Neshobe River
River in Vermont · near Brandon, Goshen
Current status
This badge describes the water outline. Check the downstream stretches below for discharge statuses.
No current status is assigned to this water outline. Check the water page for reports and any estimated downstream stretches.
Why this status: No current status: no report we track sets a status on this water outline now.
How long each status lasts, and why
Sources checked: VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page (last successful check 2026-11-02 17:12 UTC). Status by DirtyWaterWatch, updated 2026-11-02 17:13 UTC.
No status does not mean the water is safe. Follow posted signs and local health advice.
Updated Nov 2, 2026, 12:13 PM EST.
Bookmark this water page and check it before each trip · Report a missing notice or error
Map
Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Estimated downstream stretches on Neshobe River
No downstream stretch has a current status here as of Nov 2, 2026, 12:13 PM EST. Check the reports below.
The last 90 days
No discharge, advisory or caution periods are shown on this water outline in this time span. Check downstream stretches and source coverage.
Source: DirtyWaterWatch calculations using the reports linked above and the published status rules. Updated 2026-11-02 17:13 UTC.
Reported discharges over time
- Reported discharges, last 12 months4December 2025 to November 2026
- Days with a reported discharge, last 12 months3December 2025 to November 2026
- Hours with a discharge or advisory status, last 12 months115December 2025 to November 2026
- 2026 season with a discharge or advisory status2.6%May to October; 115 hours
Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system. Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater. Outfall: a pipe or outlet where wastewater enters a water body.
Reported discharges per month
23 reported discharges, January 2022 to November 2026. Counted from 21 source-confirmed or annual reports, 2 public notices.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 1, 2022 to November 2, 2026.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| January 2022 | 0 | 0 | 0 | 0 | ||
| February 2022 | 0 | 1 | 0 | 1 | Source-confirmed reports or annual reports | |
| March 2022 | 0 | 0 | 0 | 0 | ||
| April 2022 | 0 | 0 | 0 | 0 | ||
| May 2022 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| June 2022 | 0 | 0 | 0 | 0 | ||
| July 2022 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| August 2022 | 0 | 0 | 0 | 0 | ||
| September 2022 | 0 | 0 | 0 | 0 | ||
| October 2022 | 0 | 0 | 0 | 0 | ||
| November 2022 | 0 | 0 | 0 | 0 | ||
| December 2022 | 0 | 0 | 0 | 0 | ||
| January 2023 | 2 | 0 | 0 | 2 | Public notices without a matching detailed report | |
| February 2023 | 0 | 0 | 0 | 0 | ||
| March 2023 | 0 | 0 | 0 | 0 | ||
| April 2023 | 0 | 0 | 0 | 0 | ||
| May 2023 | 0 | 0 | 0 | 0 | ||
| June 2023 | 0 | 0 | 0 | 0 | ||
| July 2023 | 0 | 0 | 3 | 3 | Source-confirmed reports or annual reports | |
| August 2023 | 0 | 0 | 0 | 0 | ||
| September 2023 | 0 | 0 | 0 | 0 | ||
| October 2023 | 0 | 0 | 0 | 0 | ||
| November 2023 | 0 | 0 | 0 | 0 | ||
| December 2023 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| January 2024 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| February 2024 | 0 | 0 | 0 | 0 | ||
| March 2024 | 0 | 0 | 4 | 4 | Source-confirmed reports or annual reports | |
| April 2024 | 0 | 0 | 0 | 0 | ||
| May 2024 | 0 | 0 | 0 | 0 | ||
| June 2024 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| July 2024 | 0 | 0 | 0 | 0 | ||
| August 2024 | 0 | 0 | 0 | 0 | ||
| September 2024 | 0 | 0 | 0 | 0 | ||
| October 2024 | 0 | 0 | 0 | 0 | ||
