Connecticut / Waters /
Hockanum River
River in Connecticut · near East Hartford, Ellington, Hartford, Manchester, Vernon
Current status
This badge describes the water outline. Check the downstream stretches below for discharge statuses.
No current status is assigned to this water outline. Check the water page for reports and any estimated downstream stretches.
Why this status: No current status: no report we track sets a status on this water outline now.
How long each status lasts, and why
Sources checked: CT DEEP CSO/SSO Performance Dashboard (QScend) (last successful check 2026-11-02 17:08 UTC); CT DEEP Sewage Right-to-Know annual report 2024 (last successful check 2026-11-02 17:10 UTC); CT DEEP reporting archive 2016-2021 (last successful check 2026-11-02 17:10 UTC). Status by DirtyWaterWatch, updated 2026-11-02 17:13 UTC.
No status does not mean the water is safe. Follow posted signs and local health advice.
Updated Nov 2, 2026, 12:13 PM EST.
Conditions
At the Hockanum River near East Hartford, CT gauge, on this water: flow 61.4 cubic feet per second (Nov 2, 2026, 11:30 AM EST).
Water level 2 feet. The National Weather Service flood stage at this gauge is 9 feet (National Weather Service gauge page).
Conditions are measured at the gauge, not at this spot, and do not change the status.
Source: U.S. Geological Survey via Water Data for the Nation, gauge 01192500, reading Nov 2, 2026, 11:30 AM EST, retrieved 2026-11-02 17:12 UTC; flood stage: NOAA National Weather Service, gauge EHDC3. Gauge chosen by DirtyWaterWatch. · Readings and history at USGS
Check The Metropolitan District (MDC) - Hartford Water Pollution Control Facility and combined sewer system's notices · Bookmark this water page and check it before each trip · Report a missing notice or error
Map
Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Estimated downstream stretches on Hockanum River
No downstream stretch has a current status here as of Nov 2, 2026, 12:13 PM EST. Check the reports below.
The last 90 days
- Caution: Sep 25, 2026, 6:00 PM EDT to Sep 26, 2026, 6:00 PM EDT · from report 1
- Discharge or advisory reported: Sep 23, 2026, 5:00 PM EDT to Sep 25, 2026, 6:00 PM EDT · from report 1
Source: DirtyWaterWatch calculations using the reports linked above and the published status rules. Updated 2026-11-02 17:13 UTC.
Reported discharges over time
- Reported discharges, last 12 months2December 2025 to November 2026
- Days with a reported discharge, last 12 months2December 2025 to November 2026
- Hours with a discharge or advisory status, last 12 months103December 2025 to November 2026
- 2026 season with a discharge or advisory status1.1%May to October; 49 hours
Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system. Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater. Outfall: a pipe or outlet where wastewater enters a water body.
Reported discharges per month
11 reported discharges, January 2022 to November 2026. Counted from 9 source-confirmed or annual reports, 2 public notices.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
