Rhode Island / Waters /
Seekonk River
River in Rhode Island, past Central Falls, Cumberland and Pawtucket
Current status
Caution applies after a recent discharge, when a report leaves its status unclear, or during a rainfall advisory. The report explains which rule applies. This status since . Why this status, and its source
This status counts every report affecting this water, including discharges arriving from upstream.
This badge describes the water outline. Check the downstream stretches on the map and below for discharge statuses.
Zoom in to see waters with no current status.
Map sources
Water outlines and launches from OpenBoatLaunch and OpenStreetMap contributors (Open Database License); wastewater outlets from EPA and state records; downstream estimates by DirtyWaterWatch using U.S. Geological Survey maps and flow data. Base map: OpenFreeMap and OpenMapTiles.
Dashed river stretches are estimates.
Check Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs's notices · Bookmark this water page and check it before each trip · Report a missing notice or error
About this status
Caution: a discharge was reported; caution for 72 hours after the reported end (our rule). Radar measured 1.53 inches (39 mm) of rain in the 24 hours to 4:00 a.m. on November 23 at this operator's combined sewer outfalls, the highest reading since this caution began (NOAA MRMS). Now: 0.00 inch (0 mm) in the 24 hours to 5:00 p.m. on November 25. The 24-hour total fell below 0.5 inch at 1:00 a.m. on November 24; the caution stays 48 hours after that, until 1:00 a.m. on November 26. Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs has too few dated overflow reports on record to set a level from (7 storms followed by a report; 10 are needed), and publishes no rain rule of its own, so its state's rule applies: Rhode Island closes shellfish areas in Narragansett Bay after 0.5 inch of rain. This is our caution, based on rainfall (not a report or finding).
Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 23, 2026, 4:00 AM EST, latest reading valid Nov 25, 2026, 5:00 PM EST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.5 inch, from state trigger, Rhode Island DEM shellfish program, rainfall closures; rule: How it works, discharge likely or possible. · Updated
Discharge likely: heavy rain, no report received. Radar measured 1.53 inches (39 mm) of rain in the 24 hours to 4:00 a.m. on November 23 at this operator's combined sewer outfalls, the highest reading since this caution began (NOAA MRMS). Now: 0.00 inch (0 mm) in the 24 hours to 5:00 p.m. on November 25. The 24-hour total fell below 0.5 inch at 1:00 a.m. on November 24; the caution stays 48 hours after that, until 1:00 a.m. on November 26. Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs has too few dated overflow reports on record to set a level from (2 storms followed by a report; 10 are needed), and publishes no rain rule of its own, so its state's rule applies: Rhode Island closes shellfish areas in Narragansett Bay after 0.5 inch of rain. This is our caution, based on rainfall (not a report or finding).
Source: NOAA National Weather Service, MRMS radar-only rainfall estimate, highest reading valid Nov 23, 2026, 4:00 AM EST, latest reading valid Nov 25, 2026, 5:00 PM EST, retrieved 2026-11-25 22:49 UTC; caution starts at 0.5 inch, from state trigger, Rhode Island DEM shellfish program, rainfall closures; rule: How it works, discharge likely or possible.
Reports behind this status
Combined sewer overflow (CSO): sewage mixed with rainwater spills from a shared sewer system.
| When | Report | Status |
|---|---|---|
| to Nov 23, 1:45 AM | Narragansett Bay Commission · OF 201 OF 201_East_Roosevelt · CSO · volume not reported report · notice · map | to Nov 26, 1:45 AM |
| to Nov 23, 1:43 AM | Narragansett Bay Commission · OF 205 OF 205_Central_Front · CSO · volume not reported report · notice · map | to Nov 26, 1:43 AM |
| to 1:30 AM | Narragansett Bay Commission · OF 203 OF 203_Middle_Carnation · CSO · volume not reported report · notice · map | to Nov 26, 1:30 AM |
| to Nov 23, 1:30 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | to Nov 26, 1:30 AM |
| to Nov 23, 1:20 AM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | to Nov 26, 1:20 AM |
| to 1:15 AM | Narragansett Bay Commission · OF 210 OF 210_Main_High · CSO · volume not reported report · notice · map | to Nov 26, 1:15 AM |
| to 1:10 AM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | to Nov 26, 1:10 AM |
| to Nov 23, 1:10 AM | Narragansett Bay Commission · OF 215 OF 215_Division_River · CSO · volume not reported report · notice · map | to Nov 26, 1:10 AM |
| to 1:05 AM | Narragansett Bay Commission · OF 206 OF 206_Blackstone_Roosevelt · CSO · volume not reported report · notice · map | to Nov 26, 1:05 AM |
| to Nov 23, 1:05 AM | Narragansett Bay Commission · OF 104 OF 104_Charles · CSO · volume not reported report · notice · map | to Nov 26, 1:05 AM |
| to Nov 23, 12:35 AM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | to Nov 26, 12:35 AM |
| to 12:35 AM | Narragansett Bay Commission · OF 105 OF 105_Roosevelt_Cross · CSO · volume not reported report · notice · map | to Nov 26, 12:35 AM |
| to 12:25 AM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | to Nov 26, 12:25 AM |
| to 11:29 PM | Narragansett Bay Commission · OF 205 OF 205_Central_Front · CSO · volume not reported report · notice · map | to Nov 25, 11:29 PM |
| to 11:15 PM | Narragansett Bay Commission · OF 203 OF 203_Middle_Carnation · CSO · volume not reported report · notice · map | to Nov 25, 11:15 PM |
| to 11:15 PM | Narragansett Bay Commission · OF 210 OF 210_Main_High · CSO · volume not reported report · notice · map | to Nov 25, 11:15 PM |
| to 11:05 PM | Narragansett Bay Commission · OF 215 OF 215_Division_River · CSO · volume not reported report · notice · map | to Nov 25, 11:05 PM |
| to 10:25 PM | Narragansett Bay Commission · OF 104 OF 104_Charles · CSO · volume not reported report · notice · map | to Nov 25, 10:25 PM |
| Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | to Dec 6, 4:10 AM |
Sources: NBC CSO Alarm Map live outfall status (JSON), retrieved 2026-11-25 22:40 UTC. A report's record id and times show when you hover or focus its "report" link.
