Massachusetts / Waters /
Alewife Brook
Stream in Massachusetts · near Arlington, Cambridge, Medford, Somerville
Current status
A discharge was reported, and we have not found an end time in the sources we track.
Why this status: End not confirmed: DirtyWaterWatch rule for missing end times.
Why we use this rule: From day 7 to day 30, the map marks the end as unconfirmed. After day 30, the record remains flagged on its report and water pages.
How long each status lasts, and why
This status since Oct 27, 2026, 10:10 AM EDT.
Source: CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b8897e69-76ab-43f4-85a6-37caf45a316f, published Oct 13, 2026, 10:10 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice
Updated Nov 2, 2026, 11:21 AM EST.
Get alerts from City of Cambridge DPW · Bookmark this water page and check it before each trip · Report a missing notice or error
Reports behind this status
- End not confirmed Combined sewer overflow (CSO) · CITY OF CAMBRIDGE · CAM401A MBTA 97 CAMBRIDGE PARK DR · Oct 11, 2026, 7:57 PM EDT to end time not reported · volume not reported · End not confirmed, current rule period ends Nov 12, 2026, 9:10 AM EST
Source: CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b8897e69-76ab-43f4-85a6-37caf45a316f, published Oct 13, 2026, 10:10 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice
Advice in the reports
CITY OF CAMBRIDGE (MassDEP sewage notification portal) · Oct 13, 2026 · Current status: sets this water's status now
“Avoid contact with these water bodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. See website for more information on whether specific resource areas, such as bathing beaches, are affected.”
Map
Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Estimated downstream stretches on Alewife Brook
No downstream stretch has a current status here as of Nov 2, 2026, 11:21 AM EST. Check the reports below.
The last 90 days
- End not confirmed: Oct 27, 2026, 11:00 AM EDT to the latest update · from report 1
- Caution: Oct 13, 2026, 10:00 AM EDT to Oct 27, 2026, 11:00 AM EDT · from report 1
Source: DirtyWaterWatch calculations using the reports linked above and the published status rules. Updated 2026-11-02 16:21 UTC.
Reported discharges over time
- Discharge events, last 12 months10Dec 2025 to Nov 2026
- Days with a discharge, last 12 months8Dec 2025 to Nov 2026
- Hours under advisory, last 12 months279Dec 2025 to Nov 2026
- 2026 season under advisory6.3%May to October; 279 h
Discharge events per month
119 events, Jan 2022 to Nov 2026. Counted from 118 verified or annual reports, 1 public notices.
- Combined sewer overflow
- Sanitary sewer overflow
- Bypass, blended or other
- No source
- Partly covered or sparse source
No source covers 2022-01 to 2022-05. MassDEP portal records begin 2022-06-30. Verified Data Reports arrive after the month ends, so the latest months count public notices.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| Jan 2022 | 0 | 0 | 0 | 0 | No source | |
| Feb 2022 | 0 | 0 | 0 | 0 | No source | |
| Mar 2022 | 0 | 0 | 0 | 0 | No source | |
| Apr 2022 | 0 | 0 | 0 | 0 | No source | |
| May 2022 | 0 | 0 | 0 | 0 | No source | |
| Jun 2022 | 0 | 0 | 0 | 0 | Partly covered or sparse source | |
| Jul 2022 | 0 | 0 | 0 | 0 | ||
| Aug 2022 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Sep 2022 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Oct 2022 | 3 | 0 | 0 | 3 | Verified or annual reports | |
| Nov 2022 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Dec 2022 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Jan 2023 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Feb 2023 | 0 | 0 | 0 | 0 | ||
| Mar 2023 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Apr 2023 | 0 | 0 | 0 | 0 | ||
| May 2023 | 6 | 0 | 0 | 6 | Verified or annual reports | |
| Jun 2023 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Jul 2023 | 13 | 0 | 0 | 13 | Verified or annual reports | |
| Aug 2023 | 10 | 0 | 0 | 10 | Verified or annual reports | |
| Sep 2023 | 6 | 0 | 0 | 6 | Verified or annual reports | |
| Oct 2023 | 0 | 0 | 0 | 0 | ||
| Nov 2023 | 0 | 0 | 0 | 0 | ||
| Dec 2023 | 6 | 0 | 0 | 6 | Verified or annual reports | |
| Jan 2024 | 7 | 1 | 0 | 8 | Verified or annual reports | |
| Feb 2024 | 0 | 0 | 0 | 0 | ||
