Connecticut / Waters /
Piper Brook
Stream in Connecticut · near New Britain, Newington, West Hartford
Current status
This badge describes the water outline. Check the downstream stretches below for discharge statuses.
No current status is assigned to this water outline. Check the water page for reports and any estimated downstream stretches.
Why this status: No current status: no report we track sets a status on this water outline now.
How long each status lasts, and why
Sources checked: CT DEEP CSO/SSO Performance Dashboard (QScend) (last successful check 2026-11-02 15:52 UTC); CT DEEP Sewage Right-to-Know annual report 2024 (last successful check 2026-11-02 15:54 UTC); CT DEEP reporting archive 2016-2021 (last successful check 2026-11-02 15:54 UTC). Status by DirtyWaterWatch, updated 2026-11-02 16:21 UTC.
No status does not mean the water is safe. Follow posted signs and local health advice.
Updated Nov 2, 2026, 11:21 AM EST.
Check The Metropolitan District (MDC) - Hartford Water Pollution Control Facility and combined sewer system's notices · Bookmark this water page and check it before each trip · Report a missing notice or error
Map
Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Estimated downstream stretches on Piper Brook
No downstream stretch has a current status here as of Nov 2, 2026, 11:21 AM EST. Check the reports below.
The last 90 days
- Caution: Oct 14, 2026, 1:00 AM EDT to Oct 15, 2026, 1:00 AM EDT · from report 1
- Discharge or advisory reported: Oct 11, 2026, 10:00 PM EDT to Oct 14, 2026, 1:00 AM EDT · from report 1
- Caution: Sep 30, 2026, 11:00 PM EDT to Oct 1, 2026, 11:00 PM EDT · from report 1
- Discharge or advisory reported: Sep 28, 2026, 10:00 AM EDT to Sep 30, 2026, 11:00 PM EDT · from report 1
- Caution: Aug 6, 2026, 1:00 AM EDT to Aug 7, 2026, 1:00 AM EDT · from report 1
- Discharge or advisory reported: Aug 4, 2026, 1:00 PM EDT to Aug 6, 2026, 1:00 AM EDT · from report 1
Source: DirtyWaterWatch calculations using the reports linked above and the published status rules. Updated 2026-11-02 16:21 UTC.
Reported discharges over time
- Discharge events, last 12 months7Dec 2025 to Nov 2026
- Days with a discharge, last 12 months16Dec 2025 to Nov 2026
- Hours under advisory, last 12 months543Dec 2025 to Nov 2026
- 2026 season under advisory3.8%May to October; 168 h
Discharge events per month
48 events, Jan 2022 to Nov 2026. Counted from 41 verified or annual reports, 7 public notices.
- Combined sewer overflow
- Sanitary sewer overflow
- Bypass, blended or other
CT DEEP dashboard records begin 2021-12-02; where CT DEEP's annual report covers a discharger's month, the annual report is counted instead. CT DEEP annual reports (Sewage Right-to-Know) cover 2021-01-01 to 2026-11-02.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports. Covered 2022-01-01 to 2026-11-02.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| Jan 2022 | 0 | 0 | 0 | 0 | ||
| Feb 2022 | 0 | 2 | 0 | 2 | Verified or annual reports | |
| Mar 2022 | 0 | 1 | 0 | 1 | Verified or annual reports | |
| Apr 2022 | 0 | 2 | 0 | 2 | Verified or annual reports | |
| May 2022 | 0 | 0 | 0 | 0 | ||
| Jun 2022 | 0 | 0 | 0 | 0 | ||
| Jul 2022 | 0 | 0 | 0 | 0 | ||
| Aug 2022 | 0 | 0 | 0 | 0 | ||
| Sep 2022 | 0 | 1 | 0 | 1 | Verified or annual reports | |
| Oct 2022 | 0 | 0 | 0 | 0 | ||
| Nov 2022 | 0 | 0 | 0 | 0 | ||
| Dec 2022 | 0 | 0 | 0 | 0 | ||
| Jan 2023 | 0 | 3 | 0 | 3 | Verified or annual reports | |
| Feb 2023 | 0 | 0 | 0 | 0 | ||
| Mar 2023 | 0 | 2 | 0 | 2 | Verified or annual reports | |
| Apr 2023 | 0 | 2 | 0 | 2 | Verified or annual reports | |
| May 2023 | 0 | 1 | 0 | 1 | Verified or annual reports | |
| Jun 2023 | 0 | 0 | 0 | 0 | ||
| Jul 2023 | 0 | 4 | 0 | 4 | Verified or annual reports | |
| Aug 2023 | 0 | 1 | 0 | 1 | Verified or annual reports | |
| Sep 2023 | 0 | 5 | 0 | 5 | Verified or annual reports | |
| Oct 2023 | 0 | 0 | 0 | 0 | ||
| Nov 2023 | 0 | 0 | 0 | 0 | ||
| Dec 2023 | 0 | 4 | 0 | 4 | Verified or annual reports | |
| Jan 2024 | 0 | 3 | 0 | 3 | Verified or annual reports | |