Connecticut dashboard records begin December 2, 2021; where Connecticut's annual report covers an operator's month, the annual report is counted instead. Connecticut's Sewage Right-to-Know annual reports cover January 1, 2021 to November 2, 2026.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports. Records cover January 1, 2022 to November 2, 2026.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| January 2022 | 0 | 1 | 0 | 1 | Source-confirmed reports or annual reports | |
| February 2022 | 0 | 0 | 0 | 0 | ||
| March 2022 | 0 | 0 | 0 | 0 | ||
| April 2022 | 0 | 0 | 0 | 0 | ||
| May 2022 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| June 2022 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| July 2022 | 0 | 0 | 0 | 0 | ||
| August 2022 | 0 | 0 | 0 | 0 | ||
| September 2022 | 0 | 0 | 0 | 0 | ||
| October 2022 | 0 | 0 | 0 | 0 | ||
| November 2022 | 0 | 0 | 0 | 0 | ||
| December 2022 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| January 2023 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| February 2023 | 0 | 1 | 0 | 1 | Source-confirmed reports or annual reports | |
| March 2023 | 0 | 0 | 0 | 0 | ||
| April 2023 | 0 | 0 | 0 | 0 | ||
| May 2023 | 0 | 0 | 0 | 0 | ||
| June 2023 | 0 | 0 | 0 | 0 | ||
| July 2023 | 0 | 0 | 0 | 0 | ||
| August 2023 | 0 | 0 | 0 | 0 | ||
| September 2023 | 0 | 0 | 0 | 0 | ||
| October 2023 | 0 | 0 | 0 | 0 | ||
| November 2023 | 0 | 0 | 0 | 0 | ||
| December 2023 | 0 | 0 | 0 | 0 | ||
| January 2024 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| February 2024 | 0 | 0 | 0 | 0 | ||
| March 2024 | 0 | 0 | 0 | 0 | ||
| April 2024 | 0 | 0 | 0 | 0 | ||
| May 2024 | 0 | 0 | 0 | 0 | ||
| June 2024 | 0 | 0 | 0 | 0 | ||
| July 2024 | 0 | 0 | 0 | 0 | ||
| August 2024 | 0 | 1 | 0 | 1 | Source-confirmed reports or annual reports | |
| September 2024 | 0 | 1 | 0 | 1 | Source-confirmed reports or annual reports | |
| October 2024 | 0 | 0 | 0 | 0 | ||
| November 2024 | 0 | 0 | 0 | 0 | ||
| December 2024 | 0 | 0 | 0 | 0 | ||
| January 2025 | 0 | 0 | 0 | 0 | ||
| February 2025 | 0 | 0 | 0 | 0 | ||
| March 2025 | 0 | 0 | 0 | 0 | ||
| April 2025 | 0 | 0 | 0 | 0 | ||
| May 2025 | 0 | 0 | 0 | 0 | ||
| June 2025 | 0 | 0 | 0 | 0 | ||
| July 2025 | 0 | 0 | 0 | 0 | ||
| August 2025 | 0 | 0 | 0 | 0 | ||
| September 2025 | 0 | 0 | 0 | 0 | ||
| October 2025 | 0 | 0 | 0 | 0 | ||
| November 2025 | 0 | 0 | 0 | 0 | ||
| December 2025 | 0 | 0 | 0 | 0 | ||
| January 2026 | 0 | 0 | 0 | 0 | ||
| February 2026 | 0 | 0 | 0 | 0 | ||
| March 2026 | 0 | 0 | 1 | 1 | Public notices without a matching detailed report | |
| April 2026 | 0 | 0 | 0 | 0 | ||
| May 2026 | 0 | 0 | 0 | 0 | ||
| June 2026 | 0 | 0 | 0 | 0 | ||
| July 2026 | 0 | 0 | 0 | 0 | ||
| August 2026 | 0 | 0 | 0 | 0 | ||
| September 2026 | 0 | 1 | 0 | 1 | Public notices without a matching detailed report | |
| October 2026 | 0 | 0 | 0 | 0 | ||
| November 2026 | 0 | 0 | 0 | 0 |
Hours with a discharge or advisory status per month
Hours when this water had a discharge or advisory status under DirtyWaterWatch rules.
