Discharge possible: heavy rain, no report received

Radar shows that recent rain at a combined sewer system's outlets has reached the amount set for that system, and its operator has not reported a discharge. It reads "discharge likely" or "discharge possible" by how often that system has reported an overflow after storms that size, or by its own or its state's published rain rule, and "discharge possible" where only our default of 0.1 inch (2.5 mm) applies; each caution states its basis. This status since . Why this status, and its source

This badge describes the water outline. Check the downstream stretches on the map and below for discharge statuses.

Map sources

Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Solid dots mark combined sewer outfalls. Grey dots are closed outfalls. A yellow ring with a dashed edge means discharge likely or possible: heavy rain, no report received. Dashed river stretches are estimates.

Rain expected: 0.71 inches (18 mm) forecast in the next 24 hours (NWS forecast issued Nov 25, 2026, 10:15 AM EST); discharges here have begun at 0.1 inch (2.5 mm). A forecast, not a report.

Check CWA Authority, Inc. (Citizens Energy Group), Indianapolis's notices · Bookmark this water page and check it before each trip · Report a missing notice or error

About this status

Discharge possible: heavy rain, no report received: heavy rain at a sewer operator's outlets reached our default amount, and no report received; shown until 48 hours after the 24-hour total falls below the threshold (our rule). Radar measured 0.28 inch (7.1 mm) of rain in the 24 hours to 10:00 p.m. on November 22 at this operator's combined sewer outfalls, the highest reading since this caution began (NOAA MRMS). Now: 0.02 inch (0.5 mm) in the 24 hours to 5:00 p.m. on November 25. The 24-hour total fell below 0.1 inch at 9:00 p.m. on November 23; the caution stays 48 hours after that, until 9:00 p.m. on November 25. CWA Authority, Inc. (Citizens Energy Group), Indianapolis has too few dated overflow reports on record to set a level from (no dated overflow report from this operator in a source we read), and neither it nor its state publishes a rain rule, so our default applies: 0.1 inch of rain in 24 hours. This is our caution, based on rainfall (not a report or finding).

Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 22, 2026, 10:00 PM EST, latest reading valid Nov 25, 2026, 5:00 PM EST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.1 inch, from our default; rule: How it works, discharge likely or possible. · Updated

Only monthly sewage totals are reported for this water: days with discharge in a month, not their dates.

Estimated downstream stretches on Pleasant Run

none from a report; 50 routes below outlets with a status

No stretch below a reported discharge has a current status here as of Nov 25, 2026, 5:57 PM EST. The routes below wastewater outlets carry the status shown on each.

Estimated routes below wastewater outlets with a current status

Source: DirtyWaterWatch estimates using U.S. Geological Survey river maps and flow measurements. The estimate stops at an estuary or the sea, the first lake or the distance limit.

The last 90 days

Last 90 days, hour by hour. Red: discharge or advisory reported. Amber: caution. Hatched amber: end not confirmed. Plum: algal bloom advisory. Red or amber with a light line inside: beach advisory or caution. Dotted: monthly report (days with discharge, dates not given). Grey: no current status on the water outline. Purple hatching: a status resting on a source that could not be checked on schedule.
  • Discharge likely or possible: heavy rain, no report received: to the latest update
    Radar estimate, no report received: heavy rain at the outlets of Citizens Energy Group

Source: DirtyWaterWatch calculations using the reports named above and the published status rules. Updated 2026-11-25 22:57 UTC.

Reported discharges over time

  • Discharges affecting the Pleasant Run in Indiana, last 12 months0December 2025 to November 2026Verified reports where available, else notices; revisions and duplicates counted once. Arriving discharges are estimated from modeled downstream reaches.
  • Records behind the last-90-days strip for the Pleasant Run in Indiana1Reported on the Pleasant Run in Indiana: 0 · Arriving from outfalls upstream, estimated: 0 · Other records (rain-likely and similar): 1last 90 daysEvery distinct record the strip lists for its red, yellow and unresolved hours, notices and unresolved reports included; counted as the strip counts them.

This record covers the Pleasant Run within Indiana; the same river upstream is a separate record.

Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system. Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater. Outfall: a pipe or outlet where wastewater enters a water body.

Reported discharges per month

0 reported discharges, January 2022 to November 2026.