| Feb 2024 | 0 | 0 | 0 | 0 | ||
| Mar 2024 | 0 | 4 | 0 | 4 | Verified or annual reports | |
| Apr 2024 | 0 | 3 | 0 | 3 | Verified or annual reports | |
| May 2024 | 0 | 0 | 0 | 0 | ||
| Jun 2024 | 0 | 0 | 0 | 0 | ||
| Jul 2024 | 0 | 0 | 0 | 0 | ||
| Aug 2024 | 0 | 1 | 0 | 1 | Verified or annual reports | |
| Sep 2024 | 0 | 0 | 0 | 0 | ||
| Oct 2024 | 0 | 0 | 0 | 0 | ||
| Nov 2024 | 0 | 0 | 0 | 0 | ||
| Dec 2024 | 0 | 0 | 0 | 0 | ||
| Jan 2025 | 0 | 0 | 0 | 0 | ||
| Feb 2025 | 0 | 0 | 0 | 0 | ||
| Mar 2025 | 0 | 2 | 0 | 2 | Verified or annual reports | |
| Apr 2025 | 0 | 0 | 0 | 0 | ||
| May 2025 | 0 | 0 | 0 | 0 | ||
| Jun 2025 | 0 | 0 | 0 | 0 | ||
| Jul 2025 | 0 | 0 | 0 | 0 | ||
| Aug 2025 | 0 | 0 | 0 | 0 | ||
| Sep 2025 | 0 | 0 | 0 | 0 | ||
| Oct 2025 | 0 | 0 | 0 | 0 | ||
| Nov 2025 | 0 | 0 | 0 | 0 | ||
| Dec 2025 | 0 | 0 | 0 | 0 | ||
| Jan 2026 | 0 | 0 | 0 | 0 | ||
| Feb 2026 | 0 | 0 | 0 | 0 | ||
| Mar 2026 | 0 | 4 | 0 | 4 | Public notices (no report yet) | |
| Apr 2026 | 0 | 0 | 0 | 0 | ||
| May 2026 | 0 | 0 | 0 | 0 | ||
| Jun 2026 | 0 | 0 | 0 | 0 | ||
| Jul 2026 | 0 | 1 | 0 | 1 | Public notices (no report yet) | |
| Aug 2026 | 0 | 1 | 0 | 1 | Public notices (no report yet) | |
| Sep 2026 | 0 | 0 | 0 | 0 | ||
| Oct 2026 | 0 | 1 | 0 | 1 | Public notices (no report yet) | |
| Nov 2026 | 0 | 0 | 0 | 0 |
Hours under advisory per month
Hours this water was under an advisory, by the map's red rules.
- Advisory in effect
34 discharge events have no reported end and no ongoing status; under the status rules they set caution, not an advisory, and add no hours here. CT DEEP dashboard records begin 2021-12-02; where CT DEEP's annual report covers a discharger's month, the annual report is counted instead. CT DEEP annual reports (Sewage Right-to-Know) cover 2021-01-01 to 2026-11-02. CT DEEP's reporting archive runs 2016-07-04 to 2021-12-02.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Month | Hours under advisory | From discharge windows | Hours in month | Coverage |
|---|---|---|---|---|
| Jan 2022 | 0 | 0 | 744 | |
| Feb 2022 | 113 | 113 | 672 | |
| Mar 2022 | 69 | 69 | 744 | |
| Apr 2022 | 164 | 164 | 720 | |
| May 2022 | 0 | 0 | 744 | |
| Jun 2022 | 0 | 0 | 720 | |
| Jul 2022 | 0 | 0 | 744 | |
| Aug 2022 | 0 | 0 | 744 | |
| Sep 2022 | 56 | 56 | 720 | |
| Oct 2022 | 0 | 0 | 744 | |
| Nov 2022 | 0 | 0 | 720 | |
| Dec 2022 | 0 | 0 | 744 | |
| Jan 2023 | 228 | 228 | 744 | |
| Feb 2023 | 0 | 0 | 672 | |
| Mar 2023 | 150 | 150 | 744 | |
| Apr 2023 | 75 | 75 | 720 | |
| May 2023 | 121 | 121 | 744 | |
| Jun 2023 | 0 | 0 | 720 | |
| Jul 2023 | 186 | 186 | 744 | |
| Aug 2023 | 54 | 54 | 744 | |
| Sep 2023 | 397 | 397 | 720 | |
| Oct 2023 | 111 | 111 | 744 | |
| Nov 2023 | 0 | 0 | 720 | |
| Dec 2023 | 285 | 285 | 744 | |
| Jan 2024 | 354 | 354 | 744 | |
| Feb 2024 | 24 | 24 | 696 | |
| Mar 2024 | 436 | 436 | 744 | |
| Apr 2024 | 236 | 236 | 720 | |
| May 2024 | 0 | 0 | 744 | |
| Jun 2024 | 0 | 0 | 720 | |
| Jul 2024 | 0 | 0 | 744 | |
| Aug 2024 | 100 | 100 | 744 | |
| Sep 2024 | 0 | 0 | 720 | |
| Oct 2024 | 0 | 0 | 744 | |
| Nov 2024 | 0 | 0 | 720 | |
| Dec 2024 | 0 | 0 | 744 | |
| Jan 2025 | 0 | 0 | 744 | |
| Feb 2025 | 0 | 0 | 672 | |
| Mar 2025 | 72 | 72 | 744 | |
| Apr 2025 | 0 | 0 | 720 | |
| May 2025 | 0 | 0 | 744 | |
| Jun 2025 | 0 | 0 | 720 | |
| Jul 2025 | 0 | 0 | 744 | |
| Aug 2025 | 0 | 0 | 744 | |
| Sep 2025 | 0 | 0 | 720 | |
| Oct 2025 | 0 | 0 | 744 | |
| Nov 2025 | 0 | 0 | 720 | |
| Dec 2025 | 0 | 0 | 744 | |
| Jan 2026 | 0 | 0 | 744 | |
| Feb 2026 | 0 | 0 | 672 | |
| Mar 2026 | 375 | 375 | 744 | |
| Apr 2026 | 0 | 0 | 720 | |
| May 2026 | 0 | 0 | 744 | |
| Jun 2026 | 0 | 0 | 720 | |
| Jul 2026 | 52 | 52 | 744 | |
| Aug 2026 | 66 | 66 | 744 | |
| Sep 2026 | 0 | 0 | 720 | |
| Oct 2026 | 51 | 51 | 744 | |
| Nov 2026 | 0 | 0 | 36 |
Days with a discharge per month
A day counts when any counted discharge was under way on it (start to reported end, local time); an event with no end counts its start day.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports. Covered 2022-01-01 to 2026-11-02.