- Discharge or advisory reported
14 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here. Connecticut dashboard records begin December 2, 2021; where Connecticut's annual report covers an operator's month, the annual report is counted instead. Connecticut's Sewage Right-to-Know annual reports cover January 1, 2021 to November 2, 2026. Connecticut's reporting archive runs from July 4, 2016 to December 2, 2021.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Month | Hours with a discharge or advisory status | Hours from post-discharge periods | Hours in the month | Coverage |
|---|---|---|---|---|
| January 2022 | 56 | 56 | 744 | |
| February 2022 | 0 | 0 | 672 | |
| March 2022 | 0 | 0 | 744 | |
| April 2022 | 0 | 0 | 720 | |
| May 2022 | 0 | 0 | 744 | |
| June 2022 | 48 | 48 | 720 | |
| July 2022 | 0 | 0 | 744 | |
| August 2022 | 0 | 0 | 744 | |
| September 2022 | 0 | 0 | 720 | |
| October 2022 | 0 | 0 | 744 | |
| November 2022 | 0 | 0 | 720 | |
| December 2022 | 48 | 48 | 744 | |
| January 2023 | 48 | 48 | 744 | |
| February 2023 | 51 | 51 | 672 | |
| March 2023 | 0 | 0 | 744 | |
| April 2023 | 0 | 0 | 720 | |
| May 2023 | 0 | 0 | 744 | |
| June 2023 | 0 | 0 | 720 | |
| July 2023 | 0 | 0 | 744 | |
| August 2023 | 0 | 0 | 744 | |
| September 2023 | 0 | 0 | 720 | |
| October 2023 | 0 | 0 | 744 | |
| November 2023 | 0 | 0 | 720 | |
| December 2023 | 0 | 0 | 744 | |
| January 2024 | 10 | 10 | 744 | |
| February 2024 | 41 | 41 | 696 | |
| March 2024 | 0 | 0 | 744 | |
| April 2024 | 0 | 0 | 720 | |
| May 2024 | 0 | 0 | 744 | |
| June 2024 | 0 | 0 | 720 | |
| July 2024 | 0 | 0 | 744 | |
| August 2024 | 57 | 57 | 744 | |
| September 2024 | 52 | 52 | 720 | |
| October 2024 | 0 | 0 | 744 | |
| November 2024 | 0 | 0 | 720 | |
| December 2024 | 0 | 0 | 744 | |
| January 2025 | 0 | 0 | 744 | |
| February 2025 | 0 | 0 | 672 | |
| March 2025 | 0 | 0 | 744 | |
| April 2025 | 0 | 0 | 720 | |
| May 2025 | 0 | 0 | 744 | |
| June 2025 | 0 | 0 | 720 | |
| July 2025 | 0 | 0 | 744 | |
| August 2025 | 0 | 0 | 744 | |
| September 2025 | 0 | 0 | 720 | |
| October 2025 | 0 | 0 | 744 | |
| November 2025 | 0 | 0 | 720 | |
| December 2025 | 0 | 0 | 744 | |
| January 2026 | 0 | 0 | 744 | |
| February 2026 | 0 | 0 | 672 | |
| March 2026 | 55 | 55 | 744 | |
| April 2026 | 0 | 0 | 720 | |
| May 2026 | 0 | 0 | 744 | |
| June 2026 | 0 | 0 | 720 | |
| July 2026 | 0 | 0 | 744 | |
| August 2026 | 0 | 0 | 744 | |
| September 2026 | 49 | 49 | 720 | |
| October 2026 | 0 | 0 | 744 | |
| November 2026 | 0 | 0 | 37 |
Days with a reported discharge per month
A day counts when any counted discharge was under way on it, from its start to its reported end in Eastern Time; a report with no end counts its start day.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports. Records cover January 1, 2022 to November 2, 2026.
Show table
| Month | Days with a reported discharge | Coverage |
|---|---|---|
| January 2022 | 1 | |
| February 2022 | 0 | |
| March 2022 | 0 | |
| April 2022 | 0 | |
| May 2022 | 1 | |
| June 2022 | 1 | |
| July 2022 | 0 | |
| August 2022 | 0 | |
| September 2022 | 0 | |
| October 2022 | 0 | |
| November 2022 | 0 | |
| December 2022 | 1 | |
| January 2023 | 1 | |
| February 2023 | 1 | |
| March 2023 | 0 | |
| April 2023 | 0 | |
| May 2023 | 0 | |
| June 2023 | 0 | |
| July 2023 | 0 | |
| August 2023 | 0 | |
| September 2023 | 0 | |
| October 2023 | 0 | |
| November 2023 | 0 | |
| December 2023 | 0 | |
| January 2024 | 1 | |
| February 2024 | 0 | |
| March 2024 | 0 | |
| April 2024 | 0 | |
| May 2024 | 0 | |
| June 2024 | 0 | |
| July 2024 | 0 | |
| August 2024 | 1 | |
| September 2024 | 1 | |
| October 2024 | 0 | |
| November 2024 | 0 | |
| December 2024 | 0 | |
| January 2025 | 0 | |
| February 2025 | 0 | |
| March 2025 | 0 | |