| Mar 2024 | 3 | 0 | 0 | 3 | Verified or annual reports | |
| Apr 2024 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| May 2024 | 6 | 0 | 0 | 6 | Verified or annual reports | |
| Jun 2024 | 6 | 0 | 0 | 6 | Verified or annual reports | |
| Jul 2024 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Aug 2024 | 3 | 0 | 0 | 3 | Verified or annual reports | |
| Sep 2024 | 0 | 0 | 0 | 0 | ||
| Oct 2024 | 0 | 0 | 0 | 0 | ||
| Nov 2024 | 0 | 0 | 0 | 0 | ||
| Dec 2024 | 3 | 0 | 0 | 3 | Verified or annual reports | |
| Jan 2025 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Feb 2025 | 0 | 0 | 0 | 0 | ||
| Mar 2025 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Apr 2025 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| May 2025 | 2 | 0 | 0 | 2 | Verified or annual reports | |
| Jun 2025 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Jul 2025 | 4 | 0 | 0 | 4 | Verified or annual reports | |
| Aug 2025 | 3 | 0 | 0 | 3 | Verified or annual reports | |
| Sep 2025 | 4 | 0 | 0 | 4 | Verified or annual reports | |
| Oct 2025 | 5 | 0 | 0 | 5 | Verified or annual reports | |
| Nov 2025 | 0 | 0 | 0 | 0 | ||
| Dec 2025 | 0 | 0 | 0 | 0 | ||
| Jan 2026 | 0 | 0 | 0 | 0 | ||
| Feb 2026 | 0 | 0 | 0 | 0 | ||
| Mar 2026 | 0 | 0 | 0 | 0 | ||
| Apr 2026 | 0 | 0 | 0 | 0 | ||
| May 2026 | 0 | 0 | 0 | 0 | ||
| Jun 2026 | 1 | 0 | 0 | 1 | Verified or annual reports | |
| Jul 2026 | 8 | 0 | 0 | 8 | Verified or annual reports | |
| Aug 2026 | 0 | 0 | 0 | 0 | ||
| Sep 2026 | 0 | 0 | 0 | 0 | ||
| Oct 2026 | 1 | 0 | 0 | 1 | Public notices (no report yet) | |
| Nov 2026 | 0 | 0 | 0 | 0 |
Hours under advisory per month
Hours this water was under an advisory, by the map's red rules.
- Advisory in effect
- No source
- Partly covered or sparse source
No source covers 2022-01 to 2022-05. 1 discharge events have no reported end and no ongoing status; under the status rules they set caution, not an advisory, and add no hours here. MassDEP portal records begin 2022-06-30. Verified Data Reports arrive after the month ends, so the latest months count public notices.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Month | Hours under advisory | From discharge windows | Hours in month | Coverage |
|---|---|---|---|---|
| Jan 2022 | 0 | 0 | 744 | No source |
| Feb 2022 | 0 | 0 | 672 | No source |
| Mar 2022 | 0 | 0 | 744 | No source |
| Apr 2022 | 0 | 0 | 720 | No source |
| May 2022 | 0 | 0 | 744 | No source |
| Jun 2022 | 0 | 0 | 720 | Partly covered or sparse source |
| Jul 2022 | 0 | 0 | 744 | |
| Aug 2022 | 97 | 97 | 744 | |
| Sep 2022 | 48 | 48 | 720 | |
| Oct 2022 | 98 | 98 | 744 | |
| Nov 2022 | 53 | 53 | 720 | |
| Dec 2022 | 92 | 92 | 744 | |
| Jan 2023 | 50 | 50 | 744 | |
| Feb 2023 | 0 | 0 | 672 | |
| Mar 2023 | 100 | 100 | 744 | |
| Apr 2023 | 0 | 0 | 720 | |
| May 2023 | 99 | 99 | 744 | |
| Jun 2023 | 49 | 49 | 720 | |
| Jul 2023 | 296 | 296 | 744 | |
| Aug 2023 | 235 | 235 | 744 | |
| Sep 2023 | 158 | 158 | 720 | |
| Oct 2023 | 0 | 0 | 744 | |
| Nov 2023 | 0 | 0 | 720 | |
| Dec 2023 | 100 | 100 | 744 | |
| Jan 2024 | 110 | 110 | 744 | |
| Feb 2024 | 0 | 0 | 696 | |
| Mar 2024 | 145 | 145 | 744 | |
| Apr 2024 | 48 | 48 | 720 | |
| May 2024 | 136 | 136 | 744 | |
| Jun 2024 | 156 | 156 | 720 | |
| Jul 2024 | 12 | 12 | 744 | |
| Aug 2024 | 182 | 182 | 744 | |
| Sep 2024 | 0 | 0 | 720 | |
| Oct 2024 | 0 | 0 | 744 | |
| Nov 2024 | 0 | 0 | 720 | |
| Dec 2024 | 89 | 89 | 744 | |
| Jan 2025 | 51 | 51 | 744 | |
| Feb 2025 | 0 | 0 | 672 | |
| Mar 2025 | 97 | 97 | 744 | |
| Apr 2025 | 49 | 49 | 720 | |
| May 2025 | 100 | 100 | 744 | |
| Jun 2025 | 49 | 49 | 720 | |
| Jul 2025 | 148 | 148 | 744 | |
| Aug 2025 | 142 | 142 | 744 | |
| Sep 2025 | 121 | 121 | 720 | |
| Oct 2025 | 143 | 143 | 744 | |
| Nov 2025 | 0 | 0 | 720 | |
| Dec 2025 | 0 | 0 | 744 | |
| Jan 2026 | 0 | 0 | 744 | |
| Feb 2026 | 0 | 0 | 672 | |
| Mar 2026 | 0 | 0 | 744 | |
| Apr 2026 | 0 | 0 | 720 | |
| May 2026 | 0 | 0 | 744 | |
| Jun 2026 | 49 | 49 | 720 | |
| Jul 2026 | 229 | 229 | 744 | |
| Aug 2026 | 1 | 1 | 744 | |
| Sep 2026 | 0 | 0 | 720 | |
| Oct 2026 | 0 | 0 | 744 | |
| Nov 2026 | 0 | 0 | 36 |
Days with a discharge per month
A day counts when any counted discharge was under way on it (start to reported end, local time); an event with no end counts its start day.