Advice in the reports
Narragansett Bay Commission CSO Alarm Map · Nov 22, 2026 · Current status: sets this water's status now
“During rainstorms and up to 48 hours after a sewage overflow, there may be increased health risks from non-contact recreational activities, such as paddling, fishing, etc.”
Estimated downstream stretches on Seekonk River
136 estimated stretches from 17 outlets
Estimated downstream stretch — not checked by water sampling. Estimated by DirtyWaterWatch using U.S. Geological Survey river maps and flow measurements; not an official advisory area. This estimates water movement, not bacteria levels.
- Caution0 to 1.3 miles (0 to 2 km) below the outlet
0 to 1.3 miles (0 to 2 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 104
Combined sewer overflow (CSO) at outlet OF 104 “OF 104_Charles”. Began Nov 22, 2026, 11:50 PM EST; ended Nov 23, 2026, 1:05 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 104: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1 mile (0 to 1.6 km) below the outlet
0 to 1 mile (0 to 1.6 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 205
Combined sewer overflow (CSO) at outlet OF 205 “OF 205_Central_Front”. Began Nov 22, 2026, 9:27 PM EST; ended Nov 22, 2026, 11:29 PM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 205: about 1 hour, or as little as 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 0.2 miles (0 to 0.3 km) below the outlet
0 to 0.2 miles (0 to 0.3 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 214
Combined sewer overflow (CSO) at outlet OF 214 “OF 214 Jenks Way”. Began Nov 23, 2026, 12:25 AM EST; ended Nov 23, 2026, 1:10 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 214: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 0.02 miles (0 to 0.03 km) below the outlet
0 to 0.02 miles (0 to 0.03 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 215
Combined sewer overflow (CSO) at outlet OF 215 “OF 215_Division_River”. Began Nov 22, 2026, 10:00 PM EST; ended Nov 22, 2026, 11:05 PM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 215: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 0.3 miles (0 to 0.5 km) below the outlet
0 to 0.3 miles (0 to 0.5 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 210
Combined sewer overflow (CSO) at outlet OF 210 “OF 210_Main_High”. Began Nov 22, 2026, 9:45 PM EST; ended Nov 22, 2026, 11:15 PM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 210: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 0.02 miles (0 to 0.03 km) below the outlet
0 to 0.02 miles (0 to 0.03 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 215
Combined sewer overflow (CSO) at outlet OF 215 “OF 215_Division_River”. Began Nov 22, 2026, 11:50 PM EST; ended Nov 23, 2026, 1:10 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 215: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 0.3 miles (0 to 0.5 km) below the outlet
0 to 0.3 miles (0 to 0.5 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 210
Combined sewer overflow (CSO) at outlet OF 210 “OF 210_Main_High”. Began Nov 23, 2026, 12:20 AM EST; ended Nov 23, 2026, 1:15 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 210: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1.6 miles (0 to 2.6 km) below the outlet
0 to 1.6 miles (0 to 2.6 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 103
Combined sewer overflow (CSO) at outlet OF 103 “OF 103_High”. Began Nov 22, 2026, 9:20 PM EST; ended Nov 23, 2026, 1:30 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 103: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1.3 miles (0 to 2 km) below the outlet
0 to 1.3 miles (0 to 2 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 104
Combined sewer overflow (CSO) at outlet OF 104 “OF 104_Charles”. Began Nov 22, 2026, 9:50 PM EST; ended Nov 22, 2026, 10:25 PM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 104: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1 mile (0 to 1.6 km) below the outlet
0 to 1 mile (0 to 1.6 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 105
Combined sewer overflow (CSO) at outlet OF 105 “OF 105_Roosevelt_Cross”. Began Nov 23, 2026, 12:25 AM EST; ended Nov 23, 2026, 12:35 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 105: about 1 hour, or as little as 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1.1 miles (0 to 1.7 km) below the outlet
0 to 1.1 miles (0 to 1.7 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 203
Combined sewer overflow (CSO) at outlet OF 203 “OF 203_Middle_Carnation”. Began Nov 23, 2026, 12:15 AM EST; ended Nov 23, 2026, 1:30 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 203: about 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
- Caution0 to 1 mile (0 to 1.6 km) below the outlet
0 to 1 mile (0 to 1.6 km) below the outlet · from Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs, outlet OF 205
Combined sewer overflow (CSO) at outlet OF 205 “OF 205_Central_Front”. Began Nov 22, 2026, 11:30 PM EST; ended Nov 23, 2026, 1:43 AM EST, as the source gives them. The source gives no volume.