| November 2024 | 0 | 0 | 0 | 0 | ||
| December 2024 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| January 2025 | 0 | 0 | 0 | 0 | ||
| February 2025 | 0 | 0 | 0 | 0 | ||
| March 2025 | 0 | 0 | 2 | 2 | Source-confirmed reports or annual reports | |
| April 2025 | 0 | 0 | 0 | 0 | ||
| May 2025 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| June 2025 | 0 | 0 | 0 | 0 | ||
| July 2025 | 0 | 0 | 0 | 0 | ||
| August 2025 | 0 | 0 | 0 | 0 | ||
| September 2025 | 0 | 0 | 0 | 0 | ||
| October 2025 | 0 | 0 | 0 | 0 | ||
| November 2025 | 0 | 0 | 0 | 0 | ||
| December 2025 | 0 | 0 | 0 | 0 | ||
| January 2026 | 0 | 0 | 0 | 0 | ||
| February 2026 | 0 | 0 | 0 | 0 | ||
| March 2026 | 0 | 0 | 0 | 0 | ||
| April 2026 | 0 | 0 | 0 | 0 | ||
| May 2026 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| June 2026 | 0 | 0 | 2 | 2 | Source-confirmed reports or annual reports | |
| July 2026 | 0 | 0 | 1 | 1 | Source-confirmed reports or annual reports | |
| August 2026 | 0 | 0 | 0 | 0 | ||
| September 2026 | 0 | 0 | 0 | 0 | ||
| October 2026 | 0 | 0 | 0 | 0 | ||
| November 2026 | 0 | 0 | 0 | 0 |
Hours with a discharge or advisory status per month
Hours when this water had a discharge or advisory status under DirtyWaterWatch rules.
- Discharge or advisory reported
8 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Month | Hours with a discharge or advisory status | Hours from post-discharge periods | Hours in the month | Coverage |
|---|---|---|---|---|
| January 2022 | 0 | 0 | 744 | |
| February 2022 | 50 | 50 | 672 | |
| March 2022 | 0 | 0 | 744 | |
| April 2022 | 0 | 0 | 720 | |
| May 2022 | 54 | 54 | 744 | |
| June 2022 | 0 | 0 | 720 | |
| July 2022 | 49 | 49 | 744 | |
| August 2022 | 0 | 0 | 744 | |
| September 2022 | 0 | 0 | 720 | |
| October 2022 | 0 | 0 | 744 | |
| November 2022 | 0 | 0 | 720 | |
| December 2022 | 0 | 0 | 744 | |
| January 2023 | 0 | 0 | 744 | |
| February 2023 | 0 | 0 | 672 | |
| March 2023 | 0 | 0 | 744 | |
| April 2023 | 0 | 0 | 720 | |
| May 2023 | 0 | 0 | 744 | |
| June 2023 | 0 | 0 | 720 | |
| July 2023 | 191 | 191 | 744 | |
| August 2023 | 0 | 0 | 744 | |
| September 2023 | 0 | 0 | 720 | |
| October 2023 | 0 | 0 | 744 | |
| November 2023 | 0 | 0 | 720 | |
| December 2023 | 64 | 64 | 744 | |
| January 2024 | 81 | 81 | 744 | |
| February 2024 | 0 | 0 | 696 | |
| March 2024 | 76 | 76 | 744 | |
| April 2024 | 0 | 0 | 720 | |
| May 2024 | 0 | 0 | 744 | |
| June 2024 | 57 | 57 | 720 | |
| July 2024 | 0 | 0 | 744 | |
| August 2024 | 0 | 0 | 744 | |
| September 2024 | 0 | 0 | 720 | |
| October 2024 | 0 | 0 | 744 | |
| November 2024 | 0 | 0 | 720 | |
| December 2024 | 96 | 96 | 744 | |
| January 2025 | 0 | 0 | 744 | |
| February 2025 | 0 | 0 | 672 | |
| March 2025 | 50 | 50 | 744 | |
| April 2025 | 0 | 0 | 720 | |
| May 2025 | 108 | 108 | 744 | |
| June 2025 | 0 | 0 | 720 | |
| July 2025 | 0 | 0 | 744 | |
| August 2025 | 0 | 0 | 744 | |
| September 2025 | 0 | 0 | 720 | |
| October 2025 | 0 | 0 | 744 | |
| November 2025 | 0 | 0 | 720 | |
| December 2025 | 0 | 0 | 744 | |
| January 2026 | 0 | 0 | 744 | |
| February 2026 | 0 | 0 | 672 | |
| March 2026 | 0 | 0 | 744 | |
| April 2026 | 0 | 0 | 720 | |
| May 2026 | 56 | 56 | 744 | |
| June 2026 | 59 | 59 | 720 | |
| July 2026 | 0 | 0 | 744 | |
| August 2026 | 0 | 0 | 744 | |
| September 2026 | 0 | 0 | 720 | |
| October 2026 | 0 | 0 | 744 | |
| November 2026 | 0 | 0 | 37 |
Days with a reported discharge per month
A day counts when any counted discharge was under way on it, from its start to its reported end in Eastern Time; a report with no end counts its start day.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 1, 2022 to November 2, 2026.