Show table
| Month | Days with a discharge | Coverage |
|---|---|---|
| Jan 2022 | 0 | |
| Feb 2022 | 3 | |
| Mar 2022 | 1 | |
| Apr 2022 | 5 | |
| May 2022 | 0 | |
| Jun 2022 | 0 | |
| Jul 2022 | 0 | |
| Aug 2022 | 0 | |
| Sep 2022 | 1 | |
| Oct 2022 | 0 | |
| Nov 2022 | 0 | |
| Dec 2022 | 0 | |
| Jan 2023 | 7 | |
| Feb 2023 | 0 | |
| Mar 2023 | 3 | |
| Apr 2023 | 2 | |
| May 2023 | 3 | |
| Jun 2023 | 0 | |
| Jul 2023 | 5 | |
| Aug 2023 | 1 | |
| Sep 2023 | 13 | |
| Oct 2023 | 3 | |
| Nov 2023 | 0 | |
| Dec 2023 | 8 | |
| Jan 2024 | 13 | |
| Feb 2024 | 0 | |
| Mar 2024 | 15 | |
| Apr 2024 | 6 | |
| May 2024 | 0 | |
| Jun 2024 | 0 | |
| Jul 2024 | 0 | |
| Aug 2024 | 3 | |
| Sep 2024 | 0 | |
| Oct 2024 | 0 | |
| Nov 2024 | 0 | |
| Dec 2024 | 0 | |
| Jan 2025 | 0 | |
| Feb 2025 | 0 | |
| Mar 2025 | 2 | |
| Apr 2025 | 0 | |
| May 2025 | 0 | |
| Jun 2025 | 0 | |
| Jul 2025 | 0 | |
| Aug 2025 | 0 | |
| Sep 2025 | 0 | |
| Oct 2025 | 0 | |
| Nov 2025 | 0 | |
| Dec 2025 | 0 | |
| Jan 2026 | 0 | |
| Feb 2026 | 0 | |
| Mar 2026 | 11 | |
| Apr 2026 | 0 | |
| May 2026 | 0 | |
| Jun 2026 | 0 | |
| Jul 2026 | 1 | |
| Aug 2026 | 2 | |
| Sep 2026 | 0 | |
| Oct 2026 | 2 | |
| Nov 2026 | 0 |
Discharge events per year, 2016 to 2026
164 events, 2016 to 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Bypass, blended or other
- Partly covered or sparse source
CT DEEP dashboard records begin 2021-12-02; where CT DEEP's annual report covers a discharger's month, the annual report is counted instead. CT DEEP annual reports (Sewage Right-to-Know) cover 2021-01-01 to 2026-11-02. CT DEEP's reporting archive runs 2016-07-04 to 2021-12-02.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Year | Combined sewer overflow | Sanitary sewer overflow | Bypass, blended or other | Total | Coverage |
|---|---|---|---|---|---|
| 2016 | 0 | 0 | 0 | 0 | Partly covered or sparse source |
| 2017 | 0 | 0 | 0 | 0 | |
| 2018 | 0 | 17 | 0 | 17 | |
| 2019 | 0 | 18 | 0 | 18 | |
| 2020 | 0 | 30 | 0 | 30 | |
| 2021 | 0 | 51 | 0 | 51 | Partly covered or sparse source |
| 2022 | 0 | 6 | 0 | 6 | |
| 2023 | 0 | 22 | 0 | 22 | |
| 2024 | 0 | 11 | 0 | 11 | |
| 2025 | 0 | 2 | 0 | 2 | |
| 2026 | 0 | 7 | 0 | 7 |
Reported volume per year
Gallons, summed from the 117 events that gave a number (47 did not).
