New Mexico / Waters /
Rio Grande
River in New Mexico, past Antoine Leroux Grant, Bosque Farms, Fort Selden, Los Lunas, Pilar, Rinconada, Taos, Truth or Consequences and Williamsburg
Current status
No current status is assigned to this water outline. Check the water page for reports and any estimated downstream stretches. Why this status, and its source
Zoom in to see waters with no current status.
Map sources
Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Ringed dots mark treatment plant outfalls. Square boat markers mark boat launches listed by OpenBoatLaunch. Larger round markers with a label mark beach and other official advisories nearby.
Upstream and downstream
Rio Grande is tracked as one record per state. Listed from north to south.
- Rio Grande, CO No current status shown · 0 discharges setting a status now
- Rio Grande, NM (this page) No current status shown · 0 discharges setting a status now · latest report
- Rio Grande, TX No current status shown · 0 discharges setting a status now
- Rio Grande, TX No current status shown · 0 discharges setting a status now · latest report
- Rio Grande, TX No current status shown · 0 discharges setting a status now · latest report
Check Albuquerque Bernalillo County Water Utility Authority's notices · Bookmark this water page and check it before each trip · Report a missing notice or error
About this status
No current status shown: no report we track sets a status on this water now; how statuses work. No status does not mean the water is safe. Follow posted signs and local health advice.
Sources checked: ECHO Effluent Charts REST services (last successful check 2026-11-25 22:28 UTC); ECHO NPDES Sewer Overflow and Bypass Event Dataset (last successful check 2026-11-25 22:28 UTC); NMED Surface Water Quality Bureau HABs Mapper (current HAB advisories) feature service (last successful check 2026-11-25 22:42 UTC). Status by DirtyWaterWatch, updated 2026-11-25 22:57 UTC. · Updated
Reports in New Mexico can appear days after a discharge; a quiet map can mean a report has not appeared yet. How New Mexico reports
The last 90 days
No discharge, advisory or caution periods are shown for this water in this time span. Check downstream stretches and source coverage.
Source: DirtyWaterWatch calculations using the reports named above and the published status rules. Updated 2026-11-25 22:57 UTC.
Reported discharges over time
- Discharges affecting the Rio Grande in New Mexico, last 12 months0December 2025 to November 2026Verified reports where available, else notices; revisions and duplicates counted once. Arriving discharges are estimated from modeled downstream reaches.
- Records behind the last-90-days strip for the Rio Grande in New Mexico0last 90 daysEvery distinct record the strip lists for its red, yellow and unresolved hours, notices and unresolved reports included; counted as the strip counts them.
This record covers the Rio Grande within New Mexico; the same river upstream is a separate record.
Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system. Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater.
Reported discharges per month
0 reported discharges, January 2022 to November 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- Incomplete source coverage
Source: U.S. Environmental Protection Agency sewer overflow records. Records cover January 1, 2022 to November 25, 2026.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| January 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage |
How these charts are counted
We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow our rules. Shaded gaps mean missing coverage, not zero discharges.
- U.S. Environmental Protection Agency sewer overflow records: records from November 29, 2019 to the latest update (limited records)
Reports linked to Rio Grande
Cyanobacteria (harmful blue-green algae) can make water unfit for contact; the issuing authority decides when its advisory ends.
| When | Report | Status |
|---|---|---|
| New Mexico Environment Department, Surface Water Quality Bureau (HABs Mapper) · Algae advisory · volume not reported report · notice · map | listed | |
| New Mexico Environment Department, Surface Water Quality Bureau (HABs Mapper) · Algae advisory · volume not reported report · notice · map | listed | |
| New Mexico Environment Department, Surface Water Quality Bureau (HABs Mapper) · Algae advisory · volume not reported report · notice · map | listed | |
| New Mexico Environment Department, Surface Water Quality Bureau (HABs Mapper) · Algae advisory · volume not reported report · notice · map | listed |
Sources: NMED Surface Water Quality Bureau HABs Mapper (current HAB advisories) feature service, retrieved 2026-11-25 12:55 UTC. A report's record id and times show when you hover or focus its "report" link.