| April 2025 | 0 | |
| May 2025 | 0 | |
| June 2025 | 0 | |
| July 2025 | 0 | |
| August 2025 | 0 | |
| September 2025 | 0 | |
| October 2025 | 0 | |
| November 2025 | 0 | |
| December 2025 | 0 | |
| January 2026 | 0 | |
| February 2026 | 0 | |
| March 2026 | 1 | |
| April 2026 | 0 | |
| May 2026 | 0 | |
| June 2026 | 0 | |
| July 2026 | 0 | |
| August 2026 | 0 | |
| September 2026 | 1 | |
| October 2026 | 0 | |
| November 2026 | 0 |
Reported discharges per year, 2016 to 2026
64 reported discharges, 2016 to 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- Incomplete source coverage
Connecticut dashboard records begin December 2, 2021; where Connecticut's annual report covers an operator's month, the annual report is counted instead. Connecticut's Sewage Right-to-Know annual reports cover January 1, 2021 to November 2, 2026. Connecticut's reporting archive runs from July 4, 2016 to December 2, 2021.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Year | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Coverage |
|---|---|---|---|---|---|
| 2016 | 0 | 1 | 0 | 1 | Incomplete source coverage |
| 2017 | 0 | 0 | 5 | 5 | |
| 2018 | 0 | 1 | 4 | 5 | |
| 2019 | 0 | 3 | 1 | 4 | |
| 2020 | 0 | 0 | 2 | 2 | |
| 2021 | 0 | 6 | 30 | 36 | Incomplete source coverage |
| 2022 | 0 | 1 | 3 | 4 | |
| 2023 | 0 | 1 | 1 | 2 | |
| 2024 | 0 | 2 | 1 | 3 | |
| 2025 | 0 | 0 | 0 | 0 | |
| 2026 | 0 | 1 | 1 | 2 |
Reported volume per year
Gallons (axis: K thousand, M million), summed from the 38 reports that gave a volume as a number (26 did not).
- Incomplete source coverage
26 of 64 discharge reports gave no volume as a number (8 gave a range); only numbers are summed. Connecticut's 2016 to 2021 archive gives volumes as ranges ("20,001 - 50,000 gallons"); they are not summed.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Year | Reported volume, gallons | Reports with a volume | Reports without a volume | Coverage |
|---|---|---|---|---|
| 2016 | 0 | 0 | 1 | Incomplete source coverage |
| 2017 | 1,916,432 | 5 | 0 | |
| 2018 | 3,667,188 | 4 | 1 | |
| 2019 | 7,030,000 | 2 | 2 | |
| 2020 | 0 | 0 | 2 | |
| 2021 | 38,775,580 | 17 | 19 | Incomplete source coverage |
| 2022 | 142,106 | 3 | 1 | |
| 2023 | 56,550 | 2 | 0 | |
| 2024 | 201,025 | 3 | 0 | |
| 2025 | 0 | 0 | 0 | |
| 2026 | 1,501,000 | 2 | 0 |
Hours with a discharge or advisory status per year
Hours with a discharge or advisory status each year under DirtyWaterWatch rules; 2026 to date.
- Discharge or advisory reported
- Incomplete source coverage
14 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Year | Hours with a discharge or advisory status | Share of the year | Coverage |
|---|---|---|---|
| 2016 | 57 | 0.6% | Incomplete source coverage |
| 2017 | 155 | 1.8% | |
| 2018 | 692 | 7.9% | |
| 2019 | 170 | 1.9% | |
| 2020 | 90 | 1.0% | |
| 2021 | 986 | 11.3% | Incomplete source coverage |
| 2022 | 152 | 1.7% | |
| 2023 | 99 | 1.1% | |
| 2024 | 159 | 1.8% | |
| 2025 | 0 | 0.0% | |
| 2026 | 103 | 1.4% |
Reported discharges by calendar month, all years
Every counted discharge report, by the calendar month it began.
Months are summed over every year a tracked source covers; the table gives the number of years behind each month.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Month | Reported discharges | Years of records |
|---|---|---|
| January | 9 | 10 |
| February | 1 | 10 |
| March | 7 | 10 |
| April | 2 | 10 |
| May | 2 | 10 |
| June | 5 | 10 |
| July | 6 | 11 |
| August | 6 | 11 |
| September | 11 | 11 |
| October | 8 | 11 |
| November | 5 | 11 |
| December | 2 | 10 |
Reported discharges by wastewater outlet
Wastewater outlets with the most tracked discharge records: 10 of 23, all years. Counts depend on reporting coverage and do not measure legal compliance or harm.