- Partly covered or sparse source
47 of 164 events gave no volume as a number (12 gave a range); only numbers are summed. CT DEEP's 2016-2021 archive gives volumes as ranges ("20,001 - 50,000 gallons"); they are not summed.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Year | Gallons | Events with a number | Events without | Coverage |
|---|---|---|---|---|
| 2016 | 0 | 0 | 0 | Partly covered or sparse source |
| 2017 | 0 | 0 | 0 | |
| 2018 | 65,031,015 | 13 | 4 | |
| 2019 | 83,847,760 | 16 | 2 | |
| 2020 | 39,234,009 | 11 | 19 | |
| 2021 | 114,522,642 | 29 | 22 | Partly covered or sparse source |
| 2022 | 15,022,000 | 6 | 0 | |
| 2023 | 192,570,075 | 22 | 0 | |
| 2024 | 129,015,850 | 11 | 0 | |
| 2025 | 11,200,000 | 2 | 0 | |
| 2026 | 19,275,009 | 7 | 0 |
Hours under advisory per year
Hours under advisory each year; 2026 to date.
- Advisory in effect
- Partly covered or sparse source
34 discharge events have no reported end and no ongoing status; under the status rules they set caution, not an advisory, and add no hours here.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Year | Hours under advisory | Share of the year | Coverage |
|---|---|---|---|
| 2016 | 0 | 0.0% | Partly covered or sparse source |
| 2017 | 0 | 0.0% | |
| 2018 | 1,053 | 12.0% | |
| 2019 | 1,906 | 21.8% | |
| 2020 | 856 | 9.7% | |
| 2021 | 753 | 8.6% | Partly covered or sparse source |
| 2022 | 401 | 4.6% | |
| 2023 | 1,606 | 18.3% | |
| 2024 | 1,149 | 13.1% | |
| 2025 | 72 | 0.8% | |
| 2026 | 543 | 7.4% |
Discharge events by calendar month, all years
Every counted discharge event, by the calendar month it began.
Months are summed over every year a source covers; the table gives the number of years behind each month.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Month | Events | Years of records |
|---|---|---|
| Jan | 15 | 10 |
| Feb | 5 | 10 |
| Mar | 19 | 10 |
| Apr | 19 | 10 |
| May | 10 | 10 |
| Jun | 0 | 10 |
| Jul | 10 | 11 |
| Aug | 21 | 11 |
| Sep | 23 | 11 |
| Oct | 6 | 11 |
| Nov | 10 | 11 |
| Dec | 26 | 10 |
Discharge events by outfall
The 10 outfalls with the most events of 70, all years.
CT DEEP dashboard records begin 2021-12-02; where CT DEEP's annual report covers a discharger's month, the annual report is counted instead. CT DEEP annual reports (Sewage Right-to-Know) cover 2021-01-01 to 2026-11-02. CT DEEP's reporting archive runs 2016-07-04 to 2021-12-02.
Sources: CT DEEP CSO/SSO dashboard; CT DEEP Sewage Right-to-Know annual reports; CT DEEP reporting archive 2016-2021. Covered 2016-07-04 to 2026-11-02.
Show table
| Outfall | Discharger | Events |
|---|---|---|
| Manhole, HILLCREST AVE | The Metropolitan District | 20 |
| Manhole, Hillcrest Ave - West Hartford | The Metropolitan District | 12 |
| Manhole, 115 Hillcrest Ave | The Metropolitan District | 12 |
| Sewer Main, 115 Hillcrest Ave, West Hartford, CT | MDC COLLECTIONS ONLY | 7 |
| Manhole, 115 Hillcrest Ave, West Hartford, CT | MDC COLLECTIONS ONLY | 6 |
| HILLCREST AVE | The Metropolitan District | 6 |
| HILLCREST AVE - WH | The Metropolitan District | 5 |
| Manhole, HILLCREST DR | The Metropolitan District | 5 |
| Manhole, Hillcrest Ave, West Hartford, CT | MDC COLLECTIONS ONLY | 4 |
| Basement, 106 main st newington | The Metropolitan District | 4 |
| Other outfalls (60) | 83 |
How these charts are counted
Discharge events are counted once: where a source publishes both public notices and verified reports (MassDEP, Vermont DEC), a discharger's month with any verified report counts its verified reports only, and other months count notices. Revisions are folded into the record they revise, and EPA copies of a state report are not counted twice. Monthly and yearly totals (Maine DEP, EPA discharge monitoring reports, Portsmouth) are shown on their own and never added to the event counts. Hours under advisory follow the map's red rules. A muted band marks periods no source covers: a gap there is missing data, not a quiet month.
