DirtyWaterWatch Public waters. Public record.

New York / Reports /

Treatment bypass reported — Yonkers Joint WWTP, Jul 2, 2026

Ended (as reported) · Yonkers Joint WWTP (NY DEC Sewage Pollution Right to Know)

Source: Yonkers Joint WWTP (NY DEC Sewage Pollution Right to Know), record 2593715181001657, reported Jul 3, 2026, 6:12 PM EDT, retrieved 2026-11-02 20:40 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 2, 2026, 4:26 PM EST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Latest conditions, not at the time of this report:At the Hudson River at Green Island NY gauge, 2.1 kilometres from the nearest boat launch on Hudson River: flow 8,190 cubic feet per second (Nov 2, 2026, 3:15 PM EST). Conditions are measured at the gauge, not at this spot, and do not change the status.Conditions on Hudson River

Source: U.S. Geological Survey via Water Data for the Nation, gauge 01358000, reading Nov 2, 2026, 3:15 PM EST, retrieved 2026-11-02 21:22 UTC. Gauge chosen by DirtyWaterWatch. · Readings and history at USGS

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: Yonkers Joint WWTP (federal wastewater discharge permit, NPDES, NY0026689). Outlet: not stated. Location: 40.92200, -73.90740; location source: given in the source record.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names: “Hudson River”. DirtyWaterWatch links this report to Hudson River, NY. Match basis: the water named in the report.

3. Estimated downstream stretch

No downstream estimate is available for this report.

Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Open on the main map

When it happened and when it was reported

Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).

Started
Ended
Detail provided by the source
Times known to the minute
Reported to the source
Published
Source last updated
not given
Last retrieved by DirtyWaterWatch

What and how much

Type
Treatment bypass: wastewater skips one or more treatment steps.
Status in the record
Ended (as reported)
Material
“Partially Treated with Disinfection”
Volume
39 million gallons (estimated)
Volume as reported
“39,000,000 Gallons Estimated”

Advice from Yonkers Joint WWTP (NY DEC Sewage Pollution Right to Know)

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Source and versions

Source
NY DEC Sewage Pollution Right to Know
Source record number
2593715181001657
Original notice
Read the original notice
Earlier version
Read the earlier version
Later versions
None

Record details

Record details
Record identifierny-dec-sprtk:2593715181001657
Source identifierny-dec-sprtk
Source record number2593715181001657
Earlier versionny-dec-sprtk:2593715180983241
TypeTreatment bypass
Status in the reportEnded (as reported)
Sewer operator identifierny-westchester-yonkers
Sewer operatorYonkers Joint WWTP
Federal wastewater discharge permit (NPDES)NY0026689
Outlet numberNot provided
Outlet nameNot provided
Water named in the reportHudson River
Linked watershudson-river-ny
How this report was linked to the waterthe water named in the report
Latitude40.922
Longitude-73.907
Location sourcegiven in the source record
Location accuracy, in metresNot provided
StartedJul 2, 2026, 9:00 PM EDT (2026-07-02T21:00:00-04:00)
EndedJul 3, 2026, 2:00 PM EDT (2026-07-03T14:00:00-04:00)
Detail provided by the sourceto the minute
Reported to the sourceJul 3, 2026, 6:12 PM EDT (2026-07-03T18:12:06-04:00)
PublishedJul 3, 2026, 6:12 PM EDT (2026-07-03T18:12:06-04:00)
Source last updatedNot provided
Last retrieved by DirtyWaterWatchNov 2, 2026, 3:40 PM EST (2026-11-02T20:40:35Z)
MaterialPartially Treated with Disinfection
Volume, in gallons39,000,000
Volume as reported39,000,000 Gallons Estimated
How volume was determinedestimated
AuthorityYonkers Joint WWTP (NY DEC Sewage Pollution Right to Know)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://www.dec.ny.gov/fs/data/SPRTK_Data.xlsx

Original source data

{
  "row": {
    "notificationId": "2593715181001657",
    "sprtkAirDateTime": "07/03/2026 22:12:06",
    "notificationStatus": "Update",
    "facilityName": "Yonkers Joint WWTP",
    "facilityId": "NY0026689",
    "countyName": "Westchester",
    "streetNumber": "1",
    "streetName": "Fernbrook Street",
    "city": "Yonkers",
    "latitude": "-73.9074",
    "longitude": "40.922",
    "sprtkStartDischargeDatetime": "07/03/2026 01:00:00",
    "sprtkEndDischargeDatetime": "07/03/2026 18:00:00",
    "dischargeDuration": "17 Hours - Ended",
    "surfaceWater": "Yes",
    "receivingWaterBody": "Hudson River",
    "quantity": "39,000,000 Gallons Estimated",
    "treatedState": "Partially Treated with Disinfection",
    "stepsToContain": "Plant is on emergency disinfection while plant staff work to restore power/ generators. \n\nUpdate. Discharge ended at 2 pm. Plant was able to restore power using a hybrid solution using one utility feeder to feed equipment and two turbo blowers, and run 3 additional turbo blowers on portable generators. Plant primary, secondary and disinfection/ dechlorination processes are all currently in operation. Estimate the discharge volume of 39,000,000 of partially treated sewage with disinfection to Hudson River during event.",
    "geoaddress": "1 Fernbrook St, Yonkers, NY 10705, USA",
    "impactedArea": "-",
    "dischargeReason": "Power Outage,Weather Conditions - Yonkers plant lost power due to high heat and humidity  and are unable to transfer power over to generators",
    "systemComponent": "-",
    "region": "3",
    "sprtkDischargeWaterFlow": "Manmade",
    "sprtkExplanation": "Yonkers plant lost power due to high heat and humidity  and are unable to transfer power over to generators"
  },
  "_tab": "January 2026-August2026",
  "_row": 4131,
  "_time_basis": {
    "air": "UTC in the workbook (rows aired from late May 2025); converted to America/New_York",
    "start": "UTC in the workbook (rows aired from late May 2025); converted to America/New_York",
    "end": "UTC in the workbook (rows aired from late May 2025); converted to America/New_York"
  },
  "_coords": "latitude and longitude columns swapped; a street-address geocode chosen by the notifier",
  "_event_type_basis": "partially treated discharge (treated state)",
  "_water": {
    "via": "receiving water name within New York (checked against the geocode)"
  },
  "_chain": {
    "id": "key:NY0026689|1 fernbrook street yonkers|2026-07-03T01:00Z",
    "basis": "facility + address + start",
    "position": 2,
    "of": 2,
    "head": "ny-dec-sprtk:2593715180983241",
    "latest": "ny-dec-sprtk:2593715181001657",
    "notices": [
      {
        "id": "2593715180983241",
        "status": "New",
        "aired": "2026-07-03T01:08:52-04:00"
      },
      {
        "id": "2593715181001657",
        "status": "Update",
        "aired": "2026-07-03T18:12:06-04:00"
      }
    ]
  }
}

Source: Yonkers Joint WWTP (NY DEC Sewage Pollution Right to Know), record 2593715181001657, reported Jul 3, 2026, 6:12 PM EDT, retrieved 2026-11-02 20:40 UTC · Read the original notice

Staff names, email addresses and phone numbers are removed from source data before it is stored.