Connecticut dashboard records begin December 2, 2021; where Connecticut's annual report covers an operator's month, the annual report is counted instead. Connecticut's Sewage Right-to-Know annual reports cover January 1, 2021 to November 2, 2026. Connecticut's reporting archive runs from July 4, 2016 to December 2, 2021.
Sources: Connecticut Department of Energy and Environmental Protection sewage overflow dashboard; Connecticut Sewage Right-to-Know annual reports; Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021. Records cover July 4, 2016 to November 2, 2026.
Show table
| Wastewater outlet | Sewer operator | Reported discharges |
|---|---|---|
| Treatment Plant, 100 Windsorville Road | Vernon WPCF | 21 |
| Treatment Plant, 100 Windsorville Road Vernon CT | Vernon WPCF | 7 |
| Treatment Plant, 100 Windsorville Rd, Vernon, CT | VERNON WPCF | 5 |
| Treatment Plant, 120 Thrall Road | Manchester | 4 |
| Treatment Plant, 100 Windsorville Road Vernon | Vernon WPCF | 3 |
| Basement, MAIN ST | The Metropolitan District | 3 |
| Treatment Plant, 100 Windsorville Rd | Vernon WPCF | 3 |
| Treatment Plant, 120 Thraw Road | Manchester | 2 |
| Sewer Main, 100 Union Street Manchester CT | Manchester | 2 |
| Manhole, 100 Windsorville Rd, Vernon, CT | ELLINGTON - CRYSTAL LAKE & HOCKANUM | 1 |
| Other outlets (13) | 13 |
How these charts are counted
We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow this site's rules. Shaded gaps mean missing coverage, not zero discharges.
- Connecticut Department of Energy and Environmental Protection sewage overflow dashboard: records from December 2, 2021 to the latest update
- Connecticut Sewage Right-to-Know annual reports: records from January 1, 2021 to the latest update
- Connecticut Department of Energy and Environmental Protection reporting archive, 2016 to 2021: records from July 4, 2016 to December 2, 2021
Reports linked to Hockanum River
| Start | End | Sewer operator | Outlet | Type | Volume | Source | Links |
|---|---|---|---|---|---|---|---|
| Sep 23, 2026, 5:00 PM EDT | Sep 23, 2026, 5:30 PM EDT | MANCHESTER (Hockanum River WPCF) | Manhole, 107 N School St, Manchester, CT | Sanitary sewer overflow (SSO) | 1,000 gallons | MANCHESTER (Hockanum River WPCF) (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11523, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Read report: Sanitary sewer overflow (SSO), MANCHESTER (Hockanum River WPCF), Sep 23, 2026, 5:00 PM EDT · Map |
| Mar 8, 2026, 1:45 PM EDT | Mar 8, 2026, 8:30 PM EDT | VERNON WPCF | Treatment Plant, 100 Windsorville Rd, Vernon, CT | Treatment plant bypass | 1.5 million gallons | VERNON WPCF (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10376, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 17, 2024, 11:00 AM EDT | Sep 17, 2024, 3:00 PM EDT | ELLINGTON - CRYSTAL LAKE & HOCKANUM | Manhole, 100 Windsorville Rd, Vernon, CT | Sanitary sewer overflow (SSO) | 50 gallons | ELLINGTON - CRYSTAL LAKE & HOCKANUM (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xc47d5f528f2c, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 28, 2024, 11:45 AM EDT | Aug 28, 2024, 9:00 PM EDT | VERNON WPCF | Sewer Main, 243 Hartford Turnpike, Vernon, CT | Sanitary sewer overflow (SSO) | 975 gallons | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xb28aecb10668, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 31, 2024, 2:30 PM EST | Jan 31, 2024, 4:30 PM EST | MANCHESTER (Hockanum River WPCF) | Treatment Plant, 311 Olcott St, Manchester, CT | Treatment plant bypass | 200,000 gallons | MANCHESTER (Hockanum River WPCF) (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x31ac4594a2ba, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Feb 6, 2023, 1:15 PM EST | Feb 6, 2023, 3:45 PM EST | MANCHESTER 8th DISTRICT | Sewer Main, 433 N Main St, Manchester, CT | Sanitary sewer overflow (SSO) | 1,050 gallons | MANCHESTER 8th DISTRICT (CT DEEP Sewage Right-to-Know annual report 2024), record xf9b0412b644f, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 20, 2023, 12:45 AM EST | Jan 20, 2023, 1:00 AM EST | VERNON WPCF | Treatment Plant, 100 Windsorville Rd, Vernon, CT | Treatment plant bypass | 55,500 gallons | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2024), record x64440ed12311, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 15, 2022, 12:15 PM EST | Dec 15, 2022, 12:15 PM EST | VERNON WPCF | Treatment Plant, 100 Windsorville Rd, Vernon, CT | Treatment plant bypass | 5,000 gallons | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x90ead111e6af, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 27, 2022, 3:15 PM EDT | Jun 27, 2022, 3:30 PM EDT | VERNON WPCF | Treatment Plant, 100 Windsorville Rd, Vernon, CT | Treatment plant bypass | “<500 gallons” | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record