Estimated travel time from outlet OF 205: about 1 hour, or as little as 1 hour. Estimate based on the river's average yearly flow; no current gauge reading was available.
Showing 12 of 136 estimated stretches, nearest the outlets first.
Estimated routes below wastewater outlets with a current status
- Caution Permit RI0100072, outlet 101A · 14 miles (22.9 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 103A · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 104A · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 105A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 201A · 14 miles (22 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 202A · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 203A · 13 miles (21.6 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 204A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 205A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 206A · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 207A · 13 miles (21 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 208A · 13 miles (20.7 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 209A · 13 miles (20.7 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 210A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 211A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 212A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 213A · 13 miles (20.2 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 214A · 12 miles (20 km) estimated · Estimate stops here
- Caution Permit RI0100072, outlet 215A · 12 miles (19.8 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 101A · 14 miles (22.9 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 103A · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 104A · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 105A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 201A · 14 miles (22 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 202A · 14 miles (21.7 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 203A · 13 miles (21.5 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 204A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 205A · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 206A · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 207A · 13 miles (21 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 208A · 13 miles (20.7 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 209A · 13 miles (20.7 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 210A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 211A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 212A · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 213A · 13 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 214A · 12 miles (20 km) estimated · Estimate stops here
- Caution Permit RISS00024, outlet 215A · 12 miles (19.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.5 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (19.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (19.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.5 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.5 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (19.8 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.3 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.5 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (22.4 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 14 miles (21.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 12 miles (20.1 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (20.9 km) estimated · Estimate stops here
- Caution Permit RI0100072 · 13 miles (21.4 km) estimated · Estimate stops here
Source: DirtyWaterWatch estimates using U.S. Geological Survey river maps and flow measurements. The estimate stops at an estuary or the sea, the first lake or the distance limit.
The last 90 days
- Caution: to the latest update Radar estimate, no report received: heavy rain at the outlets of Narragansett Bay Commission18 reports: Narragansett Bay Commission 18
Show records
The records are also in the report table on this page.
- Combined sewer overflow (CSO), outfall OF 105, started Nov 23, 2026, 12:25 AM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 23, 2026, 12:25 AM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 206, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 210, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 23, 2026, 12:15 AM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 22, 2026, 11:50 PM EST
- Combined sewer overflow (CSO), outfall OF 215, started Nov 22, 2026, 11:50 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 22, 2026, 11:30 PM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 22, 2026, 10:15 PM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 22, 2026, 10:10 PM EST
- Combined sewer overflow (CSO), outfall OF 215, started Nov 22, 2026, 10:00 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 22, 2026, 10:00 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 22, 2026, 9:50 PM EST
- Combined sewer overflow (CSO), outfall OF 210, started Nov 22, 2026, 9:45 PM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 22, 2026, 9:45 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 22, 2026, 9:27 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 22, 2026, 9:20 PM EST
- Discharge or advisory reported: to 18 reports: Narragansett Bay Commission 18
Show records
The records are also in the report table on this page.
- Combined sewer overflow (CSO), outfall OF 214, started Nov 23, 2026, 12:25 AM EST
- Combined sewer overflow (CSO), outfall OF 105, started Nov 23, 2026, 12:25 AM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 206, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 210, started Nov 23, 2026, 12:20 AM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 23, 2026, 12:15 AM EST
- Combined sewer overflow (CSO), outfall OF 215, started Nov 22, 2026, 11:50 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 22, 2026, 11:50 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 22, 2026, 11:30 PM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 22, 2026, 10:15 PM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 22, 2026, 10:10 PM EST
- Combined sewer overflow (CSO), outfall OF 215, started Nov 22, 2026, 10:00 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 22, 2026, 10:00 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 22, 2026, 9:50 PM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 22, 2026, 9:45 PM EST
- Combined sewer overflow (CSO), outfall OF 210, started Nov 22, 2026, 9:45 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 22, 2026, 9:27 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 22, 2026, 9:20 PM EST
- End not confirmed: to 1 report: Narragansett Bay Commission 1
Show records
The records are also in the report table on this page.
- Caution: to Radar estimate, no report received: heavy rain at the outlets of Narragansett Bay Commission3 reports: Narragansett Bay Commission 3
Show records
The records are also in the report table on this page.
- Discharge or advisory reported: to 2 reports: Narragansett Bay Commission 2
Show records
The records are also in the report table on this page.
- Caution: to Radar estimate, no report received: heavy rain at the outlets of Narragansett Bay Commission19 reports: Narragansett Bay Commission 19
Show records
The records are also in the report table on this page.
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 8:00 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 7:45 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 8:30 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 7:45 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 7:26 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 6:45 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 6:34 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 6:25 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 5:31 AM EST
- Combined sewer overflow (CSO), outfall OF 213, started Nov 7, 2026, 5:25 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 4:30 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 4:10 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 4:05 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 11:55 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 10:10 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 4:10 AM EST
- Discharge or advisory reported: to 67 reports: Narragansett Bay Commission 67
Show records
The records are also in the report table on this page.