- No source
- Partly covered or sparse source
No source covers 2022-01 to 2022-05.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Month | Days with a discharge | Coverage |
|---|---|---|
| Jan 2022 | 0 | No source |
| Feb 2022 | 0 | No source |
| Mar 2022 | 0 | No source |
| Apr 2022 | 0 | No source |
| May 2022 | 0 | No source |
| Jun 2022 | 0 | Partly covered or sparse source |
| Jul 2022 | 0 | |
| Aug 2022 | 2 | |
| Sep 2022 | 1 | |
| Oct 2022 | 2 | |
| Nov 2022 | 2 | |
| Dec 2022 | 1 | |
| Jan 2023 | 1 | |
| Feb 2023 | 0 | |
| Mar 2023 | 2 | |
| Apr 2023 | 0 | |
| May 2023 | 3 | |
| Jun 2023 | 1 | |
| Jul 2023 | 6 | |
| Aug 2023 | 5 | |
| Sep 2023 | 3 | |
| Oct 2023 | 0 | |
| Nov 2023 | 0 | |
| Dec 2023 | 2 | |
| Jan 2024 | 2 | |
| Feb 2024 | 0 | |
| Mar 2024 | 3 | |
| Apr 2024 | 1 | |
| May 2024 | 3 | |
| Jun 2024 | 3 | |
| Jul 2024 | 1 | |
| Aug 2024 | 3 | |
| Sep 2024 | 0 | |
| Oct 2024 | 0 | |
| Nov 2024 | 0 | |
| Dec 2024 | 2 | |
| Jan 2025 | 1 | |
| Feb 2025 | 0 | |
| Mar 2025 | 2 | |
| Apr 2025 | 1 | |
| May 2025 | 2 | |
| Jun 2025 | 1 | |
| Jul 2025 | 4 | |
| Aug 2025 | 2 | |
| Sep 2025 | 3 | |
| Oct 2025 | 3 | |
| Nov 2025 | 0 | |
| Dec 2025 | 0 | |
| Jan 2026 | 0 | |
| Feb 2026 | 0 | |
| Mar 2026 | 0 | |
| Apr 2026 | 0 | |
| May 2026 | 0 | |
| Jun 2026 | 1 | |
| Jul 2026 | 6 | |
| Aug 2026 | 0 | |
| Sep 2026 | 0 | |
| Oct 2026 | 1 | |
| Nov 2026 | 0 |
Reported volume per year
Gallons, summed from the 118 events that gave a number (1 did not).
- Partly covered or sparse source
1 of 119 events gave no volume as a number; only numbers are summed.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Year | Gallons | Events with a number | Events without | Coverage |
|---|---|---|---|---|
| 2022 | 482,000 | 9 | 0 | Partly covered or sparse source |
| 2023 | 27,811,000 | 45 | 0 | |
| 2024 | 20,372,100 | 32 | 0 | |
| 2025 | 10,656,000 | 23 | 0 | |
| 2026 | 17,393,000 | 9 | 1 |
Hours under advisory per year
Hours under advisory each year; 2026 to date.
- Advisory in effect
- Partly covered or sparse source
1 discharge events have no reported end and no ongoing status; under the status rules they set caution, not an advisory, and add no hours here.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Year | Hours under advisory | Share of the year | Coverage |
|---|---|---|---|
| 2022 | 388 | 4.4% | Partly covered or sparse source |
| 2023 | 1,087 | 12.4% | |
| 2024 | 879 | 10.0% | |
| 2025 | 898 | 10.3% | |
| 2026 | 279 | 3.8% |
Discharge events by calendar month, all years
Every counted discharge event, by the calendar month it began.
Months are summed over every year a source covers; the table gives the number of years behind each month.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Month | Events | Years of records |
|---|---|---|
| Jan | 10 | 4 |
| Feb | 0 | 4 |
| Mar | 7 | 4 |
| Apr | 2 | 4 |
| May | 14 | 4 |
| Jun | 9 | 5 |
| Jul | 27 | 5 |
| Aug | 18 | 5 |
| Sep | 11 | 5 |
| Oct | 9 | 5 |
| Nov | 2 | 5 |
| Dec | 10 | 4 |
Discharge events by outfall
The 5 outfalls with the most events of 5, all years.