- CT DEEP CSO/SSO dashboard: 2021-12-02 to now
- CT DEEP Sewage Right-to-Know annual reports: 2021-01-01 to now
- CT DEEP reporting archive 2016-2021: 2016-07-04 to 2021-12-02
Reports linked to Piper Brook
| Start | End | Sewer operator | Outlet | Type | Volume | Source | Links |
|---|---|---|---|---|---|---|---|
| Oct 11, 2026, 10:15 PM EDT | Oct 12, 2026, 12:45 AM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 132,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11590, the source gives no report time, retrieved 2026-11-02 15:52 UTC · Read the original notice | Read report: Sanitary sewer overflow (SSO), MDC COLLECTIONS ONLY, Oct 11, 2026, 10:15 PM EDT · Map |
| Sep 28, 2026, 10:15 AM EDT | Sep 28, 2026, 10:15 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 2.22 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11553, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Read report: Sanitary sewer overflow (SSO), MDC COLLECTIONS ONLY, Sep 28, 2026, 10:15 AM EDT · Map |
| Aug 3, 2026, 7:00 AM EDT | Aug 4, 2026, 1:00 AM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 6.05 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11142, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Read report: Sanitary sewer overflow (SSO), MDC COLLECTIONS ONLY, Aug 3, 2026, 7:00 AM EDT · Map |
| Jul 29, 2026, 7:45 PM EDT | Jul 29, 2026, 11:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 328,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 11099, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Read report: Sanitary sewer overflow (SSO), MDC COLLECTIONS ONLY, Jul 29, 2026, 7:45 PM EDT · Map |
| Mar 23, 2026, 6:00 AM EDT | Mar 23, 2026, 11:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 3.33 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10500, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 16, 2026, 10:30 AM EDT | Mar 18, 2026, 12:00 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 9 gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10437, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 12, 2026, 3:30 AM EDT | Mar 12, 2026, 11:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 2.83 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10402, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 5, 2026, 11:00 PM EST | Mar 10, 2026, 12:00 AM EDT | MDC COLLECTIONS ONLY | Manhole, Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 6.6 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10364, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 31, 2025, 4:45 AM EDT | Oct 31, 2025, 6:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 17,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 10088-2, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 31, 2025, 4:45 AM EDT | Oct 31, 2025, 6:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 17,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 10088, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 31, 2025, 4:45 AM EDT | Oct 31, 2025, 6:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 17,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 10088, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 9, 2025, 2:00 PM EDT | May 11, 2025, 2:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 9.13 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9507-2, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 9, 2025, 2:00 PM EDT | May 11, 2025, 2:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 9.13 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9507, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 9, 2025, 2:00 PM EDT | May 11, 2025, 2:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 9.13 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 9507, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 6, 2025, 3:00 AM EDT | May 7, 2025, 2:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 6.46 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9463-2, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 6, 2025, 3:00 AM EDT | May 7, 2025, 2:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO)Duplicate | 6.46 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9463, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 6, 2025, 3:00 AM EDT | May 7, 2025, 2:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 6.46 million gallons | MDC COLLECTIONS ONLY (CT DEEP Performance Dashboard) via CT DEEP CSO/SSO Performance Dashboard (QScend), record 9463, the source gives no report time, retrieved 2026-11-02 11:20 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 5, 2025, 10:15 PM EST | Mar 6, 2025, 10:30 PM EST | MDC COLLECTIONS ONLY | Manhole, 83 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 5.6 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9170-2, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 5, 2025, 10:15 PM EST | Mar 6, 2025, 10:30 PM EST | MDC COLLECTIONS ONLY | Manhole, 83 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 5.6 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2026) via CT DEEP Sewage Right-to-Know annual report 2024, record 9170, published Feb 25, 2026, 4:08 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 19, 2024, 9:45 AM EDT | Aug 21, 2024, 2:00 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 1 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x24554497882d, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 18, 2024, 1:15 PM EDT | Apr 18, 2024, 6:15 PM EDT | MDC COLLECTIONS ONLY | Manhole, Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 302,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x26a81f2a351c, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 12, 2024, 4:45 AM EDT | Apr 12, 2024, 11:45 PM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 3.66 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x81dfb895c9a7, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 3, 2024, 6:00 PM EDT | Apr 6, 2024, 1:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 20.72 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xbc30fabe5367, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 28, 2024, 8:00 AM EDT | Mar 30, 2024, 12:15 AM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 1.79 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x72f223cbbc5c, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 23, 2024, 2:00 PM EDT | Mar 25, 2024, 1:15 AM EDT | MDC COLLECTIONS ONLY | Manhole, Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 11.31 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xec20afe4dc65, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 6, 2024, 7:00 PM EST | Mar 12, 2024, 11:45 PM EDT | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 38.24 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x3e20df2064d2, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 2, 2024, 8:15 PM EST | Mar 3, 2024, 5:00 PM EST | MDC COLLECTIONS ONLY | Manhole, 