xd6dab8827541, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 28, 2022, 5:00 PM EDT | May 28, 2022, 5:45 AM EDT | VERNON WPCF | Treatment Plant, 100 Windsorville Rd, Vernon, CT | Treatment plant bypass | 127,106 gallons | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x1670b40e65c3, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 24, 2022, 9:00 AM EST | Jan 24, 2022, 4:45 PM EST | VERNON WPCF | Pump Station, 25 Hartford Turnpike, Vernon, CT | Sanitary sewer overflow (SSO) | 10,000 gallons | VERNON WPCF (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x6a9ed9a66fdb, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 24, 2021, 6:45 PM EST | Dec 24, 2021, 8:45 PM EST | MDC COLLECTIONS | Manhole, 22 Woodlawn Cir, East Hartford, CT | Sanitary sewer overflow (SSO) | 950 gallons | MDC COLLECTIONS (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xc5fbea041767, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 4, 2021, 3:30 AM EDT | Nov 4, 2021, 4:36 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 114,510 gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xe31764cd232e, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 4, 2021, 3:30 AM EDT | Nov 4, 2021, 4:36 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 114,510 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963161, reported Nov 4, 2021, 5:35 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 22, 2021, 10:00 AM EDT | Oct 19, 2021, 10:10 AM EDT | Manchester | Treatment Plant, 120 Thraw Road | Treatment plant bypass | 500 gallons | Manchester (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x1f6e016935be, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 22, 2021, 10:00 AM EDT | Oct 19, 2021, 10:10 AM EDT | Manchester | Treatment Plant, 120 Thraw Road | Treatment plant bypass | 500 gallons | Manchester (CT DEEP reporting archive 2016-2021), record bypass-35964122, reported Oct 19, 2021, 3:18 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 1, 2021, 9:20 AM EDT | Oct 1, 2021, 2:45 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x8c538dc90beb, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 1, 2021, 9:20 AM EDT | Oct 1, 2021, 2:45 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963102, reported Oct 1, 2021, 10:48 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 1, 2021, 9:20 AM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963101, reported Oct 1, 2021, 10:48 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 3, 2021, 1:34 PM EDT | Sep 3, 2021, 3:36 PM EDT | Manchester | Treatment Plant, 120 Thrall Road | Treatment plant bypass | 1 million gallons | Manchester (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x32f2623f6665, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 3, 2021, 1:34 PM EDT | Sep 3, 2021, 3:36 PM EDT | Manchester | Treatment Plant, 120 Thrall Road | Treatment plant bypass | “Over 1,000,000 gallons” | Manchester (CT DEEP reporting archive 2016-2021), record bypass-35963168, reported Sep 3, 2021, 3:50 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 1:40 PM EDT | Sep 2, 2021, 1:41 PM EDT | Manchester | Treatment Plant, 120 Thrall Road | Treatment plant bypass | 1 million gallons | Manchester (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x5b19140a3ed8, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 1:40 PM EDT | Sep 2, 2021, 1:41 PM EDT | Manchester | Treatment Plant, 120 Thrall Road | Treatment plant bypass | “Over 1,000,000 gallons” | Manchester (CT DEEP reporting archive 2016-2021), record bypass-35963277, reported Sep 2, 2021, 1:56 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 1:40 AM EDT | Sep 6, 2021, 11:30 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon | Treatment plant bypass | 1 million gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xc6c33b2806d4, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 1:40 AM EDT | Sep 6, 2021, 11:30 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963564, reported Sep 2, 2021, 1:56 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 1:40 AM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963563, reported Sep 2, 2021, 1:56 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:40 PM EDT | Aug 24, 2021, 1:30 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 1 million gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xb62de800e5cf, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:40 PM EDT | Aug 24, 2021, 1:30 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963591, reported Aug 22, 2021, 3:01 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:40 PM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963590, reported Aug 22, 2021, 3:01 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 17, 2021, 6:20 PM EDT | Jul 20, 2021, 1:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x52c3309d6ce9, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 17, 2021, 6:20 PM EDT | Jul 20, 2021, 1:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963532, reported Jul 17, 2021, 6:54 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 17, 2021, 6:20 PM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963531, reported Jul 17, 2021, 6:54 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 11:30 AM EDT | Jul 12, 2021, 3:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 1 million gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xdecc6dfc8613, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 11:30 AM EDT | Jul 12, 2021, 3:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963576, reported Jul 9, 2021, 12:50 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 11:30 AM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963575, reported Jul 9, 2021, 12:50 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2021, 7:00 AM EDT | Jun 20, 2021, 7:05 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 368,000 gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x6ed45f698cb6, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2021, 7:00 AM EDT | Jun 20, 2021, 7:05 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 368,000 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963128, reported Jun 20, 2021, 8:22 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2021, 2:00 PM EST | Mar 6, 2021, 2:00 PM EST | Manchester | Sewer Main, 100 Union Street Manchester CT | Sanitary sewer overflow (SSO) | 30 gallons | Manchester (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xde2d89bce9dd, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2021, 2:00 PM EST | end not reported | Manchester | Sewer Main, 100 Union Street Manchester CT | Sanitary sewer overflow (SSO) | “1 - 50” | Manchester (CT DEEP reporting archive 2016-2021), record bypass-35964071, reported Mar 9, 2021, 12:00 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 4, 2021, 10:23 PM EST | Mar 4, 2021, 11:27 PM EST | The Metropolitan District | Basement, MAIN ST | Sanitary sewer overflow (SSO) | “Less than 10g” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35965477, reported Mar 4, 2021, 10:59 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 4, 2021, 10:23 PM EST | end not reported | The Metropolitan District | Basement, MAIN ST | Sanitary sewer overflow (SSO) | “Less than 10g” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35965476, reported Mar 4, 2021, 10:59 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 4, 2021, 10:23 PM EST | end not reported | The Metropolitan District | Basement, MAIN ST | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35965473, reported Mar 4, 2021, 10:59 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 25, 2021, 8:00 AM EST | Jan 29, 2021, 2:45 PM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | 16.38 million gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x871175c1d3f8, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 25, 2021, 8:00 AM EST | Jan 29, 2021, 2:45 PM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | 16.38 million gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962872, reported Jan 25, 2021, 9:11 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 25, 2021, 8:00 AM EST | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962871, reported Jan 25, 2021, 9:11 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 22, 2021, 12:25 PM EST | Jan 22, 2021, 1:00 PM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 24,290 gallons | Vernon WPCF (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x10946ddf32ae, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 17:08 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 22, 2021, 12:25 PM EST | Jan 22, 2021, 1:00 PM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 24,290 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962873, reported Jan 22, 2021, 1:29 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 4, 2020, 11:00 PM EDT | Aug 6, 2020, 4:30 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Rd | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963104, reported Aug 5, 2020, 12:00 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 4, 2020, 11:00 PM EDT | end not reported | Vernon WPCF | Treatment Plant, 100 Windsorville Rd | Treatment plant bypass | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963103, reported Aug 5, 2020, 12:00 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 17, 2019, 4:00 PM EDT | Sep 16, 2019, 8:30 PM EDT | Vernon WPCF | Sewer Main, 13 West Main Street | Sanitary sewer overflow (SSO) | “Undetermined” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35964782, reported Sep 16, 2019, 5:23 