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 8:00 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 7:45 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 7:40 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 8:30 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 7:45 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 7:26 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 6:45 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 6:34 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 6:25 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 5:31 AM EST
- Combined sewer overflow (CSO), outfall OF 213, started Nov 7, 2026, 5:25 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 7, 2026, 4:30 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 7, 2026, 4:10 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 7, 2026, 4:05 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 11:55 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 10:10 PM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 8:05 PM EST
- Combined sewer overflow (CSO), outfall OF 204, started Nov 6, 2026, 7:45 PM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 6, 2026, 7:45 PM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 7:35 PM EST
- Combined sewer overflow (CSO), outfall OF 215, started Nov 6, 2026, 7:30 PM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 6, 2026, 7:30 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 7:30 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 7:25 PM EST
- Combined sewer overflow (CSO), outfall OF 105, started Nov 6, 2026, 7:25 PM EST
- Combined sewer overflow (CSO), outfall OF 206, started Nov 6, 2026, 7:20 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 7:20 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 7:15 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 6, 2026, 7:14 PM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 6, 2026, 6:30 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 6:05 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 6:05 PM EST
- Combined sewer overflow (CSO), outfall OF 101, started Nov 6, 2026, 6:00 PM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 6, 2026, 5:00 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 4:50 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 4:50 PM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 4:50 PM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 6, 2026, 4:33 PM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 4:10 PM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 11:45 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 6, 2026, 11:15 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 6, 2026, 11:07 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 10:55 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 6, 2026, 6:08 AM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 5:55 AM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 5:45 AM EST
- Combined sewer overflow (CSO), outfall OF 204, started Nov 6, 2026, 5:40 AM EST
- Combined sewer overflow (CSO), outfall OF 103, started Nov 6, 2026, 5:35 AM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 5:30 AM EST
- Combined sewer overflow (CSO), outfall OF 203, started Nov 6, 2026, 5:30 AM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 5:20 AM EST
- Combined sewer overflow (CSO), outfall OF 207, started Nov 6, 2026, 5:15 AM EST
- Combined sewer overflow (CSO), outfall OF 105, started Nov 6, 2026, 5:15 AM EST
- Combined sewer overflow (CSO), outfall OF 101, started Nov 6, 2026, 5:15 AM EST
- Combined sewer overflow (CSO), outfall OF 217, started Nov 6, 2026, 5:15 AM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 4:55 AM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 4:45 AM EST
- Combined sewer overflow (CSO), outfall OF 206, started Nov 6, 2026, 4:40 AM EST
- Combined sewer overflow (CSO), outfall OF 201, started Nov 6, 2026, 4:30 AM EST
- Combined sewer overflow (CSO), outfall OF 214, started Nov 6, 2026, 4:25 AM EST
- Combined sewer overflow (CSO), outfall OF 105, started Nov 6, 2026, 4:15 AM EST
- Combined sewer overflow (CSO), outfall OF 210, started Nov 6, 2026, 4:15 AM EST
- Combined sewer overflow (CSO), outfall OF 104, started Nov 6, 2026, 4:10 AM EST
- Combined sewer overflow (CSO), outfall OF 101, started Nov 6, 2026, 4:05 AM EST
- Combined sewer overflow (CSO), outfall OF 205, started Nov 6, 2026, 4:04 AM EST
Source: DirtyWaterWatch calculations using the reports named above and the published status rules. Updated 2026-11-25 22:57 UTC.
Reported discharges over time
- Discharges affecting the Seekonk River in Rhode Island, last 12 months8989 affecting this stretch: 47 reported on the Seekonk River; 42 arriving from outfalls upstream on the Blackstone River, Narragansett Bay Commission - Bucklin Point; the Pawtucket River, Narragansett Bay Commission - Bucklin Point; outfalls further up the Seekonk River (Narragansett Bay Commission - Bucklin Point)December 2025 to November 2026Verified reports where available, else notices; revisions and duplicates counted once. Arriving discharges are estimated from modeled downstream reaches.
- Days with a discharge affecting the Seekonk River in Rhode Island, last 12 months7Reported on the Seekonk River: 6 · Arriving from outfalls upstream on the Blackstone River, Narragansett Bay Commission - Bucklin Point; the Pawtucket River, Narragansett Bay Commission - Bucklin Point; outfalls further up the Seekonk River (Narragansett Bay Commission - Bucklin Point), estimated: 5 (counted apart; together they need not equal the total)December 2025 to November 2026A day counts once however many discharges were under way on it.
- Hours with a discharge or advisory status on the Seekonk River in Rhode Island, last 12 months204Reported on the Seekonk River: 204 · Arriving from outfalls upstream on the Blackstone River, Narragansett Bay Commission - Bucklin Point; the Pawtucket River, Narragansett Bay Commission - Bucklin Point; outfalls further up the Seekonk River (Narragansett Bay Commission - Bucklin Point), estimated: 140 (counted apart; together they need not equal the total)December 2025 to November 2026Red hours by the map's rules: each discharge to its reported end plus the state's post-discharge period; overlapping hours count once.