MassDEP portal records begin 2022-06-30. Verified Data Reports arrive after the month ends, so the latest months count public notices.
Source: MassDEP sewage notification portal. Covered 2022-06-30 to 2026-11-02.
Show table
| Outfall | Discharger | Events |
|---|---|---|
| CAM401A MBTA 97 CAMBRIDGE PARK DR | CITY OF CAMBRIDGE | 74 |
| SOM001A 100 FT BEYOND END OF MATIGNON RD | CITY OF SOMERVILLE | 24 |
| CAM401B INT MASS AVE & ALEWIFE BK | CITY OF CAMBRIDGE | 13 |
| MWR003 165 FT WEST OF ALEWIFE STATION ACCESS RD | MASSACHUSETTS WATER RESOURCES AUTHORITY | 4 |
| CAM001 BETW FOCH ST AND MURRAY HILL RD | CITY OF CAMBRIDGE | 3 |
| Outfall not stated | 1 |
How these charts are counted
Discharge events are counted once: where a source publishes both public notices and verified reports (MassDEP, Vermont DEC), a discharger's month with any verified report counts its verified reports only, and other months count notices. Revisions are folded into the record they revise, and EPA copies of a state report are not counted twice. Monthly and yearly totals (Maine DEP, EPA discharge monitoring reports, Portsmouth) are shown on their own and never added to the event counts. Hours under advisory follow the map's red rules. A muted band marks periods no source covers: a gap there is missing data, not a quiet month.
- MassDEP sewage notification portal: 2022-06-30 to now
Reports linked to Alewife Brook
| Start | End | Sewer operator | Outlet | Type | Volume | Source | Links |
|---|---|---|---|---|---|---|---|
| Oct 11, 2026, 7:57 PM EDT | end time not reported | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b8897e69-76ab-43f4-85a6-37caf45a316f, published Oct 13, 2026, 10:10 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Oct 11, 2026, 7:57 PM EDT · Map |
| Jul 29, 2026, 11:45 PM EDT | Jul 30, 2026, 12:30 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 20,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record a8711c37-ecca-45ba-9d4c-3e9ee8dd1243, published Aug 14, 2026, 3:30 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 29, 2026, 11:45 PM EDT · Map |
| Jul 29, 2026, 11:45 PM EDT | Jul 30, 2026, 12:30 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b16b77f0-4533-4294-bd24-28883fe57ff8, published Jul 30, 2026, 9:21 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 29, 2026, 11:45 PM EDT · Map |
| Jul 29, 2026, 11:15 AM EDT | Jul 29, 2026, 11:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 270,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b08e712b-521a-40a4-bedc-6d24459b31ed, published Aug 14, 2026, 3:29 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 29, 2026, 11:15 AM EDT · Map |
| Jul 29, 2026, 11:00 AM EDT | Jul 29, 2026, 11:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record c026c4d8-0b71-4e0e-8c04-21ad7e8b08e6, published Jul 30, 2026, 9:17 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 29, 2026, 11:00 AM EDT · Map |
| Jul 22, 2026, 4:25 PM EDT | Jul 22, 2026, 4:35 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 106,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 0f673e83-57ac-45ad-b3e8-bd26684be44f, published Aug 13, 2026, 9:02 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF SOMERVILLE, Jul 22, 2026, 4:25 PM EDT · Map |
| Jul 22, 2026, 4:25 PM EDT | Jul 22, 2026, 4:35 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record e939f5ef-7910-4bd9-9b77-9f70ed3591fb, published Jul 24, 2026, 2:08 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF SOMERVILLE, Jul 22, 2026, 4:25 PM EDT · Map |
| Jul 22, 2026, 4:22 PM EDT | Jul 22, 2026, 5:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 00db6421-c38c-48fb-ac8b-8dfee3ebc599, published Jul 23, 2026, 9:34 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 22, 2026, 4:22 PM EDT · Map |
| Jul 22, 2026, 4:15 PM EDT | Jul 22, 2026, 5:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 1.83 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 6efecf5d-1a90-430e-a728-1eb753af2372, published Aug 14, 2026, 3:05 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 22, 2026, 4:15 PM EDT · Map |
| Jul 21, 2026, 5:45 PM EDT | Jul 21, 2026, 8:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 14.1 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 62dd6ccf-582d-4dfa-ba9e-0931cfc184aa, published Aug 14, 2026, 2:57 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 21, 2026, 5:45 PM EDT · Map |
| Jul 21, 2026, 5:45 PM EDT | Jul 21, 2026, 8:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 1a665188-535a-4307-b94c-1a0e04705cb8, published Jul 22, 2026, 11:14 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 21, 2026, 5:45 PM EDT · Map |
| Jul 7, 2026, 6:38 PM EDT | Jul 7, 2026, 7:08 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record fbefa9c3-326a-430b-b3af-24802058c806, published Jul 8, 2026, 8:18 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 7, 2026, 6:38 PM EDT · Map |
| Jul 7, 2026, 6:27 PM EDT | Jul 7, 2026, 7:08 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 170,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 6a6f2576-254e-4cef-af75-2e6bcde66dee, published Aug 14, 2026, 12:19 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 7, 2026, 6:27 PM EDT · Map |
| Jul 4, 2026, 7:13 PM EDT | Jul 4, 2026, 7:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 6c6833a1-926c-405f-8ddc-e0d4a04d12a4, published Jul 6, 2026, 10:05 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 4, 2026, 7:13 PM EDT · Map |
| Jul 4, 2026, 7:10 PM EDT | Jul 4, 2026, 7:15 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 17,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 2d46e54f-ef0c-4cba-9aba-45c24eef7b04, published Aug 13, 2026, 8:59 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF SOMERVILLE, Jul 4, 2026, 7:10 PM EDT · Map |
