterWatch calculations using this report and the published status rules. Updated 2026-11-02 15:57 UTC.
Source and versions
- Source
- MassDEP CSO API behind the portal
- Source record number
- 7015858b-aa1e-4345-ad59-4aece8e5ce80
- Original notice
- Read the original notice
- Earlier version
- None: this is the first record
- Later versions
- None
Record details
| Record identifier | ma-massdep:7015858b-aa1e-4345-ad59-4aece8e5ce80 |
|---|---|
| Source identifier | ma-massdep |
| Source record number | 7015858b-aa1e-4345-ad59-4aece8e5ce80 |
| Earlier version | Not provided |
| Type | Combined sewer overflow (CSO) |
| Status in the report | Ended (as reported) |
| Sewer operator identifier | ma-bwsc |
| Sewer operator | BOSTON WATER & SEWER COMMISSION |
| Federal wastewater discharge permit (NPDES) | MA0101192 |
| Outlet number | BOS070 |
| Outlet name | CORNER OF W 4TH ST AND FRONTAGE RD |
| Water named in the report | FORT POINT CHANNEL |
| Linked waters | fort-point-channel-ma |
| How this report was linked to the water | the water named in the report |
| Latitude | 42.343 |
| Longitude | -71.061 |
| Location source | from the state's or EPA's outfall layer |
| Location accuracy, in metres | Not provided |
| Started | Jul 21, 2026, 9:10 PM EDT (2026-07-21T21:10:00-04:00) |
| Ended | Not provided |
| Detail provided by the source | to the minute |
| Reported to the source | Not provided |
| Published | Jul 22, 2026, 10:57 AM EDT (2026-07-22T10:57:38-04:00) |
| Source last updated | Not provided |
| Last retrieved by DirtyWaterWatch | Nov 2, 2026, 5:58 AM EST (2026-11-02T10:58:11Z) |
| Material | CSO – Treated |
| Volume, in gallons | Not provided |
| Volume as reported | Not provided |
| How volume was determined | not stated whether estimated or measured |
| Authority | BOSTON WATER & SEWER COMMISSION (MassDEP sewage notification portal) |
| Advice | Avoid contact with these water bodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. See website for more information on whether specific resource areas, such as bathing beaches, are affected. |
| Advice period, in hours | 48 |
| Basis of the advice period | 314 CMR 16.04(10)(g) |
| Original notice | https://eeaonline.eea.state.ma.us/portal/dep/cso-data-portal/details/7015858b-aa1e-4345-ad59-4aece8e5ce80 |
Original source data
{
"incidentId": "7015858b-aa1e-4345-ad59-4aece8e5ce80",
"incidentNumber": "26016805",
"incidentDate": "2026-07-21T00:00:00",
"incidentTime": "21:10",
"amPm": null,
"reporterClass": "Public Notification Report",
"eventType": "CSO – Treated",
"permiteeClass": "CSO",
"permiteeName": "BOSTON WATER & SEWER COMMISSION",
"permiteeId": "MA0101192",
"outfallId": "BOS070",
"municipality": "BOSTON",
"reportingType": "Initial-Ceased",
"location": "CORNER OF W 4TH ST AND FRONTAGE RD",
"latitude": null,
"longitude": null,
"waterBody": "FORT POINT CHANNEL",
"waterBodyDescription": null,
"volumnOfEvent": "",
"rainfallData": "",
"hours": "",
"minutes": "",
"month": null,
"year": null,
"additionalInformation": "CSO event did not meet the BWSC preset 15-minute activation threshold that would push out an automated notification, so email notification was not received within two hours of the CSO event. Manual notification was pushed out once data confirmed there was a CSO event. There was a separate event earlier in the night at this same regulator, only untreated, as this event occurred via the CSO pump station at Union Park; therefor a treated event.",
"submittedDate": "2026-07-22T10:57:38.667",
"parentIncidentId": null,
"_report_class": "Public Notification Report",
"_tz_assumed": "America/New_York (portal gives local clock time without zone)",
"_ended_note": "reported ceased; the portal gives no cessation time",
"_coords": "MassDEP CSOs layer DEP_OUTFL_ BOS070 (locations are estimates)",
"_water": {
"no_slug": [
"FORT POINT CHANNEL (no slug)",
"FORT POINT CHANNEL (no slug)"
]
},
"_advice_source": "required wording of 314 CMR 16.04(10)(g); the permittee's own advisory is only in an attachment the portal will not serve"
} Source: BOSTON WATER & SEWER COMMISSION (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 7015858b-aa1e-4345-ad59-4aece8e5ce80, published Jul 22, 2026, 10:57 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice
Staff names, email addresses and phone numbers are removed from source data before it is stored.