123 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 2.48 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x920e0e6edb27, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 26, 2024, 7:30 AM EST | Jan 30, 2024, 11:30 PM EST | MDC COLLECTIONS ONLY | Manhole, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 11.29 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xea357887cdd1, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 10, 2024, 10:00 AM EST | Jan 11, 2024, 7:00 AM EST | MDC COLLECTIONS ONLY | Manhole, 1 Jacobs Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 850 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record x65ec5ffe02d0, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 9, 2024, 9:45 PM EST | Jan 16, 2024, 11:00 PM EST | MDC COLLECTIONS ONLY | Manhole, 123 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 38.23 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2025) via CT DEEP Sewage Right-to-Know annual report 2024, record xbf21b1f2c26f, published Mar 31, 2025, 1:52 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 28, 2023, 6:00 AM EST | Dec 29, 2023, 11:30 PM EST | MDC COLLECTIONS ONLY | Manhole, 59 Chester St, East Hartford, CT | Sanitary sewer overflow (SSO) | 19.6 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x2b66507cd6b1, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 18, 2023, 1:30 PM EST | Dec 18, 2023, 2:30 PM EST | MDC COLLECTIONS ONLY | Pump Station, 136 Maple Ave, Hartford, CT | Sanitary sewer overflow (SSO) | 120,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x1ae3a5b672e1, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 18, 2023, 3:30 AM EST | Dec 20, 2023, 5:15 PM EST | MDC COLLECTIONS ONLY | Manhole, 43 Bolton St, Hartford, CT | Sanitary sewer overflow (SSO) | 18.12 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x2b4f7d1c9f76, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Dec 10, 2023, 10:30 PM EST | Dec 12, 2023, 12:00 PM EST | MDC COLLECTIONS ONLY | Sewer Main, 373 Granby St, Hartford, CT | Sanitary sewer overflow (SSO) | 10.16 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x2c8e6cc222b9, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 25, 2023, 3:00 AM EDT | Oct 3, 2023, 2:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 40 Welles Dr N, Newington, CT | Sanitary sewer overflow (SSO) | 60.13 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x7f47466372db, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 18, 2023, 9:30 PM EDT | Sep 19, 2023, 1:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 574 Maple Hill Ave, Newington, CT | Sanitary sewer overflow (SSO) | 2.83 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x7f4f67174bc4, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 13, 2023, 10:00 AM EDT | Sep 14, 2023, 10:45 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 25 Linbrook Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 9.13 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x59738b5fcc80, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 9, 2023, 8:00 PM EDT | Sep 10, 2023, 5:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, 186 Newington Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 1.45 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record xceaf1ccad018, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 4, 2023, 11:30 AM EDT | Sep 4, 2023, 1:30 PM EDT | MDC COLLECTIONS ONLY | Manhole, 32 Brian Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 75 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record xa7af92893817, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 18, 2023, 8:30 AM EDT | Aug 18, 2023, 2:15 PM EDT | MDC COLLECTIONS ONLY | Manhole, 200 Trout Brook Dr, West Hartford, CT | Sanitary sewer overflow (SSO) | 877,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x890119abf022, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 21, 2023, 4:15 PM EDT | Jul 21, 2023, 9:15 PM EDT | MDC COLLECTIONS ONLY | Manhole, 1 Fox Meadow Ln, West Hartford, CT | Sanitary sewer overflow (SSO) | 1.08 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x3ce4f8d530ef, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 16, 2023, 10:15 AM EDT | Jul 17, 2023, 12:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 212 Trout Brook Dr, West Hartford, CT | Sanitary sewer overflow (SSO) | 7.92 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x69ea4085fd94, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 16, 2023, 10:15 AM EDT | Jul 16, 2023, 10:15 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 115 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 3.07 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x52bece1d837b, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 4, 2023, 1:45 PM EDT | Jul 5, 2023, 12:30 AM EDT | MDC COLLECTIONS ONLY | Sewer Main, 35 Lostbrook Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 3.93 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record xc1ecc0dfba55, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 20, 2023, 9:45 PM EDT | May 20, 2023, 11:00 PM EDT | MDC COLLECTIONS ONLY | Manhole, Talcott Rd, West Hartford, CT | Sanitary sewer overflow (SSO) | 4,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x92a785a75743, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 30, 2023, 8:30 PM EDT | May 2, 2023, 12:00 AM EDT | MDC COLLECTIONS ONLY | Manhole, 212 Trout Brook Dr, West Hartford, CT | Sanitary sewer overflow (SSO) | 9.18 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x03a11d57bcf0, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 23, 2023, 12:00 AM EDT | Apr 23, 2023, 11:30 PM EDT | MDC COLLECTIONS ONLY | Sewer Main, 99 Shield St, West Hartford, CT | Sanitary sewer overflow (SSO) | 5.28 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x7299b13478b8, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 14, 2023, 3:00 AM EDT | Mar 15, 2023, 11:45 PM EDT | MDC COLLECTIONS ONLY | Manhole, 16 Stockade Cir, Wethersfield, CT | Sanitary sewer overflow (SSO) | 15.2 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x551f0cb79bf2, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 4, 2023, 12:15 PM EST | Mar 4, 2023, 9:45 PM EST | MDC COLLECTIONS ONLY | Manhole, 821 Folly Brook Blvd, Wethersfield, CT | Sanitary sewer overflow (SSO) | 840,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record xc3f24b1ff53c, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 25, 2023, 11:45 PM EST | Jan 28, 2023, 5:45 PM EST | MDC COLLECTIONS ONLY | Manhole, 128 Custer Dr, Windsor, CT | Sanitary sewer overflow (SSO) | 21.22 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x9b06a8254621, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 23, 2023, 9:00 AM EST | Jan 24, 2023, 1:00 AM EST | MDC COLLECTIONS ONLY | Sewer Main, 110 Rood Ave, Windsor, CT | Sanitary sewer overflow (SSO) | 2.35 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record