| Jul 4, 2026, 7:10 PM EDT | Jul 4, 2026, 7:15 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 39671202-33c8-4a50-be42-cd3b68682954, published Jul 4, 2026, 9:00 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF SOMERVILLE, Jul 4, 2026, 7:10 PM EDT · Map |
| Jul 4, 2026, 7:00 PM EDT | Jul 4, 2026, 7:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 590,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record cdc6d42a-0f49-4d6a-ad85-a25a0ed62e34, published Aug 14, 2026, 12:16 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jul 4, 2026, 7:00 PM EDT · Map |
| Jun 18, 2026, 7:08 PM EDT | Jun 18, 2026, 7:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d6e51c07-d11d-46ec-b5a5-74bd08321aeb, published Jun 19, 2026, 9:22 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jun 18, 2026, 7:08 PM EDT · Map |
| Jun 18, 2026, 6:45 PM EDT | Jun 18, 2026, 7:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 290,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d5711218-8542-4c3e-91ff-351ebbfd469a, published Jul 15, 2026, 2:10 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Read report: Combined sewer overflow (CSO), CITY OF CAMBRIDGE, Jun 18, 2026, 6:45 PM EDT · Map |
| Oct 22, 2025, 8:54 AM EDT | Oct 22, 2025, 8:54 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 0 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 44748008-f532-4fb5-93f6-61b7eb37253a, published Nov 18, 2025, 9:11 AM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 22, 2025, 8:54 AM EDT | Oct 22, 2025, 8:54 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record a599c8ff-e6a8-41cb-8439-cad90050da02, published Oct 22, 2025, 12:29 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 20, 2025, 11:20 AM EDT | Oct 20, 2025, 11:40 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 210,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4ceec3da-05c9-431a-ab72-546e4842c9f7, published Nov 14, 2025, 12:39 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 20, 2025, 11:15 AM EDT | Oct 20, 2025, 11:40 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 9d208b5b-f124-4997-b8eb-4e31c163d0ac, published Oct 20, 2025, 4:19 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 9:15 AM EDT | Oct 8, 2025, 10:00 AM EDT | CITY OF CAMBRIDGE | CAM401B INT MASS AVE & ALEWIFE BK | Combined sewer overflow (CSO) | 30,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record ced5d58b-993c-483f-b63d-e17168d27075, published Nov 14, 2025, 12:34 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 9:05 AM EDT | Oct 8, 2025, 10:00 AM EDT | CITY OF CAMBRIDGE | CAM401B INT MASS AVE & ALEWIFE BK | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 883490d8-9921-4b7c-8fe6-ce282aa26ad2, published Oct 8, 2025, 5:06 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 8:55 AM EDT | Oct 8, 2025, 9:35 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 729,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record a205351b-6299-4610-b856-0cb47a09717c, published Oct 14, 2025, 11:30 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 8:55 AM EDT | Oct 8, 2025, 9:35 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 7a32b536-dab0-48fd-a723-8a33a13fe73c, published Oct 8, 2025, 3:50 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 8:45 AM EDT | Oct 8, 2025, 9:30 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 2.14 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 959bbe4c-2c0d-412c-8cd7-acc0e661317a, published Nov 14, 2025, 12:32 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 8, 2025, 8:45 AM EDT | Oct 8, 2025, 9:30 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 2755cfdb-bef6-40eb-8a8f-e7bd9f6ec61b, published Oct 8, 2025, 5:06 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 18, 2025, 3:15 AM EDT | Sep 18, 2025, 3:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 6e54ab42-5395-46a0-b9b5-da4d1baa4289, published Oct 14, 2025, 3:59 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 18, 2025, 3:15 AM EDT | Sep 18, 2025, 3:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4ea9dbce-5afe-40e6-b129-aff6133a7513, published Sep 19, 2025, 9:28 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 7, 2025, 6:10 PM EDT | Sep 7, 2025, 6:25 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 388,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d897f827-f041-49b3-993a-aef2bcc3e357, published Oct 14, 2025, 8:24 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 6, 2025, 6:15 PM EDT | Sep 6, 2025, 6:30 PM EDT | CITY OF CAMBRIDGE | CAM401B INT MASS AVE & ALEWIFE BK | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record aa129dd4-e17e-4ec1-8e16-b0af70041544, published Oct 14, 2025, 3:50 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 6, 2025, 6:15 PM EDT | Sep 6, 2025, 6:30 PM EDT | CITY OF CAMBRIDGE | CAM401B INT MASS AVE & ALEWIFE BK | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 7f3ac47a-4b52-46a2-b3b0-56c09b574cda, published Sep 9, 2025, 11:20 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 6, 2025, 5:45 PM EDT | Sep 6, 2025, 7:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 1.96 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 80f8d2c1-9d71-4b1e-a8f6-5feb2df910ad, published Oct 14, 2025, 3:55 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 6, 2025, 5:30 PM EDT | Sep 6, 2025, 7:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 150a93b8-d312-46a3-a07f-9dd53c3c699a, published Sep 19, 2025, 9:51 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 29, 2025, 3:00 PM EDT | Aug 29, 2025, 3:10 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 