- 2026 season with a discharge or advisory status on the Seekonk River in Rhode Island0.0%May to October 2026; incomplete source coverageShare of May 1 to October 31 hours with red status by the map's rules, of the hours a source covered.
- Records behind the last-90-days strip for the Seekonk River in Rhode Island94Reported on the Seekonk River: 47 · Arriving from outfalls upstream on the Blackstone River, Narragansett Bay Commission - Bucklin Point; the Pawtucket River, Narragansett Bay Commission - Bucklin Point; outfalls further up the Seekonk River (Narragansett Bay Commission - Bucklin Point), estimated: 41 · Other records (rain-likely and similar): 6last 90 daysEvery distinct record the strip lists for its red, yellow and unresolved hours, notices and unresolved reports included; counted as the strip counts them.
Sanitary sewer overflow (SSO): sewage spills from a sewer meant to carry sewage separately from rainwater. Treatment bypass: wastewater skips one or more treatment steps. Blended discharge: wastewater that skipped some treatment is mixed with treated wastewater. Outfall: a pipe or outlet where wastewater enters a water body.
Reported discharges per month
91 reported discharges, January 2022 to November 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- Incomplete source coverage
The U.S. Environmental Protection Agency's sewer overflow records are limited: they hold only what operators file with the agency. The U.S. Environmental Protection Agency's facility reports for Rhode Island are limited: they hold only what operators file with the agency. The Narragansett Bay Commission feed shows current overflows only; our record begins October 5, 2026.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover January 1, 2022 to November 25, 2026.
Show table
| Month | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Counted from | Coverage |
|---|---|---|---|---|---|---|
| January 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2025 | 2 | 0 | 0 | 2 | Source records | Incomplete source coverage |
| March 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| September 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| December 2025 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| January 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| February 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| March 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| April 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| May 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| June 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| July 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| August 2026 | 1 | 0 | 0 | 1 | Source records | Incomplete source coverage |
| September 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| October 2026 | 0 | 0 | 0 | 0 | Incomplete source coverage | |
| November 2026 | 88 | 0 | 0 | 88 | Source records |
Hours with a discharge or advisory status per month
Hours when this water had a discharge or advisory status under DirtyWaterWatch rules.
- Discharge or advisory reported
- Incomplete source coverage
3 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here. The U.S. Environmental Protection Agency's sewer overflow records are limited: they hold only what operators file with the agency. The U.S. Environmental Protection Agency's facility reports for Rhode Island are limited: they hold only what operators file with the agency. The Narragansett Bay Commission feed shows current overflows only; our record begins October 5, 2026.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Month | Hours with a discharge or advisory status | Hours from post-discharge periods | Hours in the month | Coverage |
|---|---|---|---|---|
| January 2022 | 0 | 0 | 744 | Incomplete source coverage |
| February 2022 | 0 | 0 | 672 | Incomplete source coverage |
| March 2022 | 0 | 0 | 744 | Incomplete source coverage |
| April 2022 | 0 | 0 | 720 | Incomplete source coverage |
| May 2022 | 0 | 0 | 744 | Incomplete source coverage |
| June 2022 | 0 | 0 | 720 | Incomplete source coverage |
| July 2022 | 0 | 0 | 744 | Incomplete source coverage |
| August 2022 | 0 | 0 | 744 | Incomplete source coverage |
| September 2022 | 0 | 0 | 720 | Incomplete source coverage |
| October 2022 | 0 | 0 | 744 | Incomplete source coverage |
| November 2022 | 0 | 0 | 720 | Incomplete source coverage |
| December 2022 | 0 | 0 | 744 | Incomplete source coverage |
| January 2023 | 0 | 0 | 744 | Incomplete source coverage |
| February 2023 | 0 | 0 | 672 | Incomplete source coverage |
| March 2023 | 0 | 0 | 744 | Incomplete source coverage |
| April 2023 | 0 | 0 | 720 | Incomplete source coverage |
| May 2023 | 0 | 0 | 744 | Incomplete source coverage |
| June 2023 | 0 | 0 | 720 | Incomplete source coverage |
| July 2023 | 0 | 0 | 744 | Incomplete source coverage |
| August 2023 | 0 | 0 | 744 | Incomplete source coverage |
| September 2023 | 0 | 0 | 720 | Incomplete source coverage |
| October 2023 | 0 | 0 | 744 | Incomplete source coverage |
| November 2023 | 0 | 0 | 720 | Incomplete source coverage |
| December 2023 | 0 | 0 | 744 | Incomplete source coverage |
| January 2024 | 0 | 0 | 744 | Incomplete source coverage |
| February 2024 | 0 | 0 | 696 | Incomplete source coverage |