xdca3603e520a, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jan 20, 2023, 12:15 AM EST | Jan 20, 2023, 3:00 AM EST | MDC COLLECTIONS ONLY | Manhole, 23 Green Manor Ave, Windsor, CT | Sanitary sewer overflow (SSO) | 85,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2024), record x1a2b79c5549f, published Jan 9, 2025, 2:55 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 6, 2022, 11:45 AM EDT | Sep 6, 2022, 7:15 PM EDT | MDC COLLECTIONS ONLY | Manhole, 711 N Mountain Rd, Newington, CT | Sanitary sewer overflow (SSO) | 9,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record xec7ad6c5cd9b, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 19, 2022, 4:15 AM EDT | Apr 20, 2022, 12:30 AM EDT | MDC COLLECTIONS ONLY | Manhole, Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 4.27 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record xd109265ef0c1, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 8, 2022, 1:00 AM EDT | Apr 10, 2022, 12:45 AM EDT | MDC COLLECTIONS ONLY | Manhole, 17 Steven St, West Hartford, CT | Sanitary sewer overflow (SSO) | 9.2 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record xf0ee12aad893, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Mar 25, 2022, 2:15 AM EDT | Mar 25, 2022, 10:45 PM EDT | MDC COLLECTIONS ONLY | Manhole, 67 Southwood Dr, West Hartford, CT | Sanitary sewer overflow (SSO) | 137,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x0bfc036924f3, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Feb 22, 2022, 11:00 PM EST | Feb 23, 2022, 12:30 AM EST | MDC COLLECTIONS ONLY | Manhole, 123 Hillcrest Ave, West Hartford, CT | Sanitary sewer overflow (SSO) | 65,000 gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x5ab8d921fbff, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Feb 4, 2022, 6:45 AM EST | Feb 4, 2022, 10:00 PM EST | MDC COLLECTIONS ONLY | Manhole, 711 N Mountain Rd, Newington, CT | Sanitary sewer overflow (SSO) | 1.34 million gallons | MDC COLLECTIONS ONLY (CT DEEP Sewage Right-to-Know annual report 2023) via CT DEEP Sewage Right-to-Know annual report 2024, record x8226f01aaa4c, published Jan 9, 2025, 2:54 PM EST, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 26, 2021, 1:37 PM EDT | Oct 26, 2021, 11:24 PM EDT | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | 868,000 gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x145a54992d81, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 26, 2021, 1:37 PM EDT | Oct 26, 2021, 11:24 PM EDT | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | 868,000 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963488, reported Oct 26, 2021, 1:51 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 26, 2021, 1:37 PM EDT | end not reported | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | “501 - 1,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963487, reported Oct 26, 2021, 1:51 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Oct 26, 2021, 1:37 PM EDT | end not reported | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | “501 - 1,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963460, the source gives no report time, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1133 East St | Sanitary sewer overflow (SSO) | 150 gallons | New Britain (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xf74ebe913635, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1170 East St | Sanitary sewer overflow (SSO) | 150 gallons | New Britain (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xc96093bdc19a, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1146 East St | Sanitary sewer overflow (SSO) | 150 gallons | New Britain (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x4515be3ade50, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1181 East St | Sanitary sewer overflow (SSO) | 150 gallons | New Britain (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x37c6338cab06, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1133 East St | Sanitary sewer overflow (SSO) | “Undetermined” | New Britain (CT DEEP reporting archive 2016-2021), record bypass-35963784, reported Sep 2, 2021, 2:46 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1146 East St | Sanitary sewer overflow (SSO) | “Undetermined” | New Britain (CT DEEP reporting archive 2016-2021), record bypass-35963783, reported Sep 2, 2021, 2:44 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1170 East St | Sanitary sewer overflow (SSO) | “Undetermined” | New Britain (CT DEEP reporting archive 2016-2021), record bypass-35963782, reported Sep 2, 2021, 2:43 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 2, 2021, 2:00 AM EDT | Sep 2, 2021, 10:00 AM EDT | New Britain | Manhole, 1181 East St | Sanitary sewer overflow (SSO) | “Undetermined” | New Britain (CT DEEP reporting archive 2016-2021), record bypass-35963781, reported Sep 2, 2021, 2:40 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 1, 2021, 5:36 PM EDT | Sep 4, 2021, 9:15 PM EDT | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 20.53 million gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x3360e7c86ca5, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 1, 2021, 5:36 PM EDT | end not reported | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | “100,001 - 500,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963702, reported Sep 1, 2021, 6:56 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 1, 2021, 5:36 PM EDT | end not reported | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | “100,001 - 500,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963417, reported Sep 1, 2021, 6:56 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 1, 2021, 5:36 PM EDT | Sep 4, 2021, 9:12 PM EDT | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 20 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963416, reported Sep 1, 2021, 6:56 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Sep 1, 2021, 5:36 PM EDT | Sep 4, 2021, 9:15 PM EDT | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 20 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963415, reported Sep 1, 2021, 6:56 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 23, 2021, 12:44 PM EDT | Aug 24, 2021, 10:34 PM EDT | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 9.21 million gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x8b1b6ae89aec, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 23, 2021, 12:44 PM EDT | end not reported | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 9.21 million gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963715, reported Aug 23, 2021, 12:55 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 23, 2021, 12:44 PM EDT | end not reported | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | “100,001 - 500,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963714, reported Aug 23, 2021, 12:55 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 