39,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record ac8add68-079f-4c34-897c-2a3afa54e950, published Oct 14, 2025, 8:33 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 29, 2025, 3:00 PM EDT | Aug 29, 2025, 3:10 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 340,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record e9d1db74-af9b-4385-9e8f-a55137befb22, published Sep 15, 2025, 9:12 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 29, 2025, 3:00 PM EDT | Aug 29, 2025, 3:10 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b27773c4-2a72-4956-923b-75e773a8491d, published Aug 30, 2025, 8:12 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 29, 2025, 2:45 PM EDT | Aug 29, 2025, 3:10 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 456684cc-5f68-45dd-9f51-67393987202d, published Sep 2, 2025, 8:57 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 14, 2025, 6:40 PM EDT | Aug 14, 2025, 6:55 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 5189fc7b-ba12-418d-afd8-036b90aa8f73, published Aug 15, 2025, 8:55 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 14, 2025, 6:30 PM EDT | Aug 14, 2025, 6:55 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 1.27 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 2153cc1b-3c6c-4b78-a9a7-3feada9186ed, published Sep 15, 2025, 9:10 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 31, 2025, 9:00 PM EDT | Jul 31, 2025, 9:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 40,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d242cffc-7d24-4a5d-84dc-18b69a6ed4f1, published Aug 14, 2025, 9:54 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 25, 2025, 3:10 PM EDT | Jul 25, 2025, 3:10 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 218bdfea-220f-40b0-87e9-d126d0e59a22, published Jul 28, 2025, 10:34 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 25, 2025, 3:00 PM EDT | Jul 25, 2025, 3:10 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 50,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 5e818d5a-bf17-416e-83f2-5187fda5bbfc, published Aug 14, 2025, 9:49 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 20, 2025, 7:52 PM EDT | Jul 20, 2025, 8:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record a2df9dc1-725d-41d7-9373-81738e2968d8, published Jul 21, 2025, 11:06 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 20, 2025, 7:45 PM EDT | Jul 20, 2025, 8:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 80,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 1f1f1fea-80f0-4c85-96e9-4f89bfe588e7, published Aug 14, 2025, 9:47 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 8, 2025, 11:24 PM EDT | Jul 8, 2025, 11:20 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 5042a7e8-6e44-42aa-9d77-a5cb8614596d, published Jul 10, 2025, 10:31 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 8, 2025, 11:15 PM EDT | Jul 8, 2025, 11:20 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4a558b29-773f-43dc-8d0d-8c829424f841, published Aug 12, 2025, 8:56 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 7, 2025, 5:30 PM EDT | Jun 7, 2025, 6:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 330,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 25256bdd-db0c-4210-84e2-91f9c48314cd, published Jul 14, 2025, 9:54 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 7, 2025, 5:23 PM EDT | Jun 7, 2025, 6:00 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 08a0531f-0687-4007-85bb-2403656c0576, published Jun 9, 2025, 11:05 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 22, 2025, 7:00 PM EDT | May 22, 2025, 10:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 1.35 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 2db3bc17-1888-4719-b546-0edc75d65d75, published Jun 13, 2025, 11:45 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 22, 2025, 6:38 PM EDT | May 22, 2025, 10:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record bc481c6d-4038-447e-b1f3-c94fd0974091, published May 23, 2025, 2:06 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 6, 2025, 6:15 PM EDT | May 6, 2025, 6:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 160,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d6822169-0dfb-4bf1-9f5f-57ccbb027a79, published Jun 13, 2025, 11:42 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 6, 2025, 6:13 PM EDT | May 6, 2025, 6:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 045480de-b364-46b6-b2e2-6319fcb0509e, published May 7, 2025, 10:16 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 1, 2025, 12:45 AM EDT | Apr 1, 2025, 1:15 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 350,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 10135e3c-902b-467c-b49b-4bfac358e6e8, published May 12, 2025, 3:12 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 1, 2025, 12:38 AM EDT | Apr 1, 2025, 1:15 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d981f2ee-ed74-43df-b277-428164459823, published Apr 1, 2025, 12:28 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 17, 2025, 4:00 AM EDT | Mar 17, 2025, 4:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 1.02 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 29268782-a3b6-403a-a685-7b0463b9d5c6, published Apr 14, 2025, 3:10 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 17, 2025, 3:53 AM EDT | Mar 17, 2025, 4:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 5a95ef45-ee5d-4bde-bd57-005cb7c924e3, published Mar 17, 2025, 12:42 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2025, 4:14 AM EST | Mar 6, 2025, 4:44 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 100,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 