DirtyWaterWatch Public waters. Public record.

Indiana / Waters /

Moore Prong

Stream in Indiana, past Licking

Current status

Monthly report

Only a monthly total is reported here: the number of days with a discharge in a month, not the dates. It sets no current status. This status since . Why this status, and its source

Map sources

Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Solid dots mark combined sewer outfalls. Dashed river stretches are estimates.

Rain expected: 0.15 inches (3.8 mm) forecast in the next 24 hours (NWS forecast issued Nov 25, 2026, 6:14 AM EST); discharges here have begun at 0.1 inch (2.5 mm). A forecast, not a report.

Check City of Hartford City's notices · Bookmark this water page and check it before each trip · Report a missing notice or error

About this status

Monthly report: The latest sewage report for this water is a monthly total: for September 2026, a monthly total. Only monthly sewage totals are reported for this water: days with discharge in a month, not their dates.

Source: EPA ECHO discharge monitoring reports (the operator's own monthly CSO totals, filed with IDEM; reported weeks after the month) via EPA ECHO discharge monitoring reports: Indiana combined sewer outfalls' monthly totals (events, hours, million gallons), record IN0021628:01…, reported Oct 22, 2026, retrieved 2026-11-25 22:32 UTC · Original notice · Updated

Reports behind this status

Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system.

Reports behind the status of Moore Prong, newest first
WhenReportStatus
to September 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “4 discharge events, 2.5 hours, 0.101 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapmonthly total
to September 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “1 discharge event, 0.75 hours, 0.01 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapmonthly total
to September 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “4 discharge events, 19.75 hours, 0.544 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapmonthly total

Sources: EPA ECHO discharge monitoring reports: Indiana combined sewer outfalls' monthly totals (events, hours, million gallons), retrieved 2026-11-25 22:32 UTC. A report's record id and times show when you hover or focus its "report" link.

Estimated downstream stretches on Moore Prong

none with a current status

No downstream stretch has a current status here as of Nov 25, 2026, 5:57 PM EST. Check the reports below.

3 routes below outlets with no current status
  • No current status shown Permit IN0021628, outlet 011 · 25 miles (40 km) estimated · Estimate stops at the distance limit, 25 miles (40 km)
  • No current status shown Permit IN0021628, outlet 012 · 25 miles (40 km) estimated · Estimate stops at the distance limit, 25 miles (40 km)
  • No current status shown Permit IN0021628, outlet 016 · 25 miles (40 km) estimated · Estimate stops at the distance limit, 25 miles (40 km)

Source: DirtyWaterWatch estimates using U.S. Geological Survey river maps and flow measurements. The estimate stops at an estuary or the sea, the first lake or the distance limit.

The last 90 days

Last 90 days, hour by hour. Red: discharge or advisory reported. Amber: caution. Hatched amber: end not confirmed. Plum: algal bloom advisory. Red or amber with a light line inside: beach advisory or caution. Dotted: monthly report (days with discharge, dates not given). Grey: no current status on the water outline. Purple hatching: a status resting on a source that could not be checked on schedule.
  • Discharge likely or possible: heavy rain, no report received: to
    Radar estimate, no report received: heavy rain at the outlets of City of Hartford City

Source: DirtyWaterWatch calculations using the reports named above and the published status rules. Updated 2026-11-25 22:57 UTC.

Reported discharges over time

  • Discharges affecting the Moore Prong in Indiana, last 12 months0December 2025 to November 2026Verified reports where available, else notices; revisions and duplicates counted once. Arriving discharges are estimated from modeled downstream reaches.
  • Records behind the last-90-days strip for the Moore Prong in Indiana1Reported on the Moore Prong in Indiana: 0 · Arriving from outfalls upstream, estimated: 0 · Other records (rain-likely and similar): 1last 90 daysEvery distinct record the strip lists for its red, yellow and unresolved hours, notices and unresolved reports included; counted as the strip counts them.

Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater. Outfall: a pipe or outlet where wastewater enters a water body.

Reported discharges per month

0 reported discharges, January 2022 to November 2026.

  • Combined sewer overflow
  • Sanitary sewer overflow
  • Treatment bypass, blended or other
  • Incomplete source coverage
Limited records

Some sewer operators here report only monthly or yearly totals; those appear under reported totals and are not counted here.

Source: U.S. Environmental Protection Agency sewer overflow records. Records cover January 1, 2022 to November 25, 2026.

Show table

Reported monthly totals: U.S. Environmental Protection Agency discharge monitoring reports for Indiana

Monthly totals each Indiana operator files for each combined sewer outlet (number of discharges, hours and million gallons in discharge monitoring reports, published by the U.S. Environmental Protection Agency weeks after the month). They are shown here and never added to the discharge counts. An operator files a month with no discharge as such; a month with no row is one with no discharge or no report, which the reports do not tell apart, so it is left blank, never shown as zero. Source: U.S. Environmental Protection Agency discharge monitoring reports for Indiana. Records cover January 1, 2025 to September 30, 2026.

Reported volume

Gallons per month; 1 million gallons is 3.79 million litres (axis: K thousand, M million); a month with no report is left blank.

Show table

Discharges reported

Discharges per month; a month with no report is left blank.

Show table

Hours of discharge reported

Hours per month; a month with no report is left blank.

Show table
How these charts are counted

We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow our rules. Shaded gaps mean missing coverage, not zero discharges.