| March 2024 | 0 | 0 | 744 | Incomplete source coverage |
| April 2024 | 0 | 0 | 720 | Incomplete source coverage |
| May 2024 | 0 | 0 | 744 | Incomplete source coverage |
| June 2024 | 0 | 0 | 720 | Incomplete source coverage |
| July 2024 | 0 | 0 | 744 | Incomplete source coverage |
| August 2024 | 0 | 0 | 744 | Incomplete source coverage |
| September 2024 | 0 | 0 | 720 | Incomplete source coverage |
| October 2024 | 0 | 0 | 744 | Incomplete source coverage |
| November 2024 | 0 | 0 | 720 | Incomplete source coverage |
| December 2024 | 0 | 0 | 744 | Incomplete source coverage |
| January 2025 | 0 | 0 | 744 | Incomplete source coverage |
| February 2025 | 57 | 57 | 672 | Incomplete source coverage |
| March 2025 | 0 | 0 | 744 | Incomplete source coverage |
| April 2025 | 0 | 0 | 720 | Incomplete source coverage |
| May 2025 | 0 | 0 | 744 | Incomplete source coverage |
| June 2025 | 0 | 0 | 720 | Incomplete source coverage |
| July 2025 | 0 | 0 | 744 | Incomplete source coverage |
| August 2025 | 0 | 0 | 744 | Incomplete source coverage |
| September 2025 | 0 | 0 | 720 | Incomplete source coverage |
| October 2025 | 0 | 0 | 744 | Incomplete source coverage |
| November 2025 | 0 | 0 | 720 | Incomplete source coverage |
| December 2025 | 0 | 0 | 744 | Incomplete source coverage |
| January 2026 | 0 | 0 | 744 | Incomplete source coverage |
| February 2026 | 0 | 0 | 672 | Incomplete source coverage |
| March 2026 | 0 | 0 | 744 | Incomplete source coverage |
| April 2026 | 0 | 0 | 720 | Incomplete source coverage |
| May 2026 | 0 | 0 | 744 | Incomplete source coverage |
| June 2026 | 0 | 0 | 720 | Incomplete source coverage |
| July 2026 | 0 | 0 | 744 | Incomplete source coverage |
| August 2026 | 0 | 0 | 744 | Incomplete source coverage |
| September 2026 | 0 | 0 | 720 | Incomplete source coverage |
| October 2026 | 0 | 0 | 744 | Incomplete source coverage |
| November 2026 | 204 | 204 | 595 |
Days with a reported discharge per month
A day counts when any counted discharge was under way on it, from its start to its reported end in Eastern Time; a report with no end counts its start day.
- Incomplete source coverage
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover January 1, 2022 to November 25, 2026.
Show table
| Month | Days with a reported discharge | Coverage |
|---|---|---|
| January 2022 | 0 | Incomplete source coverage |
| February 2022 | 0 | Incomplete source coverage |
| March 2022 | 0 | Incomplete source coverage |
| April 2022 | 0 | Incomplete source coverage |
| May 2022 | 0 | Incomplete source coverage |
| June 2022 | 0 | Incomplete source coverage |
| July 2022 | 0 | Incomplete source coverage |
| August 2022 | 0 | Incomplete source coverage |
| September 2022 | 0 | Incomplete source coverage |
| October 2022 | 0 | Incomplete source coverage |
| November 2022 | 0 | Incomplete source coverage |
| December 2022 | 0 | Incomplete source coverage |
| January 2023 | 0 | Incomplete source coverage |
| February 2023 | 0 | Incomplete source coverage |
| March 2023 | 0 | Incomplete source coverage |
| April 2023 | 0 | Incomplete source coverage |
| May 2023 | 0 | Incomplete source coverage |
| June 2023 | 0 | Incomplete source coverage |
| July 2023 | 0 | Incomplete source coverage |
| August 2023 | 0 | Incomplete source coverage |
| September 2023 | 0 | Incomplete source coverage |
| October 2023 | 0 | Incomplete source coverage |
| November 2023 | 0 | Incomplete source coverage |
| December 2023 | 0 | Incomplete source coverage |
| January 2024 | 0 | Incomplete source coverage |
| February 2024 | 0 | Incomplete source coverage |
| March 2024 | 0 | Incomplete source coverage |
| April 2024 | 0 | Incomplete source coverage |
| May 2024 | 0 | Incomplete source coverage |
| June 2024 | 0 | Incomplete source coverage |
| July 2024 | 0 | Incomplete source coverage |
| August 2024 | 0 | Incomplete source coverage |
| September 2024 | 0 | Incomplete source coverage |
| October 2024 | 0 | Incomplete source coverage |
| November 2024 | 0 | Incomplete source coverage |
| December 2024 | 0 | Incomplete source coverage |
| January 2025 | 0 | Incomplete source coverage |
| February 2025 | 2 | Incomplete source coverage |
| March 2025 | 0 | Incomplete source coverage |
| April 2025 | 0 | Incomplete source coverage |
| May 2025 | 0 | Incomplete source coverage |
| June 2025 | 0 | Incomplete source coverage |
| July 2025 | 0 | Incomplete source coverage |
| August 2025 | 0 | Incomplete source coverage |
| September 2025 | 0 | Incomplete source coverage |
| October 2025 | 0 | Incomplete source coverage |
| November 2025 | 0 | Incomplete source coverage |
| December 2025 | 0 | Incomplete source coverage |
| January 2026 | 0 | Incomplete source coverage |
| February 2026 | 0 | Incomplete source coverage |
| March 2026 | 0 | Incomplete source coverage |
| April 2026 | 0 | Incomplete source coverage |
| May 2026 | 0 | Incomplete source coverage |
| June 2026 | 0 | Incomplete source coverage |
| July 2026 | 0 | Incomplete source coverage |
| August 2026 | 1 | Incomplete source coverage |
| September 2026 | 0 | Incomplete source coverage |
| October 2026 | 0 | Incomplete source coverage |
| November 2026 | 6 |
Reported discharges per year, 2019 to 2026
91 reported discharges, 2019 to 2026.