  • Combined sewer overflow
  • Sanitary sewer overflow
  • Treatment bypass, blended or other
  • Incomplete source coverage
Limited records

Some sewer operators here report only monthly or yearly totals; those appear under reported totals and are not counted here.

Source: U.S. Environmental Protection Agency sewer overflow records. Records cover January 1, 2022 to November 25, 2026.

Show table

Reported monthly totals: U.S. Environmental Protection Agency discharge monitoring reports for Indiana

Monthly totals each Indiana operator files for each combined sewer outlet (number of discharges, hours and million gallons in discharge monitoring reports, published by the U.S. Environmental Protection Agency weeks after the month). They are shown here and never added to the discharge counts. An operator files a month with no discharge as such; a month with no row is one with no discharge or no report, which the reports do not tell apart, so it is left blank, never shown as zero. Source: U.S. Environmental Protection Agency discharge monitoring reports for Indiana. Records cover January 1, 2025 to December 31, 2025.

Reported volume

Gallons per month; 1 million gallons is 3.79 million litres (axis: K thousand, M million).

Show table

Discharges reported

Discharges per month.

Show table

Hours of discharge reported

Hours per month.

Show table
How these charts are counted

We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow our rules. Shaded gaps mean missing coverage, not zero discharges.

  • U.S. Environmental Protection Agency sewer overflow records: records from November 29, 2019 to the latest update (limited records)

Reports linked to Pleasant Run

Reports linked to Pleasant Run, newest first
WhenReportStatus
to December 2025Citizens Energy Group · 154 CSO - Pleasant Run Pkwy N Dr and Michigan St · CSO · “2 discharge events, 0.67 hours, 0.02 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 149 CSO - Pleasant Run Pkwy S Dr and Garfield Dr · CSO · “3 discharge events, 7.42 hours, 0.83 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 107 CSO - Pleasant Run Pkwy S Dr and St Paul St · CSO · “10 discharge events, 53.08 hours, 3.72 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 090 CSO - Lowell Ave and Sheridan Ave · CSO · “2 discharge events, 2.67 hours, 0.15 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 089 CSO - Pleasant Run Pkwy N Dr and Arlington Ave · CSO · “2 discharge events, 1 hours, 0.07 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 084 CSO - Pleasant Run Pkwy N Dr and Michigan St · CSO · “2 discharge events, 4.5 hours, 1.77 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 080 CSO - Pleasant Run Pkwy N Dr and Wallace Ave · CSO · “2 discharge events, 3.17 hours, 0.14 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 078 CSO - Pleasant Run Pkwy N Dr and Brookville Rd · CSO · “2 discharge events, 4.25 hours, 0.76 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 077 CSO - Pleasant Run Pkwy N Dr and Sherman Dr · CSO · “2 discharge events, 3 hours, 0.23 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to December 2025Citizens Energy Group · 028 CSO - PLRPSD and State St · CSO · “6 discharge events, 17.83 hours, 0.66 million gallons in 2025-12 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 154 CSO - Pleasant Run Pkwy N Dr and Michigan St · CSO · “1 discharge event, 1 hours, 0.11 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 151 CSO - Pleasant Run Pkwy N Dr and Beecher St · CSO · “1 discharge event, 0.25 hours, 0.01 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 149 CSO - Pleasant Run Pkwy S Dr and Garfield Dr · CSO · “3 discharge events, 10.42 hours, 1.31 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 107 CSO - Pleasant Run Pkwy S Dr and St Paul St · CSO · “9 discharge events, 51.25 hours, 4.54 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 090 CSO - Lowell Ave and Sheridan Ave · CSO · “1 discharge event, 3.25 hours, 0.2 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 089 CSO - Pleasant Run Pkwy N Dr and Arlington Ave · CSO · “1 discharge event, 0.58 hours, 0.06 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 084 CSO - Pleasant Run Pkwy N Dr and Michigan St · CSO · “2 discharge events, 6.42 hours, 2.05 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 080 CSO - Pleasant Run Pkwy N Dr and Wallace Ave · CSO · “1 discharge event, 2.92 hours, 0.22 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 078 CSO - Pleasant Run Pkwy N Dr and Brookville Rd · CSO · “1 discharge event, 5.5 hours, 1.01 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 077 CSO - Pleasant Run Pkwy N Dr and Sherman Dr · CSO · “1 discharge event, 3.33 hours, 0.31 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 076 CSO - Pleasant Run Pkwy N Dr and English Ave · CSO · “1 discharge event, 0.5 hours, 0.03 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 028 CSO - PLRPSD and State St · CSO · “4 discharge events, 17.67 hours, 0.88 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 025 CSO - PLRPND and Shelby St · CSO · “1 discharge event, 0.75 hours, 0.06 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to November 2025Citizens Energy Group · 022 CSO - PLRPSD and Raymond St · CSO · “1 discharge event, 0.5 hours, 0.07 million gallons in 2025-11 (monthly DMR totals)” report · notice · mapended
to October 2025Citizens Energy Group · 154 CSO - Pleasant Run Pkwy N Dr and Michigan St · CSO · “2 discharge events, 1 hours, 0.07 million gallons in 2025-10 (monthly DMR totals)” report · notice · mapended