  • U.S. Environmental Protection Agency sewer overflow records: records from November 29, 2019 to the latest update (limited records)

Reports linked to Moore Prong

Reports linked to Moore Prong, newest first
WhenReportStatus
to September 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “4 discharge events, 19.75 hours, 0.544 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapended
to September 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “1 discharge event, 0.75 hours, 0.01 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapended
to September 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “4 discharge events, 2.5 hours, 0.101 million gallons in 2026-09 (monthly DMR totals)” report · notice · mapended
to August 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “16 discharge events, 252.75 hours, 12.013 million gallons in 2026-08 (monthly DMR totals)” report · notice · mapended
to August 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “8 discharge events, 100.75 hours, 9.605 million gallons in 2026-08 (monthly DMR totals)” report · notice · mapended
to August 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “9 discharge events, 83 hours, 9.953 million gallons in 2026-08 (monthly DMR totals)” report · notice · mapended
to July 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “2 discharge events, 7.5 hours, 0.306 million gallons in 2026-07 (monthly DMR totals)” report · notice · mapended
to July 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “2 discharge events, 0.75 hours, 0.043 million gallons in 2026-07 (monthly DMR totals)” report · notice · mapended
to June 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “10 discharge events, 49.25 hours, 1.469 million gallons in 2026-06 (monthly DMR totals)” report · notice · mapended
to June 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “5 discharge events, 15.5 hours, 1 million gallons in 2026-06 (monthly DMR totals)” report · notice · mapended
to June 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “6 discharge events, 13 hours, 0.676 million gallons in 2026-06 (monthly DMR totals)” report · notice · mapended
to May 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “9 discharge events, 97 hours, 3.478 million gallons in 2026-05 (monthly DMR totals)” report · notice · mapended
to May 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “4 discharge events, 36 hours, 3.431 million gallons in 2026-05 (monthly DMR totals)” report · notice · mapended
to May 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “4 discharge events, 28.5 hours, 1.859 million gallons in 2026-05 (monthly DMR totals)” report · notice · mapended
to April 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “10 discharge events, 108 hours, 4.699 million gallons in 2026-04 (monthly DMR totals)” report · notice · mapended
to April 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “5 discharge events, 58.25 hours, 4.246 million gallons in 2026-04 (monthly DMR totals)” report · notice · mapended
to April 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “6 discharge events, 46.25 hours, 4.301 million gallons in 2026-04 (monthly DMR totals)” report · notice · mapended
to March 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “10 discharge events, 110.75 hours, 3.779 million gallons in 2026-03 (monthly DMR totals)” report · notice · mapended
to March 2026City of Hartford City · 012 CSO - Water St Golf Course · CSO · “3 discharge events, 28.25 hours, 2.136 million gallons in 2026-03 (monthly DMR totals)” report · notice · mapended
to March 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “5 discharge events, 25.75 hours, 2.927 million gallons in 2026-03 (monthly DMR totals)” report · notice · mapended
to February 2026City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “5 discharge events, 34 hours, 1.441 million gallons in 2026-02 (monthly DMR totals)” report · notice · mapended
to February 2026City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “2 discharge events, 1 hours, 0.01 million gallons in 2026-02 (monthly DMR totals)” report · notice · mapended
to December 2025City of Hartford City · 016 CSO - Westside Treatment Plant · CSO · “1 discharge event, 1.5 hours, 0.009 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “1 discharge event, 0.5 hours, 0.03 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to September 2025City of Hartford City · 011 CSO at Corner of Elm and Wabash · CSO · “3 discharge events, 20.75 hours, 0.009 million gallons in 2025-09 (monthly DMR totals)” report · notice · mapended

Download these reports as CSV

Showing the latest 25 records of 47 records.See them all with filters.

All reports in Indiana by year: 2026 (22 here) · 2025 (25 here)

State water quality assessment

Indiana's 2026 water quality assessment lists Moore Prong unit INB0332_T1006 as impaired by E. coli. The state names combined sewer overflows and septic systems or unsewered areas as probable sources. Indiana's assessment of Moore Prong unit INB0332_T1006 (EPA How's My Waterway)

Indiana's 2026 water quality assessment lists Moore Prong unit INB0332_T1007 as impaired by E. coli. Indiana's assessment of Moore Prong unit INB0332_T1007 (EPA How's My Waterway)

This is the state's assessment of past samples (not a current condition) and does not change the status. How we match assessments to waters

Source: state water quality assessments via U.S. Environmental Protection Agency ATTAINS, national file of November 21, 2026, map layers edited September 2, 2026, 2026 cycle, assessment units INB0332_T1006 and INB0332_T1007, retrieved 2026-11-23 18:33 UTC. Units matched to this water by DirtyWaterWatch. · EPA national assessment file (ZIP, 206 MB)

Records as cited: INB0332_T1006 (2026), INB0332_T1007 (2026).

Wastewater outlets on this water

Combined sewer outfalls

3 outfalls

Source: U.S. Environmental Protection Agency (EPA) national combined sewer outfall inventory (ECHO) and state outfall layers. Open or closed as EPA's inventory lists it. DirtyWaterWatch links outlets to waters using permit numbers, locations and names.

Sewer operators listed for this water: City of Hartford City.

Boat launches

No public boat launch is listed in our records for this water.

Nearby waters

Sources covering this water

47 records linked to this water. Updated .