- Combined sewer overflow
- Sanitary sewer overflow
- Treatment bypass, blended or other
- Incomplete source coverage
The U.S. Environmental Protection Agency's sewer overflow records are limited: they hold only what operators file with the agency. The U.S. Environmental Protection Agency's facility reports for Rhode Island are limited: they hold only what operators file with the agency. The Narragansett Bay Commission feed shows current overflows only; our record begins October 5, 2026.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Year | Combined sewer overflow | Sanitary sewer overflow | Treatment bypass, blended or other | Total | Coverage |
|---|---|---|---|---|---|
| 2019 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2020 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2021 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2022 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2023 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2024 | 0 | 0 | 0 | 0 | Incomplete source coverage |
| 2025 | 2 | 0 | 0 | 2 | Incomplete source coverage |
| 2026 | 89 | 0 | 0 | 89 | Incomplete source coverage |
Reported volume per year
Gallons; 1 million gallons is 3.79 million litres (axis: K thousand, M million), summed from the 1 report that gave a volume as a number (90 did not).
- Incomplete source coverage
90 of 91 discharge reports gave no volume as a number; only numbers are summed.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Year | Reported volume | Reports with a volume | Reports without a volume | Coverage |
|---|---|---|---|---|
| 2019 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2020 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2021 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2022 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2023 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2024 | 0 gallons (0 litres) | 0 | 0 | Incomplete source coverage |
| 2025 | 4,258 gallons (16,100 litres) | 1 | 1 | Incomplete source coverage |
| 2026 | 0 gallons (0 litres) | 0 | 89 | Incomplete source coverage |
Hours with a discharge or advisory status per year
Hours with a discharge or advisory status each year under DirtyWaterWatch rules; 2026 to date.
- Discharge or advisory reported
- Incomplete source coverage
3 discharge reports have no end time and are not marked ongoing; under DirtyWaterWatch rules they show caution, not a discharge or advisory status, and add no hours here.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Year | Hours with a discharge or advisory status | Share of the year | Coverage |
|---|---|---|---|
| 2019 | 0 | 0.0% | Incomplete source coverage |
| 2020 | 0 | 0.0% | Incomplete source coverage |
| 2021 | 0 | 0.0% | Incomplete source coverage |
| 2022 | 0 | 0.0% | Incomplete source coverage |
| 2023 | 0 | 0.0% | Incomplete source coverage |
| 2024 | 0 | 0.0% | Incomplete source coverage |
| 2025 | 57 | 0.7% | Incomplete source coverage |
| 2026 | 204 | 2.6% | Incomplete source coverage |
Reported discharges by calendar month, all years
Every counted discharge report, by the calendar month it began.
Months are summed over every year a tracked source covers; the table gives the number of years behind each month.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Month | Reported discharges | Years of records |
|---|---|---|
| January | 0 | 0 |
| February | 2 | 0 |
| March | 0 | 0 |
| April | 0 | 0 |
| May | 0 | 0 |
| June | 0 | 0 |
| July | 0 | 0 |
| August | 1 | 0 |
| September | 0 | 0 |
| October | 0 | 1 |
| November | 88 | 1 |
| December | 0 | 0 |
Reported discharges by wastewater outlet
Wastewater outlets with the most tracked discharge records: 10 of 15, all years. Counts depend on reporting coverage and do not measure legal compliance or harm.
The U.S. Environmental Protection Agency's sewer overflow records are limited: they hold only what operators file with the agency. The U.S. Environmental Protection Agency's facility reports for Rhode Island are limited: they hold only what operators file with the agency. The Narragansett Bay Commission feed shows current overflows only; our record begins October 5, 2026.
Sources: U.S. Environmental Protection Agency sewer overflow records; U.S. Environmental Protection Agency facility reports for Rhode Island; Narragansett Bay Commission combined sewer overflow feed. Records cover November 29, 2019 to November 25, 2026.
Show table
| Wastewater outlet | Reported discharges |
|---|---|
| OF 103 OF 103_High | 16 |
| OF 205 OF 205_Central_Front | 12 |
| OF 201 OF 201_East_Roosevelt | 10 |
| OF 217 OF 217 Tidewater St | 9 |
| OF 104 OF 104_Charles | 9 |
| OF 214 OF 214 Jenks Way | 8 |
| OF 105 OF 105_Roosevelt_Cross | 4 |
| OF 203 OF 203_Middle_Carnation | 4 |
| OF 206 OF 206_Blackstone_Roosevelt | 3 |
| OF 210 OF 210_Main_High | 3 |
| Other outlets (5) | 10 |
| Outlet not stated | 3 |
How these charts are counted
We count each discharge once. Where a source publishes notices and confirmed reports, we use confirmed reports for an operator's month when available; otherwise we use notices. We combine revisions and exclude duplicate state reports copied by the U.S. Environmental Protection Agency (EPA). Monthly and yearly totals appear separately. Status hours follow our rules. Shaded gaps mean missing coverage, not zero discharges.