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 8, 2019, 1:35 PM EDT | May 8, 2019, 1:37 PM EDT | The Metropolitan District | TEST Street | Sanitary sewer overflow (SSO) | 0 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35965647, reported May 8, 2019, 1:40 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 17, 2019, 8:20 AM EDT | Apr 18, 2019, 8:30 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Rd | Treatment plant bypass | 7.03 million gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963018, reported Apr 17, 2019, 8:49 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 20, 2019, 10:00 AM EST | Jan 20, 2019, 11:15 AM EST | Vernon WPCF | Manhole, 240 West Main Street | Sanitary sewer overflow (SSO) | “500-1,000 Gallons” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35964896, reported Jan 20, 2019, 10:56 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 15, 2018, 10:00 AM EST | Nov 15, 2018, 11:30 AM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 791,576 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962911, reported Nov 15, 2018, 10:50 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 18, 2018, 3:15 PM EDT | Sep 19, 2018, 8:00 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon, CT | Treatment plant bypass | 2.36 million gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962879, reported Sep 18, 2018, 3:39 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 22, 2018, 11:26 AM EDT | Jul 10, 2018, 10:30 AM EDT | Vernon WPCF | Sewer Main, 34 Pleasantview Drive Vernon CT | Sanitary sewer overflow (SSO) | “1,001 - 5,000 gallons” | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962910, reported Jun 22, 2018, 11:54 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 4, 2018, 8:35 AM EDT | Jun 4, 2018, 9:45 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road Vernon CT | Treatment plant bypass | 226,069 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963106, reported Jun 4, 2018, 10:26 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 21, 2018, 4:30 PM EDT | Mar 21, 2018, 6:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road, Vernon CT | Treatment plant bypass | 293,562 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963131, reported Mar 21, 2018, 5:27 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 6, 2017, 10:54 AM EST | Nov 6, 2017, 11:40 AM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 133,216 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962875, reported Mar 1, 2018, 10:47 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 6, 2017, 10:54 AM EST | Nov 6, 2017, 11:40 AM EST | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 133,216 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35962874, reported Nov 6, 2017, 12:48 PM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 30, 2017, 12:50 AM EDT | Oct 30, 2017, 6:00 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 0 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963133, reported Oct 30, 2017, 2:53 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 30, 2017, 12:50 AM EDT | Oct 30, 2017, 6:00 AM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 1.65 million gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963132, reported Mar 1, 2018, 10:47 AM EST, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 10, 2017, 8:40 AM EDT | Apr 10, 2017, 2:00 PM EDT | Vernon WPCF | Treatment Plant, 100 Windsorville Road | Treatment plant bypass | 0 gallons | Vernon WPCF (CT DEEP reporting archive 2016-2021), record bypass-35963015, reported Apr 10, 2017, 11:51 AM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 29, 2016, 3:00 PM EDT | Oct 29, 2016, 11:30 PM EDT | Manchester | Manhole, 179 Tolland Tpke | Sanitary sewer overflow (SSO) | “1,001-5,000 gallons” | Manchester (CT DEEP reporting archive 2016-2021), record bypass-35965061, reported Oct 31, 2016, 4:05 PM EDT, retrieved 2026-11-02 17:10 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
Wastewater outlets on this water
Outfall: a pipe or outlet where wastewater enters a water body.
No wastewater outlet in our records is linked to this water.
Sewer operators listed for this water: The Metropolitan District (MDC) - Hartford Water Pollution Control Facility and combined sewer system.
Boat launches
No public boat launch is listed in our records for this water.
Sources covering this water
- CT DEEP CSO/SSO Performance Dashboard (QScend) · Latest check succeeded · Last successful check: 2026-11-02 17:08 UTC
- CT DEEP Sewage Right-to-Know annual report 2024 · Latest check succeeded · Last successful check: 2026-11-02 17:10 UTC
- CT DEEP reporting archive 2016-2021 · Latest check succeeded · Last successful check: 2026-11-02 17:10 UTC
64 records linked to this water. Updated Nov 2, 2026, 12:13 PM EST.