Show table
| Month | Days with a reported discharge | Coverage |
|---|---|---|
| January 2022 | 0 | |
| February 2022 | 1 | |
| March 2022 | 0 | |
| April 2022 | 0 | |
| May 2022 | 1 | |
| June 2022 | 0 | |
| July 2022 | 1 | |
| August 2022 | 0 | |
| September 2022 | 0 | |
| October 2022 | 0 | |
| November 2022 | 0 | |
| December 2022 | 0 | |
| January 2023 | 1 | |
| February 2023 | 0 | |
| March 2023 | 0 | |
| April 2023 | 0 | |
| May 2023 | 0 | |
| June 2023 | 0 | |
| July 2023 | 5 | |
| August 2023 | 0 | |
| September 2023 | 0 | |
| October 2023 | 0 | |
| November 2023 | 0 | |
| December 2023 | 2 | |
| January 2024 | 2 | |
| February 2024 | 0 | |
| March 2024 | 4 | |
| April 2024 | 0 | |
| May 2024 | 0 | |
| June 2024 | 1 | |
| July 2024 | 0 | |
| August 2024 | 0 | |
| September 2024 | 0 | |
| October 2024 | 0 | |
| November 2024 | 0 | |
| December 2024 | 1 | |
| January 2025 | 0 | |
| February 2025 | 0 | |
| March 2025 | 2 | |
| April 2025 | 0 | |
| May 2025 | 3 | |
| June 2025 | 0 | |
| July 2025 | 0 | |
| August 2025 | 0 | |
| September 2025 | 0 | |
| October 2025 | 0 | |
| November 2025 | 0 | |
| December 2025 | 0 | |
| January 2026 | 0 | |
| February 2026 | 0 | |
| March 2026 | 0 | |
| April 2026 | 0 | |
| May 2026 | 1 | |
| June 2026 | 1 | |
| July 2026 | 1 | |
| August 2026 | 0 | |
| September 2026 | 0 | |
| October 2026 | 0 | |
| November 2026 | 0 |
Reported discharges per year, 2016 to 2026
34 reported discharges, 2016 to 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- Incomplete source coverage
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Year | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Coverage |
|---|---|---|---|---|---|
| 2016 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2017 | 0 | 0 | 0 | 0 | |
| 2018 | 0 | 2 | 4 | 6 | |
| 2019 | 0 | 0 | 4 | 4 | |
| 2020 | 0 | 0 | 0 | 0 | |
| 2021 | 0 | 0 | 1 | 1 | |
| 2022 | 0 | 1 | 2 | 3 | |
| 2023 | 2 | 0 | 4 | 6 | |
| 2024 | 0 | 0 | 7 | 7 | |
| 2025 | 0 | 0 | 3 | 3 | |
| 2026 | 0 | 0 | 4 | 4 |
Reported volume per year
Gallons (axis: K thousand, M million), summed from the 9 reports that gave a volume as a number (25 did not).
- Incomplete source coverage
25 of 34 discharge reports gave no volume as a number (23 gave a range); only numbers are summed. Vermont gave volumes as ranges before 2024 (">10,000 to 100,000 gallons"); those records have no single number and are not summed.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Year | Reported volume, gallons | Reports with a volume | Reports without a volume | Coverage |
|---|---|---|---|---|
| 2016 | 0 | 0 | 0 | Incomplete source coverage |
| 2017 | 0 | 0 | 0 | |
| 2018 | 0 | 0 | 6 | |
| 2019 | 0 | 0 | 4 | |
| 2020 | 0 | 0 | 0 | |
| 2021 | 0 | 0 | 1 | |
| 2022 | 0 | 0 | 3 | |
| 2023 | 0 | 0 | 6 | |
| 2024 | 1,030,000 | 2 | 5 | |
| 2025 | 5,010,000 | 3 | 0 | |
| 2026 | 560,000 | 4 | 0 |
Hours with a discharge or advisory status per year
Hours with a discharge or advisory status each year under DirtyWaterWatch rules; 2026 to date.