96267222-6065-43e3-8568-db76f43ff6ac, published Apr 14, 2025, 3:08 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2025, 3:22 AM EST | Mar 6, 2025, 4:44 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 32abf9a6-eb5a-4b29-9ffc-3721c3ff83ea, published Mar 6, 2025, 11:14 AM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 1, 2025, 3:07 AM EST | Jan 1, 2025, 3:22 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 40,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record f62cc34e-04af-4345-95c7-9b3c16094ea1, published Feb 12, 2025, 12:25 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 1, 2025, 3:07 AM EST | Jan 1, 2025, 3:22 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 46126c45-ce84-4ad9-8cc4-92844eb91a10, published Jan 1, 2025, 11:21 AM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 30, 2024, 8:30 AM EST | Dec 30, 2024, 8:45 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4757bb94-3b06-4b6c-b00b-3076b8102270, published Jan 13, 2025, 1:36 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 30, 2024, 8:27 AM EST | Dec 30, 2024, 8:45 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record c5327308-0039-4beb-a72d-749f71e94510, published Dec 30, 2024, 11:25 AM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 11, 2024, 2:45 PM EST | Dec 11, 2024, 4:15 PM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 560,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record c2ff1bdf-fd12-49e1-b682-aeceea69d61b, published Jan 13, 2025, 1:38 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 11, 2024, 2:45 PM EST | Dec 11, 2024, 4:15 PM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 56,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record bdc3857d-dfa7-413d-afc1-1979354e86ac, published Jan 13, 2025, 1:30 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 11, 2024, 2:37 PM EST | Dec 11, 2024, 4:15 PM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record f2adaf64-a0bf-414a-99af-2719f30fea01, published Dec 12, 2024, 3:58 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 18, 2024, 8:18 AM EDT | Aug 18, 2024, 8:28 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 3d7a4d22-a441-4abb-b86b-d685a6397e24, published Sep 4, 2024, 9:12 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 18, 2024, 7:52 AM EDT | Aug 18, 2024, 8:28 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 39be428b-c210-4dac-8ffd-ca1529b13205, published Aug 19, 2024, 9:44 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 15, 2024, 4:45 PM EDT | Aug 15, 2024, 5:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 20,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d89806bc-3207-4813-a9e8-8986fdb5016d, published Sep 4, 2024, 7:26 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 15, 2024, 4:38 PM EDT | Aug 15, 2024, 5:15 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 5ba9eca9-1e5c-43fb-86c4-080e17874041, published Aug 15, 2024, 5:37 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 4, 2024, 5:15 PM EDT | Aug 4, 2024, 5:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 150,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 199b1974-5d91-48a4-9bbf-6db85a9c6def, published Sep 4, 2024, 7:21 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 4, 2024, 5:08 PM EDT | Aug 4, 2024, 5:45 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 3420d4a8-195f-41de-ba8c-069e665cb0b2, published Aug 5, 2024, 10:03 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 31, 2024, 12:00 PM EDT | Jul 31, 2024, 12:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 830,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record efe4f5a7-6a4d-4088-b8dc-5eef9e31d872, published Aug 13, 2024, 3:09 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 31, 2024, 11:57 AM EDT | Jul 31, 2024, 12:30 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record db4e7872-abab-4717-8a21-25be7cc39701, published Jul 31, 2024, 2:56 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 31, 2024, 11:50 AM EDT | Jul 31, 2024, 12:05 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 104,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b4682fff-9d6c-497e-95e0-1d65bdb9715f, published Aug 16, 2024, 8:11 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 31, 2024, 11:50 AM EDT | Jul 31, 2024, 12:05 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 9581a219-a113-445f-854e-0e51bd9fa8be, published Aug 1, 2024, 10:27 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2024, 12:15 AM EDT | Jun 27, 2024, 12:20 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 26,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 9e94ff6b-d916-4819-97ed-0801561d7368, published Jul 12, 2024, 9:51 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2024, 12:15 AM EDT | Jun 27, 2024, 12:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 780,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record c0ef9a7d-13af-4798-9584-9e4662dee66f, published Jul 10, 2024, 2:46 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2024, 12:15 AM EDT | Jun 27, 2024, 12:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 78,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b0c86c3b-5fff-4d37-ad95-49881eb649a2, published Jul 10, 2024, 2:36 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2024, 12:15 AM EDT | Jun 27, 2024, 12:20 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b05c7762-45b8-495c-ba4e-57c240d1602b, published Jun 28, 2024, 8:43 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2024, 12:12 AM EDT | Jun 27, 2024, 12:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record fecb8a66-90c2-43cc-bf10-63ac05cc6405, published Jun 27, 2024, 