Sources: EPA ECHO discharge monitoring reports: Indiana combined sewer outfalls' monthly totals (events, hours, million gallons), retrieved 2026-11-25 22:32 UTC. A report's record id and times show when you hover or focus its "report" link.

Download these reports as CSV

Showing the latest 25 records of 206 records.See them all with filters.

All reports in Indiana by year: 2025 (206 here)

State water quality assessment

Indiana's 2026 water quality assessment lists Pleasant Run unit INW01C2_04 as impaired by E. coli. The state names combined sewer overflows as a probable source. Indiana's assessment of Pleasant Run unit INW01C2_04 (EPA How's My Waterway)

Indiana's 2026 water quality assessment lists Pleasant Run unit INW01C2_05 as impaired by E. coli. The state names combined sewer overflows as a probable source. Indiana's assessment of Pleasant Run unit INW01C2_05 (EPA How's My Waterway)

Indiana's 2026 water quality assessment lists Pleasant Run unit INW01C2_06 as impaired by E. coli. The state names combined sewer overflows as a probable source. Indiana's assessment of Pleasant Run unit INW01C2_06 (EPA How's My Waterway)

This is the state's assessment of past samples (not a current condition) and does not change the status. How we match assessments to waters

Source: state water quality assessments via U.S. Environmental Protection Agency ATTAINS, national file of November 21, 2026, map layers edited September 2, 2026, 2026 cycle, assessment units INW01C2_04, INW01C2_05 and INW01C2_06, retrieved 2026-11-23 18:33 UTC. Units matched to this water by DirtyWaterWatch. · EPA national assessment file (ZIP, 206 MB)

Records as cited: INW01C2_04 (2026), INW01C2_05 (2026), INW01C2_06 (2026).

Wastewater outlets on this water

Combined sewer outfalls

50 outfalls · 3 closed · discharge possible now at 47

Discharge possible: heavy rain, no report received Radar measured 0.28 inch (7.1 mm) of rain in the 24 hours to 10:00 p.m. on November 22 at this operator's combined sewer outfalls, the highest reading since this caution began (NOAA MRMS). Now: 0.02 inch (0.5 mm) in the 24 hours to 5:00 p.m. on November 25. The 24-hour total fell below 0.1 inch at 9:00 p.m. on November 23; the caution stays 48 hours after that, until 9:00 p.m. on November 25. CWA Authority, Inc. (Citizens Energy Group), Indianapolis has too few dated overflow reports on record to set a level from (no dated overflow report from this operator in a source we read), and neither it nor its state publishes a rain rule, so our default applies: 0.1 inch of rain in 24 hours. This is our caution, based on rainfall (not a report or finding).

Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 22, 2026, 10:00 PM EST, latest reading valid Nov 25, 2026, 5:00 PM EST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.1 inch, from our default; rule: How it works, discharge likely or possible.

Showing 12 of 50.

Source: U.S. Environmental Protection Agency (EPA) national combined sewer outfall inventory (ECHO) and state outfall layers. Open or closed as EPA's inventory lists it. DirtyWaterWatch links outlets to waters using permit numbers, locations and names.

Sewer operators listed for this water: CWA Authority, Inc. (Citizens Energy Group), Indianapolis.