- Discharge or advisory reported
- Incomplete source coverage
8 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Year | Hours with a discharge or advisory status | Share of the year | Coverage |
|---|---|---|---|
| 2016 | 0 | 0.0% | Incomplete source coverage |
| 2017 | 0 | 0.0% | |
| 2018 | 572 | 6.5% | |
| 2019 | 293 | 3.3% | |
| 2020 | 0 | 0.0% | |
| 2021 | 48 | 0.5% | |
| 2022 | 153 | 1.7% | |
| 2023 | 255 | 2.9% | |
| 2024 | 309 | 3.5% | |
| 2025 | 158 | 1.8% | |
| 2026 | 115 | 1.6% |
Reported discharges by calendar month, all years
Every counted discharge report, by the calendar month it began.
Months are summed over every year a tracked source covers; the table gives the number of years behind each month.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Month | Reported discharges | Years of records |
|---|---|---|
| January | 4 | 11 |
| February | 2 | 11 |
| March | 6 | 11 |
| April | 2 | 11 |
| May | 4 | 11 |
| June | 4 | 11 |
| July | 6 | 11 |
| August | 1 | 11 |
| September | 0 | 11 |
| October | 1 | 11 |
| November | 1 | 11 |
| December | 3 | 10 |
Reported discharges by wastewater outlet
Wastewater outlets with the most tracked discharge records: 10 of 22, all years. Counts depend on reporting coverage and do not measure legal compliance or harm.
Source: Vermont Department of Environmental Conservation sewage overflow page. Records cover January 5, 2016 to November 2, 2026.
Show table
| Wastewater outlet | Reported discharges |
|---|---|
| Wastewater Plant | 7 |
| WWTP | 4 |
| Effluent outfall | 2 |
| WWTF effluent outfall | 2 |
| Wastewater plant outfall | 2 |
| WW oufall | 1 |
| WWTF | 1 |
| Outfall | 1 |
| Brandon Wastewater Plant | 1 |
| WWTP outfall | 1 |
| Other outlets (12) | 12 |
How these charts are counted
We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow this site's rules. Shaded gaps mean missing coverage, not zero discharges.
- Vermont Department of Environmental Conservation sewage overflow page: records from January 5, 2016 to the latest update
Reports linked to Neshobe River
| Start | End | Sewer operator | Outlet | Type | Volume | Source | Links |
|---|---|---|---|---|---|---|---|
| start not reported (reported Jul 15, 2026, 2:50 PM EDT) | end not reported | Brandon | effluent outfall | Report not fully read | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4274, reported Jul 15, 2026, 2:50 PM EDT, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Report not fully read, Brandon, start not reported (reported Jul 15, 2026, 2:50 PM EDT) · Map |
| start not reported (reported Jul 10, 2026, 12:57 PM EDT) | end not reported | Brandon | Effluent tank | Report not fully readEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4272, reported Jul 10, 2026, 12:57 PM EDT, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Report not fully read, Brandon, start not reported (reported Jul 10, 2026, 12:57 PM EDT) · Map |
| Jul 10, 2026, 10:30 AM EDT | Jul 10, 2026, 11:00 AM EDT | Brandon | Effluent outfall | Report not fully read | 10,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7071, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Report not fully read, Brandon, Jul 10, 2026, 10:30 AM EDT · Map |
| start not reported (reported Jun 17, 2026, 10:07 AM EDT) | end not reported | Brandon | WWTF outfall | Treatment bypassEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4256, reported Jun 17, 2026, 10:07 AM EDT, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Treatment bypass, Brandon, start not reported (reported Jun 17, 2026, 10:07 AM EDT) · Map |
| Jun 16, 2026 | end not reported | Brandon | Effluent outfall | Treatment plant bypass | 250,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7061, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Treatment plant bypass, Brandon, Jun 16, 2026 · Map |
| Jun 16, 2026, 12:00 AM EDT | Jun 16, 2026, 11:00 AM EDT | Brandon | WWTF effluent outfall | Treatment plant bypass | 200,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7059, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Treatment plant bypass, Brandon, Jun 16, 2026, 12:00 AM EDT · Map |
| May 28, 2026, 12:00 AM EDT | May 28, 2026, 8:20 AM EDT | Brandon | WW oufall | Treatment plant bypass | 100,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:7038, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Read report: Treatment plant bypass, Brandon, May 28, 2026, 12:00 AM EDT · Map |
