DirtyWaterWatch Public waters. Public record.

Illinois / Reports /

Treatment bypass reported — ILLINOIS AMERICAN WATER COMPANY - GRANITE CITY WWTP, Sep 22, 2026

Ended (as reported) · EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)

Source: EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators), record IL0033481:28:1, reported Sep 10, 2026, 12:00 AM CDT, retrieved 2026-11-06 08:38 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 6, 2026, 3:03 AM CST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: ILLINOIS AMERICAN WATER COMPANY - GRANITE CITY WWTP (federal wastewater discharge permit, NPDES, IL0033481). Outlet: not stated. Location: 38.69444, -90.18083; location source: given in the source record.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names: “Mississippi River”. DirtyWaterWatch links this report to Mississippi River, IL. Match basis: the water named in the report.

3. Estimated downstream stretch

No downstream estimate is available for this report.

Map sources: water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.

Open on the main map

When it happened and when it was reported

Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).

Started
Ended
Detail provided by the source
Times known to the minute
Reported to the source
Published
Source last updated
Last retrieved by DirtyWaterWatch

What and how much

Type
Treatment bypass: wastewater skips one or more treatment steps.
Status in the record
Ended (as reported)
Material
“wastewater diverted around part of the treatment process”
Volume
3 million gallons (estimated)
Volume as reported
“3,000,000 gallons (Best Professional Judgement)”

Advice from EPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Status history from this report

Source: DirtyWaterWatch calculations using this report and the published status rules. Updated 2026-11-06 09:03 UTC.

Source and versions

Source
Public source
Source record number
IL0033481:28:1
Original notice
Read the original notice
Earlier version
None: this is the first record
Later versions
None

Record details

Record details
Record identifierecho-sewer-overflow:IL0033481:28:1
Source identifierecho-sewer-overflow
Source record numberIL0033481:28:1
Earlier versionNot provided
TypeTreatment bypass
Status in the reportEnded (as reported)
Sewer operator identifieril-illinois-american-water-company-granite-city-wwtp
Sewer operatorILLINOIS AMERICAN WATER COMPANY - GRANITE CITY WWTP
Federal wastewater discharge permit (NPDES)IL0033481
Outlet numberNot provided
Outlet nameNot provided
Water named in the reportMississippi River
Linked watersmississippi-river-il
How this report was linked to the waterthe water named in the report
Latitude38.694
Longitude-90.181
Location sourcegiven in the source record
Location accuracy, in metresNot provided
StartedSep 22, 2026, 12:00 PM CDT (2026-09-22T12:00:00-05:00)
EndedSep 22, 2026, 9:00 PM CDT (2026-09-22T21:00:00-05:00)
Detail provided by the sourceto the minute
Reported to the sourceSep 10, 2026, 12:00 AM CDT (2026-09-10)
PublishedNov 4, 2026, 12:00 AM CST (2026-11-04)
Source last updatedNov 4, 2026, 6:21 AM CST (2026-11-04T12:21:15Z)
Last retrieved by DirtyWaterWatchNov 6, 2026, 2:38 AM CST (2026-11-06T08:38:59Z)
Materialwastewater diverted around part of the treatment process
Volume, in gallons3,000,000
Volume as reported3,000,000 gallons (Best Professional Judgement)
How volume was determinedestimated
AuthorityEPA ECHO Sewer Overflow and Bypass Event report (reported to regulators)
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://echo.epa.gov/detailed-facility-report?fid=IL0033481&sys=ICP

Original source data

{
  "permit_identifier": "IL0033481",
  "program_report_form_set_id": "28",
  "program_report_form_id": "1",
  "sewer_overflow_bypass_event_key": "27353",
  "sewer_overflow_bypass_event_id_ext": "1",
  "sewer_overflow_bypass_description_text": "Planned power outage",
  "sewer_overflow_bypass_reporting_requirement_code": "4",
  "sewer_overflow_reporting_requirement_desc": "Anticipated bypass notice",
  "latitude_measure": "38.694444",
  "longitude_measure": "-90.180833",
  "sewer_overflow_bypass_duration_hours": "9.00",
  "sewer_overflow_bypass_start_datetime": "2026-09-22 12:00:00",
  "sewer_overflow_bypass_end_datetime": "2026-09-22 21:00:00",
  "discharge_quantification_method_code": "BPJ",
  "discharge_quantification_method_desc": "Best Professional Judgement",
  "sewer_overflow_bypass_discharge_volume_gallons": "3000000.00",
  "anticipated_bypass_text": "The plants power will be shut down to change a transformer. All water will be diverted to the combined overflow tanks. Once power is restored the water will be brought back to the plant. No discharge is anticipated.",
  "anticipated_bypass_expect_limit_violation": "N",
  "payload_id": "319096429",
  "event_transaction_type": "N",
  "program_report_received_date": "2026-09-10",
  "program_report_start_date": "2026-09-22",
  "program_report_end_date": "2026-09-22",
  "electronic_submission_type_code": "ES1",
  "electr_submission_type_desc": "EPA electronic reporting system",
  "program_report_npdes_data_group_number_code": "G9C",
  "transaction_type": "N",
  "types": [
    "Bypass Event"
  ],
  "receiving_waters": [
    "Mississippi River "
  ],
  "impacts": [
    {
      "code": "NOI",
      "desc": "No observable impacts",
      "other": null
    }
  ],
  "causes": [
    {
      "code": "OTE",
      "desc": "Other Cause at Treatment Plant - Electrical Failure",
      "other": "replacing transformer"
    }
  ],
  "corrective_actions": [
    {
      "code": "FEP",
      "desc": "Fix Electrical Problem",
      "other": null
    }
  ],
  "treatment": [
    {
      "code": null,
      "desc": null,
      "bypassed_equipment": "Primary treatment equipment"
    }
  ],
  "collection_system_name": null,
  "percent_collection_system_css": null,
  "reached_water_rule": "receiving water named",
  "timezone_note": "ECHO gives event times without a timezone; read as America/Chicago, the permit's state's zone (a fall-back hour that happens twice is read as the first)",
  "report_version": "1"
}

Staff names, email addresses and phone numbers are removed from source data before it is stored.