23, 2021, 12:44 PM EDT | end not reported | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | “100,001 - 500,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963713, reported Aug 23, 2021, 12:55 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 23, 2021, 12:44 PM EDT | Aug 24, 2021, 10:34 PM EDT | The Metropolitan District | Manhole, 115 Hillcrest Ave | Sanitary sewer overflow (SSO) | 9.21 million gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963514, reported Aug 23, 2021, 12:55 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:24 PM EDT | Aug 22, 2021, 2:34 PM EDT | The Metropolitan District | Manhole, 115 HILLCREST AVE | Sanitary sewer overflow (SSO) | 3.9 million gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xbe22c2fff1a1, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:24 PM EDT | Aug 22, 2021, 2:34 PM EDT | The Metropolitan District | Manhole, 115 HILLCREST AVE | Sanitary sewer overflow (SSO) | “100,001 - 500,000 gallons” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963707, reported Aug 22, 2021, 2:42 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:24 PM EDT | Aug 23, 2021, 2:00 AM EDT | The Metropolitan District | Manhole, HILLCREST AVE | Sanitary sewer overflow (SSO) | 3.9 million gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963508, reported Aug 22, 2021, 3:45 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 22, 2021, 2:24 PM EDT | end not reported | The Metropolitan District | Manhole, HILLCREST AVE | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963465, reported Aug 22, 2021, 3:45 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 19, 2021, 9:52 AM EDT | Aug 19, 2021, 2:22 PM EDT | The Metropolitan District | HILLCREST AVE - WH | Sanitary sewer overflow (SSO) | 2.06 million gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x6da07ccf65e1, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 19, 2021, 9:52 AM EDT | Aug 19, 2021, 2:22 PM EDT | The Metropolitan District | HILLCREST AVE - WH | Sanitary sewer overflow (SSO) | 2 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963452, reported Aug 19, 2021, 9:52 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 19, 2021, 9:52 AM EDT | end not reported | The Metropolitan District | HILLCREST AVE - WH | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963419, reported Aug 19, 2021, 9:52 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Aug 19, 2021, 9:52 AM EDT | end not reported | The Metropolitan District | HILLCREST AVE - WH | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963418, reported Aug 19, 2021, 9:52 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 8:20 AM EDT | Jul 11, 2021, 5:45 PM EDT | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | 17.17 million gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record x522085839504, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 8:20 AM EDT | Jul 11, 2021, 5:45 PM EDT | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | 17.17 million gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963493, reported Jul 9, 2021, 9:26 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 8:20 AM EDT | end not reported | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963492, reported Jul 9, 2021, 9:26 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 8:20 AM EDT | Jul 11, 2021, 5:44 PM EDT | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | 17.17 million gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963490, reported Jul 9, 2021, 9:26 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Jul 9, 2021, 8:20 AM EDT | end not reported | The Metropolitan District | Manhole, Hillcrest Ave - West Hartford | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963461, reported Jul 9, 2021, 9:26 AM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2021, 11:34 PM EDT | May 31, 2021, 2:06 AM EDT | The Metropolitan District | Manhole, HILLCREST AVE | Sanitary sewer overflow (SSO) | 3,000 gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xc9b0e5b5a0ae, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2021, 11:34 PM EDT | May 31, 2021, 2:06 AM EDT | The Metropolitan District | Manhole, HILLCREST AVE | Sanitary sewer overflow (SSO) | 3,000 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963748, reported May 30, 2021, 11:43 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| May 30, 2021, 11:34 PM EDT | end not reported | The Metropolitan District | Manhole, HILLCREST AVE | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963747, reported May 30, 2021, 11:43 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 15, 2021, 11:08 PM EDT | Apr 16, 2021, 4:32 PM EDT | The Metropolitan District | Manhole, HILLCREST DR | Sanitary sewer overflow (SSO) | 63,000 gallons | The Metropolitan District (CT DEEP Sewage Right-to-Know annual report 2022) via CT DEEP Sewage Right-to-Know annual report 2024, record xf44f60725fb7, published Oct 9, 2024, 12:47 PM EDT, retrieved 2026-11-02 15:52 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 15, 2021, 11:08 PM EDT | Apr 16, 2021, 4:32 PM EDT | The Metropolitan District | Manhole, HILLCREST DR | Sanitary sewer overflow (SSO) | 63,000 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963485, reported Apr 15, 2021, 11:25 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 15, 2021, 11:08 PM EDT | end not reported | The Metropolitan District | Manhole, HILLCREST DR | Sanitary sewer overflow (SSO) | 63,000 gallons | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963484, reported Apr 15, 2021, 11:25 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
| Apr 15, 2021, 11:08 PM EDT | end not reported | The Metropolitan District | Manhole, HILLCREST DR | Sanitary sewer overflow (SSO) | “Undetermined” | The Metropolitan District (CT DEEP reporting archive 2016-2021), record bypass-35963459, reported Apr 15, 2021, 11:25 PM EDT, retrieved 2026-11-02 15:54 UTC · Read the original notice | Open record below · Map |
Read the full record | |||||||
Showing the latest 100 records of 174 records. See them all with filters.
Wastewater outlets on this water
Outfall: a pipe or outlet where wastewater enters a water body.
No wastewater outlet in our records is linked to this water.
Sewer operators listed for this water: The Metropolitan District (MDC) - Hartford Water Pollution Control Facility and combined sewer system.
Boat launches
No public boat launch is listed in our records for this water.
Sources covering this water
- CT DEEP CSO/SSO Performance Dashboard (QScend) · Latest check succeeded · Last successful check: 2026-11-02 15:52 UTC
- CT DEEP Sewage Right-to-Know annual report 2024 · Latest check succeeded · Last successful check: 2026-11-02 15:54 UTC
- CT DEEP reporting archive 2016-2021 · Latest check succeeded · Last successful check: 2026-11-02 15:54 UTC
174 records linked to this water. Updated Nov 2, 2026, 11:21 AM EST.