| start not reported (reported May 10, 2025, 9:26 AM EDT) | end not reported | Brandon | WWTF effluent outfall | Treatment bypassEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4125, reported May 10, 2025, 9:26 AM EDT, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 10, 2025, 12:00 AM EDT | May 12, 2025, 12:00 PM EDT | Brandon | WWTF effluent outfall | Treatment plant bypass | 4 million gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6799, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Mar 6, 2025, 6:22 PM EST) | end not reported | Brandon | WWTF Effluent outfall | Treatment bypassEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4097, reported Mar 6, 2025, 6:22 PM EST, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2025, 6:00 PM EST | Mar 7, 2025, 8:00 PM EST | Brandon | WWTF | Report not fully read | 1 million gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6771, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Mar 6, 2025, 12:13 PM EST) | end not reported | Brandon | Outfall | Report not fully readEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4095, reported Mar 6, 2025, 12:13 PM EST, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2025, 8:00 AM EST | Mar 6, 2025, 10:00 AM EST | Brandon | Outfall | Treatment plant bypass | 10,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6738, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Dec 12, 2024, 7:48 AM EST) | end not reported | Brandon | WWTF effluent outfall | Treatment bypassEarlier version | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4090, reported Dec 12, 2024, 7:48 AM EST, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 11, 2024 | Dec 12, 2024 | Brandon | WWTP | Treatment plant bypass | 1 million gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6731, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Jun 15, 2024, 1:40 PM EDT) | end not reported | Brandon | outfall at wastewater plant on 6-13-2024 from approximately 12 midnite till 830 am approximately 30,000 gallons of treated wastewater with partial disinfection caused by low flow that caused chemical pump to pump to slow resulting in partial chlorination. chemicals turned up and today low flow chemical booster consisting of several cement blocks under flow sensor. stephen cijka chief operator 802 2476730 | Report not fully read | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:4007, reported Jun 15, 2024, 1:40 PM EDT, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 13, 2024, 12:00 AM EDT | Jun 13, 2024, 8:30 AM EDT | Brandon | Wastewater Plant | Treatment plant bypass | 30,000 gallons | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6528, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 18, 2024 | end not reported | Brandon | Wastewater Plant | Treatment plant bypass | “>500,000 to 1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6494, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 14, 2024, 11:00 AM EDT | Mar 15, 2024, 11:00 AM EDT | Brandon | Brandon Wastewater Plant | Treatment plant bypass | “>100 to 1,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6495, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 14, 2024, 6:55 AM EDT | Mar 14, 2024, 11:00 AM EDT | Brandon | Wastewater Plant | Treatment plant bypass | “>100,000 to 500,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6493, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 7, 2024 | end not reported | Brandon | Wastewater Plant | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6485, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 4, 2024, 6:10 AM EST | Jan 5, 2024, 2:50 PM EST | Brandon | wastewater plant | Treatment plant bypass | “>500,000 to 1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6464, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 18, 2023, 3:00 PM EST | Dec 19, 2023, 7:00 AM EST | Brandon | WWTP outfall | Treatment plant bypass | “>500,000 to 1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6461, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 17, 2023, 2:15 AM EDT | Jul 17, 2023, 3:30 PM EDT | Brandon | Wastewater Plant | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6332, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 14, 2023, 9:15 PM EDT | Jul 15, 2023, 1:37 PM EDT | Brandon | Brandon water pollution control plant | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6337, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 10, 2023, 5:00 PM EDT | Jul 11, 2023, 9:43 PM EDT | Brandon | outfall at brandon wastewater to neshobe river | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6334, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Jan 13, 2023, 2:07 PM EST) | end not reported | Brandon | Brandon waste water treatment plant is at normal operating condition. Previous post for "CSO" was incorrect., should have been "partially untreated discharge" to receiving waters | Combined sewer overflow (CSO) | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2852, reported Jan 13, 2023, 2:07 PM EST, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| start not reported (reported Jan 13, 2023, 12:19 PM EST) | end not reported | Brandon | 1.13.23 12pm CSO from treatment plant discharge. High flows from rain,infiltration to collection system. Chemical additions made, aeration to tanks shut off to hold solids | Combined sewer overflow (CSO) | volume not reported | Brandon (operator public alert on the VT DEC Sewage Overflows page; not yet reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record alert:2851, reported Jan 13, 2023, 12:19 PM EST, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 21, 2022, 7:17 AM EDT | Jul 21, 2022, 8:35 AM EDT | Brandon | Wastewater Plant Chlorine Dosing Tubing | Treatment plant bypass | “>10,000 to 100,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6191, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 17, 2022, 5:30 AM EDT | May 17, 2022, 11:00 AM EDT | Brandon | 500 Union Street Wastewater Effluent | Treatment plant bypass | “>100,000 to 500,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6168, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Feb 18, 2022, 5:00 AM EST | Feb 18, 2022, 7:00 AM EST | Brandon | Wastewater Plant | Sanitary sewer overflow (SSO) | “>100,000 to 500,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6121, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 15, 2021, 7:05 AM EDT | Jul 15, 2021, 7:05 AM EDT | Brandon | Effluent | Treatment plant bypass | “Under 100 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:6008, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Nov 1, 2019 | Nov 1, 2019 | Brandon | WWTP | Treatment plant bypass | “>500,000 to 1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4793, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 17, 2019, 12:55 PM EDT | Oct 18, 2019, 5:55 AM EDT | Brandon | Neshobe River at outfall of wastewater plant | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4755, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jun 20, 2019, 8:00 PM EDT | Jun 21, 2019, 2:00 PM EDT | Brandon | WWTP | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4644, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 24, 2019, 8:30 AM EST | Jan 26, 2019, 2:30 AM EST | Brandon | Wastewater plant outfall | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4536, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 22, 2018, 11:30 AM EST | Dec 23, 2018, 11:30 AM EST | Brandon | WWTP | Report not fully read | “>500,000 to 1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4519, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 9, 2018, 7:30 AM EDT | Aug 10, 2018, 1:50 PM EDT | Brandon | Wastewater Plant Outfall | Treatment plant bypass | “>100,000 to 500,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4441, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 4, 2018, 8:30 PM EDT | May 4, 2018, 9:30 PM EDT | Brandon | 500 union street | Treatment plant bypass | “>10,000 to 100,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4364, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 4, 2018, 3:15 PM EDT | Apr 5, 2018, 7:15 PM EDT | Brandon | Bottom land Mill Street and Conant Square next to Neshobe River | Sanitary sewer overflow (SSO) | “>100,000 to 500,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4350, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 4, 2018, 3:15 PM EDT | Apr 5, 2018, 7:15 PM EDT | Brandon | Wastewater Effluent at 500 Union Street | Treatment plant bypass | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4351, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Feb 22, 2018, 3:15 AM EST | Mar 7, 2018, 12:00 PM EST | Brandon | Bottom land between Mill Lane and Conant Square | Sanitary sewer overflow (SSO) | “>1,000,000 gallons” | Brandon (incident report on the VT DEC Sewage Overflows page; reviewed by DEC) via VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page, record incident:4347, the source gives no report time, retrieved 2026-11-02 10:55 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
Wastewater outlets on this water
Outfall: a pipe or outlet where wastewater enters a water body.
No wastewater outlet in our records is linked to this water.
Boat launches
No public boat launch is listed in our records for this water.
Sources covering this water
- VT DEC Public Alerts (untreated discharge alerts) on the Sewage Overflows report page · Latest check succeeded · Last successful check: 2026-11-02 17:12 UTC
42 records linked to this water. Updated Nov 2, 2026, 12:13 PM EST.