- U.S. Environmental Protection Agency sewer overflow records: records from November 29, 2019 to the latest update (limited records)
- U.S. Environmental Protection Agency facility reports for Rhode Island: records from February 11, 2024 to the latest update (limited records)
- Narragansett Bay Commission combined sewer overflow feed: records from October 5, 2026 to the latest update
Reports linked to Seekonk River
| When | Report | Status |
|---|---|---|
| to 1:10 AM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume in each report map | to Nov 26, 1:10 AM |
| to 1:10 AM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | to Nov 26, 1:10 AM |
| to 12:35 AM | Narragansett Bay Commission · OF 105 OF 105_Roosevelt_Cross · CSO · volume not reported report · notice · map | to Nov 26, 12:35 AM |
| to 12:25 AM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume in each report map | to Nov 26, 1:15 AM |
| to 12:25 AM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | to Nov 26, 12:25 AM |
| to 1:05 AM | Narragansett Bay Commission · OF 206 OF 206_Blackstone_Roosevelt · CSO · volume not reported report · notice · map | to Nov 26, 1:05 AM |
| to 1:15 AM | Narragansett Bay Commission · OF 210 OF 210_Main_High · CSO · volume not reported report · notice · map | to Nov 26, 1:15 AM |
| to Nov 23, 1:20 AM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | to Nov 26, 1:20 AM |
| to Nov 23, 12:35 AM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | to Nov 26, 12:35 AM |
| to 11:15 PM | Narragansett Bay Commission · OF 210 OF 210_Main_High · CSO · volume not reported report · notice · map | to Nov 25, 11:15 PM |
| to Nov 23, 1:30 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | to Nov 26, 1:30 AM |
| to 12:15 PM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 9:00 PM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 7:45 PM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume in each report map | ended |
| to 7:45 PM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | ended |
| to 7:55 PM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 8:40 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 7:55 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 5:35 AM | Narragansett Bay Commission · OF 213 OF 213 East St · CSO · volume not reported report · notice · map | ended |
| to 4:35 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to Nov 7, 12:00 AM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 10:20 PM | Narragansett Bay Commission · OF 103 OF 103_High · CSO · volume not reported report · notice · map | ended |
| to 8:20 PM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | ended |
| to 8:40 PM | Narragansett Bay Commission · OF 214 OF 214 Jenks Way · CSO · volume not reported report · notice · map | ended |
| to 7:50 PM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | ended |
| to 7:30 PM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume in each report map | ended |
| to 7:30 PM | Narragansett Bay Commission · OF 217 OF 217 Tidewater St · CSO · volume not reported report · notice · map | ended |
| to 8:05 PM | Narragansett Bay Commission · OF 105 OF 105_Roosevelt_Cross · CSO · volume not reported report · notice · map | ended |
| to 7:50 PM | Narragansett Bay Commission · OF 206 OF 206_Blackstone_Roosevelt · CSO · volume not reported report · notice · map | ended |
Showing the latest 25 records of 48 records.See them all with filters.
All reports in Rhode Island by year: 2026 (47 here) · 2025 (1 here)
State water quality assessment
Rhode Island's 2024 water quality assessment lists Seekonk River as impaired by fecal coliform bacteria. The state names combined sewer overflows and municipal wastewater discharges as confirmed sources. Rhode Island's assessment of Seekonk River (EPA How's My Waterway)
This is the state's assessment of past samples (not a current condition) and does not change the status. How we match assessments to waters
Source: state water quality assessments via U.S. Environmental Protection Agency ATTAINS, national file of November 21, 2026, map layers edited September 2, 2026, 2024 cycle, assessment unit RI0007019E-01, retrieved 2026-11-23 18:33 UTC. Units matched to this water by DirtyWaterWatch. · EPA national assessment file (ZIP, 206 MB)
Records as cited: RI0007019E-01 (2024).
Wastewater outlets on this water
No wastewater outlet in our records is linked to this water.
Sewer operators listed for this water: Narragansett Bay Commission - Bucklin Point WWTF and associated CSOs.
Boat launches
No public boat launch is listed in our records for this water.
Nearby waters
- Pawtucket River, RI Caution about 0.6 miles (1 km) away
- Moshassuck River, RI Caution about 2.5 miles (4 km) away
- Olney Pond, RI No current status shown about 2.5 miles (4 km) away
- West River, RI Caution about 3.1 miles (5 km) away
- Seekonk River, RI Caution about 3.1 miles (5 km) away
Sources covering this water
- ECHO NPDES Sewer Overflow and Bypass Event Dataset · Latest check succeeded · Last successful check: 2026-11-25 22:28 UTC
- NOAA MRMS radar-only rainfall estimate (QPE), 1 to 72 hours, ImageServer · Latest check succeeded · Last successful check: 2026-11-25 22:49 UTC
- reported to regulators · Latest check succeeded · Last successful check: 2026-11-25 22:40 UTC
- NBC CSO Alarm Map live outfall status (JSON) · Latest check succeeded · Last successful check: 2026-11-25 22:40 UTC
48 records linked to this water. Updated .