All reports in New Mexico by year: 2026 (4 here)
State water quality assessment
New Mexico's 2026 water quality assessment lists Rio Grande (Leasburg Dam to one mile below Percha Dam) as impaired by E. coli. The state names municipal wastewater discharges and septic systems or unsewered areas as probable sources. New Mexico's assessment of Rio Grande (Leasburg Dam to one mile below Percha Dam) (EPA How's My Waterway)
New Mexico's 2026 water quality assessment lists Rio Grande (Arroyo de las Canas to Rio Puerco) as impaired by E. coli. The state names municipal wastewater discharges and septic systems or unsewered areas as probable sources. New Mexico's assessment of Rio Grande (Arroyo de las Canas to Rio Puerco) (EPA How's My Waterway)
New Mexico's 2026 water quality assessment lists Rio Grande (Isleta Pueblo boundary to Tijeras Arroyo) as impaired by E. coli. The state names municipal wastewater discharges and septic systems or unsewered areas as probable sources. New Mexico's assessment of Rio Grande (Isleta Pueblo boundary to Tijeras Arroyo) (EPA How's My Waterway)
19 more assessment units
New Mexico's 2026 water quality assessment lists Rio Grande (non-pueblo Alameda Bridge to HWY 550 Bridge) as impaired by E. coli. New Mexico's assessment of Rio Grande (non-pueblo Alameda Bridge to HWY 550 Bridge) (EPA How's My Waterway)
New Mexico's 2026 water quality assessment lists Rio Grande (non-pueblo HWY 550 Bridge to Angostura Div) as impaired by E. coli. New Mexico's assessment of Rio Grande (non-pueblo HWY 550 Bridge to Angostura Div) (EPA How's My Waterway)
New Mexico's 2026 water quality assessment lists Rio Grande (Rio Puerco to Isleta Pueblo bnd) as impaired by E. coli. New Mexico's assessment of Rio Grande (Rio Puerco to Isleta Pueblo bnd) (EPA How's My Waterway)
New Mexico's 2026 water quality assessment lists Rio Grande (Tijeras Arroyo to Alameda Bridge) as impaired by E. coli. New Mexico's assessment of Rio Grande (Tijeras Arroyo to Alameda Bridge) (EPA How's My Waterway)
This is the state's assessment of past samples (not a current condition) and does not change the status. How we match assessments to waters
Source: state water quality assessments via U.S. Environmental Protection Agency ATTAINS, national file of November 21, 2026, map layers edited September 2, 2026, 2026 cycle, assessment units NM-2101_10, NM-2105_11, NM-2105_50 and 19 more, retrieved 2026-11-23 18:33 UTC. Units matched to this water by DirtyWaterWatch. · EPA national assessment file (ZIP, 206 MB)
Records as cited: NM-2101_10 (2026), NM-2105_11 (2026), NM-2105_50 (2026).
Wastewater outlets on this water
Outfall: a pipe or outlet where wastewater enters a water body.
Treatment plant outfalls
28 outfalls
- Outfall 001 · Village of Los Lunas · receiving water in the permit: SEGMENT 2-105 OF THE RIO GRANDE · status not published
- Outfall TX1 · Village of Los Lunas · receiving water in the permit: SEGMENT 2-105 OF THE RIO GRANDE · status not published
- Outfall 001 · City of Truth or Consequences · receiving water in the permit: RIO GRANDE · status not published
- Outfall TX1 · City of Truth or Consequences · receiving water in the permit: RIO GRANDE · status not published
- Outfall 001 · Albuquerque Bernalillo County Water Utility Authority · receiving water in the permit: RIO GRANDE · status not published
- Outfall TX1 · Albuquerque Bernalillo County Water Utility Authority · receiving water in the permit: RIO GRANDE · status not published
- Outfall 001 · City of Las Cruces Utilities (Jacob A. Hands and East Mesa plants) · receiving water in the permit: RIO GRANDE RIVER SEGMENT · status not published
- Outfall TX1 · City of Las Cruces Utilities (Jacob A. Hands and East Mesa plants) · receiving water in the permit: RIO GRANDE RIVER SEGMENT · status not published
- Outfall 001 · Town of Bernalillo · receiving water in the permit: SEGMENT 2-105 OF THE RIO GRANDE · status not published
- Outfall TX1 · Town of Bernalillo · receiving water in the permit: SEGMENT 2-105 OF THE RIO GRANDE · status not published
- Outfall 001 · City of Rio Rancho (plants no. 2 and no. 3) · receiving water in the permit: RIO GRANDE · status not published
- Outfall 601 · City of Rio Rancho (plants no. 2 and no. 3) · receiving water in the permit: RIO GRANDE · status not published
Showing 12 of 28.
Source: U.S. Environmental Protection Agency (EPA) permit records (ICIS-NPDES permitted features): where a treatment plant’s permitted discharge leaves. No national source says whether a plant outfall is open or closed.
Sewer operators listed for this water: Albuquerque Bernalillo County Water Utility Authority, Anthony Water and Sanitation District, Camino Real Regional Utility Authority (Sunland Park and North plants), City of Española, City of Las Cruces Utilities (Jacob A. Hands and East Mesa plants), City of Rio Rancho (plants no. 2 and no. 3), City of Truth or Consequences, Doña Ana County Utilities (South Central Regional plant), Salem Wastewater Treatment Plant, Town of Bernalillo, Village of Bosque Farms, Village of Los Lunas.
Boat launches
- County Line Boat Takeout, Rinconada · Boat ramp
- John Dunn Bridge Boat Takeout, Antoine Leroux Grant · Boat ramp
- Lone Juniper Boat Takeout, Taos · Boat ramp
- North Picnic Area and Beach Boat Ramp, Fort Selden · Boat ramp
- Quartzite Boat Takeout, Pilar · Boat ramp
- Rio Bravo Boat Takeout, Pilar · Boat ramp
- Taos Junction Bridge Boat Launch · Boat ramp
Source: OpenBoatLaunch launch records (public agency data and OpenStreetMap, Open Database License). · Rio Grande on OpenBoatLaunch
Sources covering this water
- ECHO Effluent Charts REST services · Latest check succeeded · Last successful check: 2026-11-25 22:28 UTC
- ECHO NPDES Sewer Overflow and Bypass Event Dataset · Latest check succeeded · Last successful check: 2026-11-25 22:28 UTC
- NMED Surface Water Quality Bureau HABs Mapper (current HAB advisories) feature service · Latest check succeeded · Last successful check: 2026-11-25 22:42 UTC
4 records linked to this water. Updated .