DirtyWaterWatch Public waters. Public record.

Maryland / Reports /

Sanitary sewer overflow (SSO) reported — Baltimore City DPW, Nov 24, 2026

Ended (as reported) · Baltimore City DPW

Source: Baltimore City DPW via MDE Reported Sewer Overflows (New for 2023), Maryland Open Data Portal (Socrata stgj-u72u), record mdc021601-20261124T0800-2333-madison-ave, updated by the source Nov 25, 2026, 5:00 AM EST, retrieved 2026-11-26 01:36 UTC · Read the original notice

Current status from this report

This report does not set a map status as of Nov 25, 2026, 8:59 PM EST. Check its dates and the status rules.

A report is not a test of the water. See how we assign statuses.

Read the original notice · Report an error

1. Reported wastewater outlet

Operator named in the record: Baltimore City DPW. Outlet: “2333 Madison Ave”. Location: not given in the report or in the outlet records.

Outfall: a pipe or outlet where wastewater enters a water body.

2. Waters named in the notice

The notice names no water. No receiving water: the report names no surface water (receiving water left blank). The report is kept here but is not placed on a water and colours none on the map.

3. Estimated stretch

We estimate routes only on rivers, including their tidal stretches. We do not estimate routes through estuaries, the sea or lakes.

What the source reports

Event and notice times use Eastern Time (EST or EDT). Retrieval times use Coordinated Universal Time (UTC).

When

Started
Ended
The source gives no end time.
Our estimate of the end
. We added the duration the report gives, 7 hours, to its start time. How we estimate
Duration, as the source gives it
“0 days, 7 hours, 0 minutes”
Detail of the times
Times known to the minute

What

Type
Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater.
Status in the record
Ended (as reported)
Material
not stated
Cause
“main line backed up”

How much

Volume
The source gives no volume.

Advice in the source

This report includes no advice. Check current local health notices.

Advice period
This report does not state a period. See the rule DirtyWaterWatch applies and its source.
Basis
not stated

Who reported it

Operator named
Baltimore City DPW
Authority
Baltimore City DPW
Published by
MDE Reported Sewer Overflows (New for 2023), Maryland Open Data Portal (Socrata stgj-u72u)

When it was reported and read

Reported to the source
not given
Published
not given
Source last updated

DirtyWaterWatch observations

Last retrieved by DirtyWaterWatch

Source

Source
MDE Reported Sewer Overflows (New for 2023), Maryland Open Data Portal (Socrata stgj-u72u)
Source record number
mdc021601-20261124T0800-2333-madison-ave
Original notice
Read the original notice

Record details

Record details
Record identifiermd-mde-overflows:mdc021601-20261124T0800-2333-madison-ave
Source identifiermd-mde-overflows
Source record numbermdc021601-20261124T0800-2333-madison-ave
Earlier versionNot provided
TypeSanitary sewer overflow (SSO)
Status in the reportEnded (as reported)
Sewer operator identifiermd-baltimore-city-dpw
Sewer operatorBaltimore City DPW
Federal wastewater discharge permit (NPDES)Not provided
Outlet numberNot provided
Outlet name2333 Madison Ave
Water named in the reportNot provided
Linked watersNot provided
How this report was linked to the waternot linked to a mapped water
LatitudeNot provided
LongitudeNot provided
Location sourceNot provided
Location accuracyNot provided
StartedNov 24, 2026, 8:00 AM EST (2026-11-24T08:00:00-05:00)
EndedNov 24, 2026, 3:00 PM EST (2026-11-24T15:00:00-05:00)
Detail provided by the sourceto the minute
Reported to the sourceNot provided
PublishedNot provided
Source last updatedNov 25, 2026, 5:00 AM EST (2026-11-25T05:00:19-05:00)
Last retrieved by DirtyWaterWatchNov 25, 2026, 8:36 PM EST (2026-11-26T01:36:02Z)
MaterialNot provided
VolumeNot provided
Volume as reportedNot provided
How volume was determinednot stated whether estimated or measured
AuthorityBaltimore City DPW
AdviceNot provided
Advice period, in hoursNot provided
Basis of the advice periodNot provided
Original noticehttps://opendata.maryland.gov/dataset/Reported-Sewer-Overflows-New-for-2023-/stgj-u72u

Original source data

{
  "row": {
    "overflow_type": "SSO",
    "facility_collection_system": "Patapsco WWTP Collection System - Baltimore City",
    "npdes_no": "MDC021601",
    "start_date": "11/24/2026",
    "start_time": "08:00:00",
    "duration_day": "0",
    "duration_hour": "7",
    "duration_minute": "0",
    "overflow_address": "2333 Madison Ave",
    "zip": "21217",
    "owner_name": "Baltimore City DPW",
    "discharge_volume": "",
    "overflow_cause": "main line backed up",
    "receiving_water": "",
    "county": "Baltimore City",
    "penalty_id": "",
    "overflow_latitude": "",
    "overflow_longitude": "",
    "id": "1"
  }
}

Staff names, email addresses and phone numbers are removed from source data before it is stored.