2:44 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2024, 9:40 PM EDT | Jun 20, 2024, 9:45 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 26,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 218f1af5-52de-4041-8f5f-a3383dc42e8e, published Jul 12, 2024, 9:45 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2024, 9:40 PM EDT | Jun 20, 2024, 10:19 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 160,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 8c1d98d1-3765-409c-a80d-7b89a3bb5f53, published Jul 10, 2024, 3:45 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2024, 9:40 PM EDT | Jun 20, 2024, 9:45 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4a7cb712-5318-493d-8de9-330685cd0615, published Jun 21, 2024, 2:00 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 14, 2024, 1:35 PM EDT | Jun 14, 2024, 2:05 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 396,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record d5e8de66-4a35-4faa-9d96-b7760b060abc, published Jul 12, 2024, 9:43 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 14, 2024, 1:35 PM EDT | Jun 14, 2024, 2:05 PM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4525dcce-aa6b-40e6-a0b0-fd3bdea78b7b, published Jun 21, 2024, 2:02 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2024, 9:48 AM EDT | May 30, 2024, 9:48 AM EDT | MASSACHUSETTS WATER RESOURCES AUTHORITY | MWR003 165 FT WEST OF ALEWIFE STATION ACCESS RD | Combined sewer overflow (CSO) | 0 gallons | MASSACHUSETTS WATER RESOURCES AUTHORITY (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record a2efcaef-3c89-4f48-8ee8-1f40bae82621, published Jun 3, 2024, 9:00 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2024, 9:30 AM EDT | May 30, 2024, 10:30 AM EDT | CITY OF CAMBRIDGE | CAM401B INT MASS AVE & ALEWIFE BK | Combined sewer overflow (CSO) | 15,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record e19c80eb-ed61-4596-b129-0f3f3f230e77, published Jun 12, 2024, 2:12 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2024, 9:25 AM EDT | May 30, 2024, 10:05 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO) | 290,000 gallons | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 41685791-a6c0-44d7-9330-77b3f252a88d, published Jun 12, 2024, 9:11 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2024, 9:25 AM EDT | May 30, 2024, 10:05 AM EDT | CITY OF SOMERVILLE | SOM001A 100 FT BEYOND END OF MATIGNON RD | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF SOMERVILLE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 4b4a7d07-84f9-49d7-a276-a7deeb091621, published May 31, 2024, 9:35 AM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2024, 8:30 AM EDT | May 30, 2024, 10:45 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 2.18 million gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record bf41d561-c8da-4391-9782-0d792269db64, published Jun 12, 2024, 2:07 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 27, 2024, 11:22 PM EDT | May 27, 2024, 11:22 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 0 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record f185b147-6b85-4604-96f2-9e8184237330, published Jun 12, 2024, 1:54 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 27, 2024, 11:22 PM EDT | May 27, 2024, 11:22 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record b6fea55e-e22c-47fe-85e9-7cc349c05472, published May 28, 2024, 6:17 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 8, 2024, 11:37 AM EDT | May 8, 2024, 11:54 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO)Earlier version | volume not reported | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record e805f33c-10c0-433d-a042-5e42d190b052, published May 8, 2024, 1:17 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 8, 2024, 11:34 AM EDT | May 8, 2024, 11:54 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 60,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 0e0d09ec-48de-415d-bc83-aa307d557011, published Jun 12, 2024, 1:58 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 12, 2024, 9:03 AM EDT | Apr 12, 2024, 9:23 AM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 20,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 1815cc08-fae9-4e4c-b682-93e11bdd0964, published Jan 30, 2025, 5:46 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 23, 2024, 8:22 PM EDT | Mar 23, 2024, 9:18 PM EDT | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 100,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record 841690f9-2b82-45f7-ac0f-b765114b348e, published Jan 30, 2025, 5:39 PM EST, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 7, 2024, 2:27 AM EST | Mar 7, 2024, 2:37 AM EST | CITY OF CAMBRIDGE | CAM401A MBTA 97 CAMBRIDGE PARK DR | Combined sewer overflow (CSO) | 10,000 gallons | CITY OF CAMBRIDGE (MassDEP sewage notification portal) via MassDEP CSO API behind the portal, record da606a2b-b8a1-4359-933f-aac46f8c4e3e, published Apr 11, 2024, 4:49 PM EDT, retrieved 2026-11-02 10:58 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
Showing the latest 100 records of 222 records. See them all with filters.
Wastewater outlets on this water
Outfall: a pipe or outlet where wastewater enters a water body.
No wastewater outlet in our records is linked to this water.
Sewer operators listed for this water: City of Cambridge DPW, City of Somerville DPW, Massachusetts Water Resources Authority.
Boat launches
No public boat launch is listed in our records for this water.
Sources covering this water
- MassDEP CSO API behind the portal · Latest check succeeded · Last successful check: 2026-11-02 15:54 UTC
222 records linked to this water. Updated Nov 2, 2026, 11:21 AM EST.